Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19290E120 + (Proposed Schedule for follow-on Discovery.Urges Consistency W/Regulations by Granting 14 Days for Interrogatories & 30 Days for Documents & Depositions.Privilege Should Be Granted to TMI Alert,Ucs & Sholly Only.W/Certificate of Svc)
- ML14254A207 + (Proposed Schedule for the Review of Additional Information Regarding the Application from Entergy Nuclear Operations, Inc. for Renewal of Operating Licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3)
- CNRO-2003-00016, Proposed Schedule of Submittal of License Renewal Applications for Entergy Plants + (Proposed Schedule of Submittal of License Renewal Applications for Entergy Plants)
- ML20080S090 + (Proposed Schedule of Util,Nrc & M Lewis for Hearing of Contentions I-62,V-3a,V-3b & V-4.Certificate of Svc Encl)
- ML19330A254 + (Proposed Schedule to Expedite Proceeding & to Obtain ASLB Views Re Siting.Suggests 710721 for Qa/Qc Areas Examination within ASLB Discretion)
- ML21025A424 + (Proposed Schedules for a Meeting with PRB Regarding 10-13-2020 2.206 Petition Request from the Public Watchdogs)
- ML12362A317 + (Proposed Scheduling Order Changes)
- ML18142A749 + (Proposed Second Level of Undervoltage Protection - Relay Setpoints)
- ML20079Q316 + (Proposed Second Supplemental Findings of Fact & Conclusions of Law for Partial Initial Decision on QA Issues. Certificate of Svc Encl)
- ML20009B041 + (Proposed Secondary Water Chemistry Monitoring Program)
- ML19275A261 + (Proposed Secondary Water Chemistry Monitoring Programs)
- ML18085A974 + (Proposed Section 3 Tech Spec Changes for Facility.License Conditions Encl)
- ML19340E776 + (Proposed Section 6.4 to Tech Specs)
- 3F0804-02, Proposed Security Measures to Have Been Taken in Lieu of Interim Compensatory Measures Identified in NRC Security Order Dated February 25, 2002 (EA-02-026) + (Proposed Security Measures to Have Been Taken in Lieu of Interim Compensatory Measures Identified in NRC Security Order Dated February 25, 2002 (EA-02-026))
- ML090230486 + (Proposed Security Plan Changes for Steam Generator Replacement)
- ML20217M254 + (Proposed Sequence for Full Scale Exercise - 990921)
- ML16281A381 + (Proposed Severe Accident Research Program Plan)
- ML21361A173 + (Proposed Sim JPM)
- ML23038A166 + (Proposed Sim JPM)
- ML23160A059 + (Proposed Sim JPM)
- ML21137A296 + (Proposed Sim JPMs)
- ML23146A077 + (Proposed Sim JPMs)
- ML23012A136 + (Proposed Sim and Inplant System JPMs)
- ML072560145 + (Proposed Site Emergency Plan Change)
- ML17277A659 + (Proposed Snubber Tech Spec)
- ML19207B340 + (Proposed Solid Waste Process Control Program)
- ML20077N076 + (Proposed Spec 15.4.6.A.2 Re Emergency Power Sys Periodic Tests)
- ML20115D047 + (Proposed Spec 2.7(2)j Re Starts of EDG During Preplanned Preventive Maint or Testing)
- ML20127B697 + (Proposed Spec 3/4.3.4 Re Test Interval for Reheat Stop & Intercept Valves)
- ML20036B791 + (Proposed Spec 4.15.1.E.2 Re Relocation of Quarterly 125-volt Battery Equalization Requirement)
- ML20079G978 + (Proposed Spec 4.4.5.4.a.9 Re Preservice Insp Requirements for Steam Generator Tubing)
- ML20036C102 + (Proposed Spec 4.6.A, SI & Containment Spray Sys & Spec 4.6.B, Emergency Feedwater Pumps, Changing Testing Frequency to Be Consistent W/Asme Section XI Inservice Testing Program)
- ML20085N375 + (Proposed Spec 5.2.B Re Control Rod Absorber Matl)
- ML20034H328 + (Proposed Spec LCO 3.3.7.1 Re Radiation Monitoring Instrumentation & Spec LCO 3.7.2 Re CR Emergency Recirculation Sys)
- ML17266A507 + (Proposed St Lucie Plant Preoperational & Operational Biological Monitoring Program)
- ML020300294 + (Proposed Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout Rule (10 CFR 50.63) for License Renewal That Was Issued for Comments on November 14, 2001)
- ML013180508 + (Proposed Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout Rule for License Renewal)
- ML020600100 + (Proposed Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout (SBO) Rule (10 CFR 50.63) for License Renewal (10 CFR 54.4(a)(3)))
- ML021370320 + (Proposed Staff Guidance on the Identification and Treatment of Electrical Fuse Holders for License Renewal)
- ML090350419 + (Proposed Staff Guidance on the Position of the Gall Report Presenting One Acceptable Way to Manage Aging Effects for License Renewal)
- ML013300531 + (Proposed Staff Guidance on the Position of the Gall Report Presenting One Acceptable Way to Manage Aging Effects for License Renewal)
- ML023190479 + (Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter))
- L-84-001, Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter) + (Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter))
- ML16197A196 + (Proposed Staff Position Regarding Inclusion of a Containment Spray System in the AP600 Design)
- ML030290263 + (Proposed Standard License Renewal Application Format Package)
- ML16197A347 + (Proposed Standard Review Plan Sections and Regulatory Guides for Risk-Informed, Performance-Based Regulation)
- ML16204A182 + (Proposed Standard Review Plan for Dry Cask Storage Systems)
- ML20236S674 + (Proposed Standard Technical Specifications for Permanently Defueled Westinghouse Plants.Draft Report for Comment)
- ML17146A423 + (Proposed Startup Physics Test Summary Description)
- ML18136A045 + (Proposed Startup Test Procedure 1-ST-9,Revision 0, Voltage Profile)
- ML20034F771 + (Proposed Stated TS Section Re Steam & Power Conversion Sys)