Proposed Spec 15.4.6.A.2 Re Emergency Power Sys Periodic Tests
ML20077N076
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/09/1991
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20077N072 List:
References
NUDOCS 9108140201
Download: ML20077N076 (1)


Text

. l

,. j l

15.4.6 EMERGENCY POWER SYSlEM PERIODIC TESTS  ;

ereliubflih Applies to periodic testing and surveillance requirements of the emergency power system.

Db.iective To verify that the emergency power system will respond promptly and properly when required.

Splc_Lfkation The following tests and surveillance shall be performed as stated:

A. Diesel Generators

1. Manually-initiated start of the diesel generator, followed by manual synchronization with other power sources and assumption of load by the diesel generator shall not exceed 2850KW. This test will be conducted monthly with a minimum running time of 30 minutes on each diesel generator. Normal plant operation will :,ot be affected.
2. Automatic start of each diesel generator, load shedding, and restor-ation to operatio:. of particular vital equipment, initiated by an actual interruption of normal AC station service power supplies to associated engineered safety systems busses together with a simulated safety injection signal. In addition, af ter the diesel generator has carried its load for a minimum of 5 minutes, automatic load shedding and restoration of vital loads are tested again by manually tripping the diesel generator output breaker., This test will'be~ conducted during reactor shutdown for major' fuel reloading of iach reactor to assure that the_ diesel generator will(stert and assume _ required load in'accordance with the timing' sequence listed.in FSAR Section~8;-

Ah-test-will be condueted-duehg-recetoe-shutdown-foe-majoe-fuel reload hg-o f-each-reacte e-to-assu re-th a t-t he-44ese4-g enera tem 144 start-and-eswmc reau tred4ead-4 n - 1 e;;-than-the-peruds4 hied-in FSAR-Seet4 eft-Br2 af ter the initial starting signal . During this test a checkout of emergency lighting will be performed, including the changeover relay for DC lights.

. m u amot t ot >

i DR ,mca: L owgp Unit 1 - Amendment No. 91 15.4.6-1 April 28, 1985 Unit 2 - Amendment No. 95 L