Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000361/LER-2002-007, Pressurizer Spray Valve Malfunction Results in a Reactor Trip + (Pressurizer Spray Valve Malfunction Results in a Reactor Trip)
- ML24173A330 + (Pressurizer Surge Line Inspection Program)
- ML20210D685 + (Pressurizer Surge Line Thermal Stratification for B&W 177-FA Nuclear Plants Summary Rept Fatigue Stress Analysis of Surge Line Elbows)
- ML20244A842 + (Pressurizer Surge Line Thermal Stratification Phase I Program)
- ML20086E386 + (Pressurizer Surge Line Transient Justification)
- ML20260A556 + (Pressurizer Surge Line from LOOP B to Pressurizer 1-T1 10-RC-2501R-Z (Inside CTMT) Unit 1, as-built)
- ML063620058 + (Pressurizer Surge, Safety, Relief, and Spray Nozzle Alloy 82/182 Fabrication Detail)
- ML071020381 + (Pressurizer Surge, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071060002 + (Pressurizer Surge, Spray Safety and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071020063 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Water Corrosion)
- ML071570458 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071570267 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071160436 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071080257 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071070076 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071060042 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071030261 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071020514 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071020046 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071060182 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071020423 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071290532 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML071020370 + (Pressurizer Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress-Corrosion Cracking)
- ML18130A335 + (Pressurizer Vent Modification. Actual Drawing Number 12846.51-PKS-1-4)
- ML18130A336 + (Pressurizer Vent Modification. Actual Drawing Number 12846.51-PKS-2-4)
- ML17319A960 + (Pressurizer Venting Operation)
- CP-200800609, Pressurizer Weld Overlay 60 Day Report and Results of the Final Pdi/Ut Examination of Weld Overlays + (Pressurizer Weld Overlay 60 Day Report and Results of the Final Pdi/Ut Examination of Weld Overlays)
- L-07-143, Pressurizer Weld Overlay Examination Report + (Pressurizer Weld Overlay Examination Report)
- L-06-163, Pressurizer Weld Overlay Examination Report + (Pressurizer Weld Overlay Examination Report)
- BYRON 2007-0059, Pressurizer Weld Overlay Examination Results Related to Byron Station Relief Request 13R-08 + (Pressurizer Weld Overlay Examination Results Related to Byron Station Relief Request 13R-08)
- ML073390388 + (Pressurizer Weld Overlay Examination Results and Closeout of Confirmatory Action Letter Requirements)
- BW070087, Pressurizer Weld Overlay Examination Results Related to Braidwood Station Relief Request I2R-48 + (Pressurizer Weld Overlay Examination Results Related to Braidwood Station Relief Request I2R-48)
- BW080050, Pressurizer Weld Overlay Examination Results Related to Braidwood Station Relief Request I2R-48 + (Pressurizer Weld Overlay Examination Results Related to Braidwood Station Relief Request I2R-48)
- BYRON 2006-0119, Pressurizer Weld Overlay Examination Results Related to Relief Request I3R-08 + (Pressurizer Weld Overlay Examination Results Related to Relief Request I3R-08)
- ML073040011 + (Pressurizer Weld Overlay Examination Results to Relief Request G-RR-1)
- ML063620409 + (Pressurizer Weld Overlay Examination Results to Relief Request G-RR-1)
- ENS 45467 + (Pressurizer and Feedwater Storage Tank Level Indications Do Not Meet Appendix R Requirements)
- ML071060005 + (Pressurizer, Surge, Spray, Safety, and Relief Nozzle Weld Susceptibility to Primary Water Stress Corrosion Cracking)
- ML20212K126 + (Prestressed Concrete Reactor Vessel Tendon Interim Surveillance Rept. W/Four Oversize Drawings)
- ML14134A425 + (Prestressed Concrete Slab Notes & Typical Details El 35 Ft 6 Inches & 42 Ft Areas 2,5,6,7)
- ML14134A427 + (Prestressed Concrete Slab Sections & Details El 35 Ft 6 Inches & 42 Ft Areas 2,5,6,7. Sheet 1)
- ML22151A265 + (Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LAR)
- EPID:L-2022-LRM-0041 + (Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LAR)
- ML22083A107 + (Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides))
- EPID:L-2022-LRM-0021 + (Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides))
- ML22007A259 + (Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR)
- PMNS20211044, Presubmittal Meeting - X-Energy Topical Report on Control Room Staffing Analysis Methodology + (Presubmittal Meeting - X-Energy Topical Report on Control Room Staffing Analysis Methodology)
- ML19309F686 + (Presubmittal Meeting 2 on Topical Report - Nonprop (Public))
- ML24124A007 + (Presubmittal Meeting EP Plan Change Meeting Slides)
- EPID:L-2024-LRM-0066 + (Presubmittal Meeting EP Plan Change Meeting Slides)
- ML18032A331 + (Presubmittal Meeting Regarding Inverters AOT Slides - February 1, 2018)