Salem and Hope Creek Inverter Allowed Outage Time Extension PSEG Pre-Submittal Meeting with NRC, February 1, 2018
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Meeting Purpose Describe future license amendment requests Establish common understanding of scope of requests Establish a common understanding of schedule Obtain NRC feedback 2
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Current Licensing Basis Salem
- With one inverter inoperable,
- Energize associated vital instrument bus within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
- Restore inoperable A, B, or C inverter within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- Restore inoperable D inverter within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Hope Creek
- With one or both inverters in one channel inoperable
- Energize associated 120 volt AC distribution panel(s) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
- Restore inverter(s) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 3
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Proposed Change Salem
- With one inverter inoperable,
- Energize associated vital instrument bus within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
- Restore inverter within 7 days Hope Creek
- With one or both inverters in one channel inoperable
- Energize associated 120 volt AC distribution panel(s) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
- Restore inverter(s) within 7 days 4
PSEG Pre-Submittal Meeting with NRC, February 1, 2018
Background
Salem
- Four 115 Vac vital instrument buses supplied from individual Uninterruptible Power Supplies (UPS) for each unit
- UPS power sources
- Normal 230 Vac
- Backup 125 Vdc battery
- Alternate 230 Vac (line regulator and static switch) 5 Norm AC Supply DC Supply Alt AC Supply A
'A' 230V vital A 125V
'A' 230V vital B
'B' 230V vital B 125V B' 230V vital C
'C' 230V vital C 125V C' 230V vital D
'B' 230V vital B 125V B' 230V vital
PSEG Pre-Submittal Meeting with NRC, February 1, 2018
Background
Hope Creek
- Four independent Class 1E power system channels
- Two 120 Vac vital instrument buses per channel each supplied by UPS
- UPS power sources
- Normal 480 Vac
- Backup 125 Vdc battery
- Backup 480 Vac (voltage regulator and static switch) 6
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Need for proposed changes On-line corrective maintenance and post-maintenance testing has challenged current AOTs Proposed AOT extensions
- Allow more rigorous troubleshooting and application of human performance tools for emergent issues
- Can reduce risk associated with shutting down to respond to emergent issues without significant change in at-power risk 7
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 License Amendment Request Scope Traditional Engineering Assessment
- Adequate defense-in-depth maintained
- Each defense-in-depth consideration to be addressed
- Required inverters maintained OPERABLE
- Operator response to LOOP with inverter(s) out of service
- Procedures to start and load EDGs if required
- Safety margins not affected - within current design basis
- Continued monitoring under the M-rule program and PSEG performance and predictive monitoring programs 8
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 License Amendment Request Scope Probabilistic analysis
- Applicable guidance and criteria
- RG 1.174, Rev. 3
- RG 1.200, Rev. 2
- RG 1.177, Rev. 1
- Salem
- Quantitative analyses for internal events and flood
- Qualitative analyses for fire and external events
- Hope Creek
- Quantitative analyses for internal events, fire and internal flood
- Qualitative analyses for external events
- Uncertainty addressed using NUREG-1855, Rev. 1 and supporting EPRI documents 9
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Precedent Palo Verde Nuclear Generating Station, ML10270352 Clinton Power Station, ML061160181 10
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Schedule Submit by March 30, 2018 Request review per normal NRC timeline 11