MONTHYEARML24220A1002024-08-20020 August 2024 August 20, 2024, PSEG Pre-Planning Meeting Slides for Salem Stretch Power Uprate Project ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24052A3902024-02-27027 February 2024 PSEG Presentation for Presubmittal Meeting Regarding Improved Technical Specifications Conversion on February 27, 2024 (Slides) ML24053A1282024-02-27027 February 2024 24 Month Fuel Cycle Pre-Submittal Meeting Presentation ML23291A1392023-10-18018 October 2023 PSEG Presentation Slides for Pre Submittal Meeting on 10-24-2023 ML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23144A0072023-05-24024 May 2023 PSEG Slides: NRC Pre-Submittal Meeting, May 25, 2023 ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22132A0042022-05-26026 May 2022 PSEG Pre-submittal Meeting Slides - May 26, 2022 ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21083A2852021-03-24024 March 2021 Ultimate Heat Sink (UHS) - NRC Pre-submittal Meeting, March 30, 2021 (EPID L-2021-LRM-0036) (Slides) ML21057A0012021-03-0404 March 2021 PSEG Slides - NRC Pre Submittal Meeting, March 4, 2021 ML20294A0632020-10-20020 October 2020 Presentation Replacement of SRMs and IRMs with Digital Numac Wide Range Neutron Monitor System for October 27, 2020, Public Meeting ML20195A3962020-07-13013 July 2020 Pseg/Nrc Pre-Submittal Meeting - Salem Pressurizer Weld Interval Extension Request for Alternative (Presentation Slides) - July 20, 2020 ML20112F2802020-04-21021 April 2020 NRC Review of Seismic Risk Assessment in Hope Creek 50.69 LAR - PRA Licensing Branch C, Division of Risk Assessment, Office of Nuclear Reactor Regulation - May 4, 2020 ML20104C0352020-04-15015 April 2020 Pseg/Nrc Pre-Submittal Meeting, Salem Expanded Scope Leak-Before-Break Amendment Request - April 15, 2020 ML19316B7382019-11-12012 November 2019 CFR 50.69 License Amendment Request, Pre-Submittal Meeting, November 12, 2019, Presentation by PSEG Nuclear LLC ML19127A1702019-05-0707 May 2019 Safety Related UPS Replacement ML19101A3982019-04-10010 April 2019 Annual Assessment Presentation Slides 2019 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18163A3952018-06-13013 June 2018 June 13-14, 20187, Meeting Slide Regarding NRC-Industry MP4 ISG-06 R2 Tabletop, Hope Creek Power Range Neutron Monitor Numac Digital Upgrade Pre-Application Coordination Meeting ML18156A0172018-05-30030 May 2018 Annual Assessment Meeting Slides 05-30-2018 ML18032A3312018-02-0101 February 2018 Presubmittal Meeting Regarding Inverters AOT Slides - February 1, 2018 ML17291B0822017-10-18018 October 2017 Supplemental Inspection Results ML17199S2902017-07-19019 July 2017 TSTF-411 and TSTF-418 Pre-submittal Meeting Slides ML17194A6912017-07-12012 July 2017 Revised PSEG Handouts for July 13, 2017 Public Meeting on TSTF-542 Proposed License Amendment Request ML17194A6922017-07-12012 July 2017 Insert Page for PSEG Handouts for July 13, 2017 Public Meeting on TSTF-542 Proposed License Amendment Request ML17191A3442017-07-10010 July 2017 PSEG Handouts for July 13, 2017 Public Meeting on TSTF-542 Proposed License Amendment Request ML17191A3932017-07-10010 July 2017 PSEG Handouts for July 13, 2017 Public Meeting on TSTF-542 Proposed License Amendment Request ML17097A1762017-04-0707 April 2017 PSEG Annual Assessment Meeting Handout Presentation ML16355A4992016-12-21021 December 2016 Measurement Uncertainty Recapture (Mur) Power Uprate: Pre-Submittal Meeting ML16202A1442016-07-19019 July 2016 Public Telecon Regarding LAR to Upgrade Power Range Neutron Monitoring System (Meeting Handout) ML16141A3682016-05-31031 May 2016 Meeting Slides Updated Issues List for April 19, 2016, Hope Creek Public Teleconference Concerning the Digital Prnm Upgrade LAR ML16089A0702016-03-30030 March 2016 Public Meeting Slide Presentation LR-N15-0016, Pre-Application Meeting: Installation of Digital Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I&C-ISG-062015-01-21021 January 2015 Pre-Application Meeting: Installation of Digital Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I&C-ISG-06 ML14162A4402014-06-12012 June 2014 Salem Generating Station, Near-term Task Force Recommendation 2.1 Seismic Hazard Evaluation, Public Meeting Presentation Slides ML14162A4322014-06-11011 June 2014 PSEG Slides for Seismic Reevaluation Public Meeting ML13064A3232013-02-28028 February 2013 NRC Presentation on Bypass Testing ML1129700652011-10-21021 October 2011 Summary of PSEG Drop-in Visit, 9-28-2011 and Slides ML1125200382011-09-19019 September 2011 Summary of, Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML11181A1802011-06-29029 June 2011 Meeting Slides Rev 2, Nuclear Safety Culture Assessment (NSCA) Process: NRC Observations on February 2011 Pilot ML1113601722011-05-10010 May 2011 NRC Slides for 2011 Aam, Salem/Hope Creek ML1107605812011-03-11011 March 2011 Slides- Audit of Salem'S Use of Westems Fatigue Software ML1032805762010-11-17017 November 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, LRA - Meeting Slides ML1021102682010-08-0404 August 2010 Enclosure 5: PSEG Nuclear LLC - Hope Creek Presentation of July 28, 2010 Public Meeting ML1014605102010-05-27027 May 2010 Pseg'S NRC ISFSI Presentation May 27, 2010 ML1014701832010-05-26026 May 2010 PSEG Drop-in May 26, 2010 - NRC Slides 2024-08-20
[Table view] |
Text
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Salem and Hope Creek Inverter Allowed Outage Time Extension
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Meeting Purpose Describe future license amendment requests Establish common understanding of scope of requests Establish a common understanding of schedule Obtain NRC feedback 2
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Current Licensing Basis Salem
- Energize associated vital instrument bus within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
- Restore inoperable A, B, or C inverter within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- Restore inoperable D inverter within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Hope Creek
- With one or both inverters in one channel inoperable
- Energize associated 120 volt AC distribution panel(s) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
- Restore inverter(s) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 3
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Proposed Change Salem
- Energize associated vital instrument bus within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
- Restore inverter within 7 days Hope Creek
- With one or both inverters in one channel inoperable
- Energize associated 120 volt AC distribution panel(s) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
- Restore inverter(s) within 7 days 4
PSEG Pre-Submittal Meeting with NRC, February 1, 2018
Background
Salem
- Four 115 Vac vital instrument buses supplied from individual Uninterruptible Power Supplies (UPS) for each unit
- Normal 230 Vac
- Backup 125 Vdc battery
- Alternate 230 Vac (line regulator and static switch)
Norm AC Supply DC Supply Alt AC Supply A 'A' 230V vital A 125V 'A' 230V vital B 'B' 230V vital B 125V B' 230V vital C 'C' 230V vital C 125V C' 230V vital D 'B' 230V vital B 125V B' 230V vital 5
PSEG Pre-Submittal Meeting with NRC, February 1, 2018
Background
Hope Creek
- Four independent Class 1E power system channels
- Two 120 Vac vital instrument buses per channel each supplied by UPS
- Normal 480 Vac
- Backup 125 Vdc battery
- Backup 480 Vac (voltage regulator and static switch) 6
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Need for proposed changes On-line corrective maintenance and post-maintenance testing has challenged current AOTs Proposed AOT extensions
- Allow more rigorous troubleshooting and application of human performance tools for emergent issues
- Can reduce risk associated with shutting down to respond to emergent issues without significant change in at-power risk 7
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 License Amendment Request Scope Traditional Engineering Assessment
- Adequate defense-in-depth maintained
- Each defense-in-depth consideration to be addressed
- Operator response to LOOP with inverter(s) out of service
- Procedures to start and load EDGs if required
- Safety margins not affected - within current design basis
- Continued monitoring under the M-rule program and PSEG performance and predictive monitoring programs 8
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 License Amendment Request Scope Probabilistic analysis
- Applicable guidance and criteria
- RG 1.174, Rev. 3
- RG 1.200, Rev. 2
- RG 1.177, Rev. 1
- Quantitative analyses for internal events and flood
- Qualitative analyses for fire and external events
- Quantitative analyses for internal events, fire and internal flood
- Qualitative analyses for external events
- Uncertainty addressed using NUREG-1855, Rev. 1 and supporting EPRI documents 9
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Precedent Palo Verde Nuclear Generating Station, ML10270352 Clinton Power Station, ML061160181 10
PSEG Pre-Submittal Meeting with NRC, February 1, 2018 Schedule Submit by March 30, 2018 Request review per normal NRC timeline 11