PRESSURIZER VENTING OPERATION AEP/AMP REYISION 0 MARCH 1981 F'DR 8107210420 810715 PDR ADOCK 05000315

~ 1 PRESSURIZER VENTING OPERATION A. PURPOSE The objective of this instruction is to specify the required operator actions and precautions necessary to vent non-condensible gases from the pressurizer vapor space. This instruction may also be used as an alternate method of depressurizing 'the reactor coolant system which may be required by the actions of another operating instruction.

B. INITIAL CONDITIONS CAUTION: The pressurizer vent should rot 'be used as the primary means of depressurizing the RC$ during an inadequate core cooling event. Refer to Inadequate Core Cooling Guidelines-for appropriate operator actions and precautions.

NOTE: This guideline assumes that the reactor containment conditions are near normal "nd: an accurate pr essurizer pressure and level indication <is available.

CAUTION: Do not open the pressurizer vent while the safety injection system is in operation unless an RCS depressurization is required by an Emergency Operating Instruction.

1. Sampling has indicated the presence of a significant quantity of non-condensible gases in the pressurizer vapor space.
2. Abnormal'onditions have been experienced with the pressurizer level and pressure control systems
3. Pressurizer spray is -ineffective in reducing the pressurizer pressure.

March, 1981 Revision 0 Page 1

4. Plant events have occurred (such as inadvertent gas addition, accumulator tank discharge, core uncovery, etc.) that may result in non-condensible gases being collected in the pressurizer.
5. An RCS depressurization is required .by another operating instruction and pressurizer spray is~not available and/or the use of the power operated relief~ valves is not desirable.
6. The reactor vessel head has been vented, if required, prior to venting the pressurizer .

, C. IMMEDIATE ACTIONS None KttE'P i NOTE: If the pressurizer is being vented because large quantities of non-condensible gases are preventing a depressurization, then the actions of steps marked by an asterisk are not applicable.

1. Terminate any changes to the reactor coolant system that may be in progress and bring the RCS to as-close to a steady-state condition. as possible.
  • 2. If not already performed, sample the pressurizer vapor space for the presence of non-condensible gases. If a signficant quantity of non-condensible gases is not found, then return to the appropriate operating instruction.

March, 1981 Revision 0 Page 2

'1

l

~ g ~

3. In preparation for venting; isolate the containment purge and exhaust systems and the pressure vacuum relief line and start all available containment air circu lation equipment
4. Increase the RCS sub-cooling to (insert plant specific value wnich is 50'F above the value which is the sum of the errors for the temperature measurement system used, and for the pressure measurement system translated into temperature using the sat-uration tables) by either initiating an RCS pressurization or by dumping steam from the non-faulted steam generators.

NOTE: If the pressurizer is being vented for the purpose of initiating RHR operation and the RCS temperature is less than 350'F, then additional sub-cooling margin is not required.

5. Perform the actions of Appendix A to determine the maximum allowable time period or venting.
6. If no+ already performed, manually block the low pressure SI-if initiation the permissive is energized.

CAUTION:

The venting operation may result in pressure decreasing below the SI setpoint. Action should be taken to manually block the automatic SI signal when the permissive is energized.

  • 7. Increase charging flow to maximum to limit the depressurization rate during the venting period.

Pressurizer level will trend upward during the venting operation.

March, 1981 Revision 0 Page 3

0 I E

8. Open the vent isolation valves in one pressurizer vent flowpath.

NOTE'f one or both valves fail to open, close both valves and open the isolation valves in the parallel flow path.

9. Close both vent isolation valves when:

a) The time period determined in Step 5 is met, OR

  • b) Pressurizer pressure decreases by 200 psi, OR c) Pressurizer level increases above 80 of span, OR d) Reactor coolant sub-cooling deer ases below (insert plant specific valve which is the sum of the errors for the temperature measurement system used, and for the pressure measurement system translated into temperature using the

'aturation tables). I

10. Re-establish normal charging flow and restore the pressurizer water level to the normal operating range.

ll. If the venting was terminated prior to removing enough of the non-condensible gases to restore normal pressurizer control or to reduce pressure to the required condition, then return to Step 4.

NOTE: If multiple venting operations are required and the containment hydrogen concentration is equal to or greater than 3 volume percent, the provisions must be made to March, 1981 Revision 0 Page 4

5 BESSURIZ ER I

F l&IJRE 2 J a/a%i 'ate DONALD C. COO< NUCLEAR rLANT uNIT NOS. 1 AND.Z

"'A,HaTL rCCN7I't SKI a C t1

'L'ar llUab Is(7OPa XILgl '

T I=. i~a a'.anal Ut.N'V LIN>>

Y" ~ flY>>

Qt f.

0 F "L c. Iat > I 0

'5 5t.h 8 t'a'6 . 5 o Ti l Ht. Rag aaI!.:1 TLatb)~'.IQQ'i Dovsa- '~liaa. Ate SOLE, HO I Ea

~

5 L 'ii Ll". 'aa=a I:.

.a Vni Va= VALVF

~ -0 Ig I I I

I I

'V v I

+-e)ILL EI.O~I': flILl. nt'L'I4

-~OLf.;.:)I'b UEN7

~ I I

I I

I I

I

RIAL;a=' I I I

ThMC.L FLIa.n ~g I.

MQT a- I "t ~<<l>CIIf. ~ EMIR UrdIT I,

)I TflAIIJ - arl 6, TIEAI~!

2 E./a E.!) B 'VRA,I< ll'l ALACK Hl ALAIIVI 0I417 U/ah l T SRN E Fdg Sort[ REACTOR.

RNO PRCS~uR I?.Eg VENTS

\r~

a C<SL.t'.l I.

tlgfaa> X)EN ~ ltF.'3t'I t'LaM ) l G'Q VKhhY'lMF.

bw> RO ~ Puu. Iatg.

IiCAg fOR HEAb VGrUT t tao Pf 'ESSUR'ZER HEAD VCILT LOGIC- QIACRAYl F c, . s Dca4 J a Q//$ 0/s'/

<< ~ I 0 0 SHT. FLOYI VALVE NUMBER FUNCTION I} I A SVSTEIn NO. G 924i9A 330 DRV}NING CONTROL SYSTEM 110E197 Sh.2 92498 331 DRUM}IING CONTROL SYSTEH 110E197 Sh.2 92490 332 DRfRf}IING CO}<<TROL SYSTEM 110E197 Sh.2 9249D 333 DRU}OIING CONTROI SYSTFH IIOLI97>> .2 9249E 334 DRU}f}GNG CONTROI. SYSTEM 110E 197 S}1. 2 9249P 335 DRV}OfING CONTROL SYSTFH 110E197 S}I. 2 9250A 336 DRLYfMIC CONTROL SYSTAf 110E197 Sh.2 9250B 337 DRIDQ}ING COhTROL SYST}2f 110E197 Sh.2 92500 33B DRIBQflttG CONTROL SYSTEM 110E197 Sh.2 9250D 339 DR}BOflt}C CONTROL SYSTEM 110E197 Sh.2 9250E 340 DRUHHINC CONTROL SYSTEH I IOEI97 Sh. 2 9250" 341 DRUMMING CONTROL SYSTEH 110E197 Sh.2 9236 342 DRIPHIhG CONTROL SYSTEM 110E197 S}L. 2 9239A 9239B 343 DRU}0}ttiC CONTROL SYSTKH 110E197 Sh.2 9244 344 DRU}QII}tC CONTROL SYSTEM 110E197 Sh.2 I- PV-I <<3- PV- I 220 PRESSURI'ZKF<<'. VER I ISOLATION zG54c44 I-PV-2 2- PV- R 220 PRESSURE!ZER. VEh'T ISOLA~ION Zf"5 C44 I-Pv-3 2-Pf- 3 2zl PRE.SBURI Z E' VE.NT150LATION 2fc 54C4 4 I-PV-4} 2-FV- 4 22 I P'R'FSSURIZEI." VER i !SOLAR 109<< zf-.5m4 4 I-HV'~! >-I-IV-.l 220 HEAD VE.I '<<T ISO} ANION zc 5 con I-IHV-2. "I-IV-c; P<<Y

                                                                   <<             I-IK&~}VFNI I&r31 WW}OM 2Q 5-SC4 I-WV-3 2 HV-3 221          HK AD VE.NT IGC>LA'PION Zt" 54C-k 4 I-HV-4, 2. I-IV-4 22 I-IE.<<E<<D VE.N ISOLA ION Zf" 6 4C44 i'             i EC}<       ate gI<<!fIf;EL<<<<'EY0 27<<50 g~<I t<<rn
                                              <<'<<P. ~

g C<<AE<<<</Akll 359

                              <>
                              ~ ll I>>     fl J<<  o ~~

U Qg r <<

                                     <<t ny<<o I                            r<<

O 0

                                             >n I                l             A r          }               X O

ii Z 0 I 0 Z rm T-

                                    <<7 0

n

>> << ~
                                    <<<<<< tV
             '                      1 L

I<<<<

  ~  >> >>

pl - ~

                                            .Qz

0 e ~

     ~ ~
         ) a
             )

lOA VAt.VE

                   ~p I-PV-3 Rll                                                                2- PV-3 OPEN                                                                      I- PV.4 RI2                                                                  2-PV-+

I-HV- 3 2-HV. 3 R21 D PEII I- HV- $ R22 2-HV" r 4J I O IOA, Ncr. ENCRGI=E. 2o 20 20 20 0 rr.O ra. n TO OPEN he [hc NOTES I. 5 UALVE NO. "'rp'AGN=TIC

2. I/O SEE SS. 9EV. ~AM.P. ~ Sate.T l~

REE.D SWI TCHES

3. CASL= TRAIN Yi"s'i~pnouse Ele"Ir'c Corp"raliol Mv~
                                                                                      ,,, INDIANA AND MICHIGAN ELECTRIC                  CO.~

LQC C UNIT NO 182. ELEMENTARY Vr 1RIII 1 6 SOLE.NOID VAL'VE rip/ 5QLBQ. 7 g J. 6a-~/A >/~ SHEET- 22 I

0 CP 5~

4. The maximum allowable venting period is then determined from curve 81 (RCS Pressure vs. Hydrogen Flow Rate). This curve was generated from a calculation which determined the flow rate of hydrogen at various RCS pressures through a 3/8" orificed line. The calculation assumed pure hydrogen which is conservative since the gaseous void in the vessel head will probably be some mixture of gases including steam.

February, 1981 Revision 0 Page 12

 ~ ~

r

y ~ ~ ~ ooae ~0 ~ ~4 Oat ~ ~0 ~0 ~ O~ ~0

ATTACHi~)ENT 5 TO AEP:HRC:05i'8}}