Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203J660 + (Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3)
- ML19008A494 + (Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019)
- ML22238A346 + (Post-Shutdown Decommissioning Activities Report Public Meeting Transcript, Pages 1-132, July 21, 2022)
- ML22200A071 + (Post-Shutdown Decommissioning Activities Report Public Meeting Slides - July 21, 2022)
- HBL-08-006, Post-Shutdown Decommissioning Activities Report, Revision 2, and Request for NRC Coordination of Section 106 of the National Historic Preservation Act + (Post-Shutdown Decommissioning Activities Report, Revision 2, and Request for NRC Coordination of Section 106 of the National Historic Preservation Act)
- ML22262A303 + (Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022)
- ML20055F620 + (Post-Shutdown Decommissioning Activities Report (PSDAR) Public Meeting, July 23, 2019, Pages 1-114)
- 3F0614-02, Post-Shutdown Decommissioning Activities Report - Response to Request for Additional Information + (Post-Shutdown Decommissioning Activities Report - Response to Request for Additional Information)
- ML19009A171 + (Post-Shutdown Decommissioning Activities Report, NRC Public Meeting January 15, 2019)
- L-PI-24-040, Post-Submittal Package Letter + (Post-Submittal Package Letter)
- ML18044A381 + (Post-TMI Evaluation Task 2,Conceptual Design for Reactor Vessel Level Monitoring Sys. Sixteen Oversize Drawings Encl)
- ML20033B496 + (Post-TMI Update of Testimony Re Atlantic County Contention 1 on Impacts on Tourism.Conclusions Reached in Previous Testimony Remain Valid.Prof Qualifications Encl)
- Regulatory Guide 1.103 + (Post-Tensioned Prestressing Systems for Concrete Reactor Vessels and Containments)
- ML20247F132 + (Post-Tensioning Sys Evaluation,Callaway Unit 1 Containment & Wolf Creek Unit 1 Containment)
- ML20041E664 + (Post-Tensioning Sys Surveillance for June-Jul 1980 LaSalle County Nuclear Power Station Unit 1 Containment Structure)
- ML19256D536 + (Post-Tensioning Sys,First Tendon Surveillance Program)
- ML20077H677 + (Post-Test Analysis of 1153 Series a Pressure Transmitter for Westinghouse PWR Sys Div)
- ML19344A585 + (Post-Test Analysis of Intl Std Problem 10 Using RELAP4/MOD7, Preliminary Assessment Rept)
- ML19323G197 + (Post-Test Analysis of Loft Loss-of-Coolant Experiment L2-3)
- ML20023B050 + (Post-Test Calculation of Loft Intermediate Break Experiment L5-1 & Severe Core Transient Experiment L8-2, Interim Rept)
- ML20011D778 + (Post-Test Insp for Loss of Cooling Test Performed on 851101)
- RIS 2006-23, Post-Tornado Operability of Ventilating and Air-Conditioning (VAC) Systems Housed in Emergency Diesel Generator (EDG) Rooms + (Post-Tornado Operability of Ventilating and Air-Conditioning (VAC) Systems Housed in Emergency Diesel Generator (EDG) Rooms)
- RIS 2006-23, Post-Tornado Operability of Ventilating and Air-Conditioning (Vac) Systems Housed in Emergency Diesel Generator (EDG) Rooms + (Post-Tornado Operability of Ventilating and Air-Conditioning (Vac) Systems Housed in Emergency Diesel Generator (EDG) Rooms)
- ML092860053 + (Post-Trial Brief of David Geisen with Proposed Findings of Fact and Conclusions of Law)
- ML20129E033 + (Post-Trip Review Guidelines)
- ML20148D993 + (Post-Trip Transient Investigation,Assessment & Reporting)
- ML20133G691 + (Post-Warranty Run, Operational Readiness Review)
- 05000366/LER-1981-083-03, Post-accident Monitoring Torus Water Level Indicator a Read Higher than Indicator B. Caused by Leaking Equalizer Valve Which Drained Ref Leg for a Torus Water Transmitter.Valve Stem Replaced + (Post-accident Monitoring Torus Water Level Indicator a Read Higher than Indicator B. Caused by Leaking Equalizer Valve Which Drained Ref Leg for a Torus Water Transmitter.Valve Stem Replaced)
- 05000272/FIN-2015007-01 + (Post-fire Safe Shutdown Operator Manual Actions to Align Temporary Ventilation Not Assessed for Feasibility and Reliability)
- ML22299A091 + (Post-fire-SMiRT-Weerakkody-Final)
- ML20077H725 + (Post-hearing Brief Opposing Joint Intervenors & Governor Deukmejian Motions to Reopen Record on Const Qa.Requirements for Reopening Record Not Met.Certificate of Svc Encl)
- ML20209F002 + (Post-hearing Brief Re Issues Raised at ASLB 850521 & 22 Evidentiary Hearings.Nrc Required by NEPA to Evaluate Alternative of Constructing & Operating Dry Cask Storage Facility,But Failed to Perform Even Cursory Review)
- ML20127F045 + (Post-hearing Brief Requesting Board Find in Util Favor Re Proposed OL Amend Authorizing Receipt & Storage of Up to 500 Spent Nuclear Fuel Assemblies.No Basis from Sabotage or Human Error Considerations for Denying Proposed Amend)
- ML20127F048 + (Post-hearing Brief Requesting Board Find in Util Favor Re Proposed OL Amend Authorizing Receipt & Storage of Up to 500 Spent Nuclear Fuel Assemblies.No Basis from Sabotage or Human Error Considerations for Denying Proposed Amend)
- ML19282A075 + (Post-hearing Brief Submitted by Licensee Re Issues Arising During 790327 Oral Argument Before Aslb.Responds to Positions of NRC & State of Il.Certificate of Svc Encl)
- ML20096C471 + (Post-hearing Brief in Support of Application for Exemption Re Phases I-IV of Low Power Testing)
- ML20024E348 + (Post-hearing Brief of Governor Deukmejian in Support of Motion to Reopen Record on Const Qa.Util Lack of Compliance W/Commission Regulations for QA Irrefutably Demonstrated. Certificate of Svc Encl)
- ML19323G595 + (Post-hearing Conference Memorandum Submitting Statement of Position Re Impact of ALAB-590,wording of Citizens Association for Sound Energy Contentions & Intervenors Proposed Qa/Qc Contention.Certificate of Svc Encl)
- ML19323A718 + (Post-hearing Memorandum Re Aircraft Crash Probability Issue. Urges That ASLB Initial Decision Be Affirmed Due to Proper Performance of Probability Analysis.Urges Amend of Tech Spec 6.9.1.5.b Re Movements of Aircrafts.Certificate of Svc Encl)
- ML19330A171 + (Post-hearing Order Reflecting Decisions of Counsel & ASLB at 720626 Meeting, & Extending Time for Mm Cherry to File Affidavit from 720626 to 0703.Certificate of Svc Encl)
- ML19254F199 + (Post-hearing Proposed Findings of Fact & Conclusions of Law. CPC Did Not Attempt to Prevent Disclosure of Matl Info Re Dow Chemical Co Intentions Under Steam & Electric Contracts W/Cpc.W/Certificate of Svc)
- ML19317H332 + (Post-hearing Reply Memorandum in Opposition to Intervenors Request to Consider Aircraft Crash Probability Issue.Request Is Beyond Aslab Jurisdiction Per Hearing Notice.Issue May Be Pursued Under 10CFR2.206.Certificate of Svc Encl)
- ML20062K537 + (Post-hearing Submittal Re Contentions.Certificate of Svc Encl)
- ML19224B436 + (Post-incident Radiation Survey Schedule)
- ML19260B236 + (Post-insp Restart Testing Program)
- ML20039A720 + (Post-test Analysis of Loss-of-Fluid Tests L3-2 & L3-7, Interim Rept)
- 05000529/LER-2002-002 + (Post-test Constants Entered into Core Protection Calculator System)
- ML20100K170 + (Post-test Exam of Tdi Emergency Diesel Generator 103 on 841107-12.Related Correspondence)
- ML20063H638 + (Post-weld Heat Treatment Test Results)
- ML19323E899 + (Post:Subroutine for Path Ordering of Sabotage Targets)
- ML23201A166 + (Postage Meter System (PMS) Office of Administration Privacy Threshold Analysis (Pta))