Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- SVP-11-069, Post Outage Inservice Inspection (ISI) Summary Report + (Post Outage Inservice Inspection (ISI) Summary Report)
- SVP-10-044, Post Outage Inservice Inspection (ISI) Summary Report + (Post Outage Inservice Inspection (ISI) Summary Report)
- SVP-09-045, Post Outage Inservice Inspection (ISI) Summary Report + (Post Outage Inservice Inspection (ISI) Summary Report)
- ML033350417 + (Post Performance Meeting Slides from 11/25/03)
- ML20235X737 + (Post Refueling Outage Startup Test Rept,Unit 1 Cycle 12)
- ML081130531 + (Post Reg. Conference Reference Material - Simulator Review of JPM EP009-CR-001)
- ML13319B114 + (Post SD Decommissioning Activities Rept for Songs,Unit 1)
- ML21048A072 + (Post Shutdown Activities Report (PSDAR) Comment Extension FRN)
- ML21048A071 + (Post Shutdown Activities Report (PSDAR) Comment Extension Letter)
- ML18320A034 + (Post Shutdown Decommissioning Activities Report)
- NG-20-0027, Post Shutdown Decommissioning Activities Report + (Post Shutdown Decommissioning Activities Report)
- CY-14-021, Post Shutdown Decommissioning Activities Report (Psdar), Revision 4 + (Post Shutdown Decommissioning Activities Report (Psdar), Revision 4)
- ML17163A019 + (Post Shutdown Decommissioning Activities Report Public Meeting)
- ML032260147 + (Post Shutdown Decommissioning Activities Report, Amendment 4)
- ML050940217 + (Post Shutdown Decommissioning Activities Report, Revision 4)
- ML20196A845 + (Post Shutdown Decommissioning Activities Rept)
- BVY 14-078, Post Shutdown Decommissioning Activities Report and Site Site Specific Decommissioning Cost Estimate + (Post Shutdown Decommissioning Activities Report and Site Site Specific Decommissioning Cost Estimate)
- ML18201A307 + (Post Shutdown Decommissioning Activities Report (PSDAR) Public Meeting Presentation)
- ML19354A698 + (Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3)
- ML22179A078 + (Post Shutdown Decommissioning Activities Report (PSDAR) Review for Palisades Nuclear Plant)
- ML20358A232 + (Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant)
- EPID:L-2020-LLM-0003 + (Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant)
- ML071340153 + (Post Strike (Reintegration) Inspection Plan Draft)
- ML071340156 + (Post Strike (Reintegration) Inspection Plan, August 12, 2003)
- ML071340164 + (Post Strike Briefing Including Oyster Creek Post Strike (Reintegration) Inspection Plan August 12, 2003)
- ML071340162 + (Post Strike Monitoring Activities - Updated 8/21/03)
- PMNS20240046, Post Submittal Meeting Regarding LES License Amendment Request to Raise Enrichment Limit to Less than 10 Weight Percent Uranium 235 + (Post Submittal Meeting Regarding LES License Amendment Request to Raise Enrichment Limit to Less than 10 Weight Percent Uranium 235)
- ML20324A070 + (Post TSTF-505 RICT Adoption from 11/19/2020 Quarterly Meeting)
- ML20150D854 + (Post Test Calculation of the Pbf Loc-11B & Loc-11C Experiments Using RELAP4/MOD6, Interim Rept.Loca Blowdown Transient Experiments Conducted to Verify Computer Code)
- ML032740101 + (Post Written Exam Analysis)
- ML023240550 + (Post Written Exam Comments)
- ML17326B152 + (Post-Accident Core Damage Assessment Methodology)
- ML20003E261 + (Post-Accident Decontamination Studies, Informal Progress Rept for Mar 1981)
- ML20008F285 + (Post-Accident Decontamination Studies, Informal Monthly Progress Rept for Feb 1981)
- ML20004B550 + (Post-Accident Decontamination Studies, Monthly Progress Rept for Apr 1981)
- ML19341B978 + (Post-Accident Decontamination Studies, Monthly Progress Rept for Jan 1981)
- ML19270G075 + (Post-Accident Heat Removal:Debris Bed Experiments D-2 & D-3)
- ENS 50034 + (Post-Accident Hydrogen Sample Analyzers Out-Of-Service)
- ML20262H671 + (Post-Accident Liquid Sampling System, as-built.Sheet 2 of 2)
- ML22119A172 + (Post-Accident Monitoring (PAM) Report)
- ENS 41463 + (Post-Accident Monitoring Instrumentation Inoperable)
- NRC 2007-0010, Post-Accident Monitoring Instrumentation Report Inoperability of One Channel of Containment Wide Range Pressure Transmitter + (Post-Accident Monitoring Instrumentation Report Inoperability of One Channel of Containment Wide Range Pressure Transmitter)
- ML102430204 + (Post-Accident Monitoring Report)
- ML091190158 + (Post-Accident Monitoring Report)
- ML071410078 + (Post-Accident Monitoring Report)
- ML20137M377 + (Post-Accident Radiation Monitoring Sys, Final Design Description)
- ML20261A395 + (Post-Accident Sample Station Flow Diagram. Sheet 1 of 2)
- ML20261A384 + (Post-Accident Sample Station Flow Diagram. Sheet 2 of 2. No Rev Date)
- ML17212B632 + (Post-Accident Sampling Sys Instrumentation)
- ML20262J281 + (Post-Accident Sampling Sys NUREG-0737 Sect II.B.3. Actual Drawing Number Is 13007-54-EM-1A-10)
- ML13322A771 + (Post-Accident Sampling Sys,Capabilities & Description)