Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Page 1 of 2 PNP HDI 2022-022 10 CFR 50.82(a)(4)
June 28, 2022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket Nos. 50-255 and 72-007 Renewed Facility Operating License No. DPR-20
Subject:
Post Shutdown Decommissioning Activities Report (PSDAR) Review for Palisades Nuclear Plant
References:
[1] Letter from US Nuclear Regulatory Commission (NRC) to Holtec Decommissioning International, LLC (HDI), Palisades Nuclear Plant - Holtec Proposed Post Shutdown Decommissioning Activities Report with Site-Specific Decommissioning Cost Estimate (ADAMS Accession No. ML21011A067), dated 2/1/2021.
[2] Palisades Nuclear Plant and ISFSI and Big Rock Point and ISFSI - Order Approving Direct and Indirect Transfers of Licenses and Draft Conforming Administrative License Amendments (EPID L-2020-LLM-0003) (ADAMS Accession No. ML21292A146), dated 12/13/2021
[3] Letter from HDI to US NRC, Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant (ADAMS Accession No. ML20358A232), dated 12/23/2020.
In accordance with Title 10 Code of the Federal Regulations (CFR) 50.82 Termination of license section (a)(4)(i), Holtec Decommissioning International, LLC hereby reports to the Nuclear Regulatory Commission (NRC), and copying the affected State, that the licenses were transferred from Entergy Nuclear Palisades, LLC (ENP) to Holtec Palisades, LLC on June 28, 2022.
This Palisades Nuclear Plant Post Shutdown Decommissioning Activities Report (PSDAR) was contingent upon NRC approval of the License Transfer Application (Reference 1) and the transfer of the Palisades licenses (Reference 2).
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Page 2 of 2 PNP HDI 2022-022 Pursuant to 10 CFR 50.82(a)(4), HDI is requesting the NRC to review the Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate (DCE) for Palisades Nuclear Plant (Reference 3).
There have been no changes to the PSDAR or Site-Specific DCE for Palisades Nuclear Plant since the report was submitted to the NRC on 12/23/2020 (Reference 3).
There are no regulatory commitments contained in this submittal.
If you have any questions or require further information, please contact William Noval at (856) 797-0900, x3587.
Sincerely, Jean A. Fleming Vice President, Licensing, Regulatory Affairs and PSA Holtec International, LLC cc:
NRC Regional Administrator - Region III NRC Resident Inspector, Palisades Nuclear Plant NRC NMSS Project Manager (Palisades)
State of Michigan Jean A.
Fleming Digitally signed by Jean A. Fleming Date: 2022.06.28 09:02:36 -04'00'