P.O. Box 63 LycomirC:rJlWoJ3O93 Con o to ~ t,1 9: 56 Nine Mile Point Nuclear Station November 1, 2002 NMP-97953 Mr. Hubert J. Miller Regional Administrator USNRC Region I 475 Allendale Road King of Prussia, PA 19406 Attention: Mr. John Caruso
Subject:
Nine Mile Point Nuclear Station Unit 1 Post Written Examination Activities - Amendment 1
Dear Mr. Miller:
Following conversations with Mr. John Caruso, and as recommended by Mr. Richard Conte, we submit this Amendment 1 to our original Post Written Examination Activities submittal (re:
letter NMP-97941, dated October 18, 2002).
Nine Mile Point has conducted a re-analysis of written examination question RO 052 / SRO 054.
Our original analysis proved to be inadequate; it failed to positively identify the actual flaw in the approved question. As such, we did not enable the NRC to conduct an objective review and render a legitimate decision regarding our recommended disposition for the question. The re analysis is included here for your review and consideration.
Per Mr. John Caruso's request, we are mailing a copy of this amendment to Mr. Dave Muller at NRC Headquarters, for his review as well.
We appreciate your patience in this matter and look forward to the results of your review.
If you have any questions, please call Ron Thurow, General Supervisor Operations Training, at 315-349-1182.
Sincerely, Michael T. Navin Manager Nuclear Training
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS AMENDMENT 1
SUMMARY
Per NUREG-1021, Revision 8, Sections ES-402 and ES-501, we submit the following amended NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS for your review and consideration.
We propose that the following questions be DELETED from the RO examination:
QUESTION BASES NUMBER OF AFFECTED APPLICANTS RO 015 No correct answer 4 of 4 RO's RO 052 SRO 054 No correct answer 7 of 9 RO's/SRO's RO 090 No correct answer 4 of 4 RO's We propose that the following question has TWO CORRECT ANSWERS:
QUESTION CAUSE NUMBER OF AFFECTED APPLICANTS RO 059 SRO 062 Insufficient stem conditions 7 of 9 RO's/SRO's We propose that the following question has ONLY ONE CORRECT ANSWER, BUT it is NOT the answer approvedby the NRC:
QUESTION CAUSE NUMBER OF AFFECTED APPLICANTS RO 054 Technical error 4 of 4 RO's NOTE: This amended submittal includes onl, the re-analyzed question, RO 052/SRO 054.
I
NMP1 License Class LCl -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS AMENDMENT 1 PART 1 Examination Outline Cross-reference: Level RO SRO Tier # 2 2 Group # 1 1 KIA # 223001 223001 Importance Rating 3.0 3.1 Proposed Question: RO 052, SRO 054 A loss of Instrument Air to the CAM and H 2 -0 2 Monitors has occurred.
Which one of the following describes the response of the sample stream isolation valves, and the required alternate method for monitoring the primary containment atmosphere?
RESPONSE OF SAMPLE STREAM IVs ALTERNATE MONITORING METHOD A. Fail open Channel 12 H 2 -0 2 local indication B. Fail open Channel 12 H2-0 2 Control Room indication C. Fail closed Drywell PASS sample D. Fail closed Torus PASS sample Proposed Answer: A Justification: A is correct - Per SOP-6. B is incorrect - cal gas IVs fail closed; therefore no control room indication is valid. CID are incorrect sample IVs fail open, and although SOP-6 suggests a PASS (if desired), it still requires monitoring Ch. 12 locally.
Proposed references to be provided to applicants during examination: None Technical Reference(s): N1-SOP-6 K/A: 223001 Primary K1.10, Knowledge of the physical connections and/or cause- effect Containment relationships between PRIMARY CONTAINMENT SYSTEM AND System and AUXILIARIES and the following: Plant air systems Auxiliaries 10 CFR Part 55 Content: 55.41(7) X 55.43 55.45 Question Source: Bank # X12473 Modified Bank #
New History Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis LOD: 2 2
NMP1 License Class LCl-0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS AMENDMENT 1 PART 2 JUSTIFICATION FOR CHANGE:
Analysis:
A lack of stem focus resulted in there being no correct answer to this question.
The use of the label 'sample stream isolation valves' in the stem and in the heading for the left-column portion of the choices is inappropriate. No such valves, by this name, exist in either the CAM or H2-02 Analyzer systems; nor does Table 6.1 of N1-SOP-6 allude to any valves by this name.
Additionally, an applicant could argue that any one of 3 groups of system-related valves could be interpreted as 'sample stream isolation valves.' Those 3 groups are:
- 1. The primary containment isolation valves for the CAM system, as well as System 11 of H2-O2 monitoring. These valves are cited in the 1t bullet of the EFFECT column of N1-SOP-6, Table 6.1. As the 1st bullet illustrates, these valves all fail closed on a loss of air.
- 2. The primary containment isolation valves for System 12 of H2-02 monitoring. These are DC operated valves, and so are unaffected by the loss of air; i.e., they have no response to a loss of air.
- 3. The H2-O2 inlet sample valves for System 11 and System 12 H2-02 monitoring. These valves are cited in the 3 rd bullet of the EFFECT column of Ni1-SOP-6, Table 6.1. As the Pd bullet 3
illustrates, these valves all fail open on a loss of air.
==
Conclusions:==
The question stem failed to clearly present the question to the applicants and ignored the influence of the System 12 H2-02 monitoring isolation valves (DC-operated) on the set of answer choices.
Consequently, we cannot defend any of the 4 choices as the only correct answer while defending the other 3 choices as distractors.
RECOMMENDATION:
There being no correct answer, delete question RO 052 / SRO 054 from both the RO and SRO exams.
OPERATIONS BRANCH CONCURRENCE: I ignature Date OPERATIONS TRAINING SUPERVISION: 41}// /oA_
Signature Date 3
NMP1 License Class LCl-0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS AMENDMENT 1 PART 3 SUPPORT DOCUMENTATION
- Drawing C-18014-C, sheet 2
"*Drawing C-26939-C
"*Drawing C-26949-C
- N1-SOP-6, Table 6.1 4
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN -EXAMINATION POST-EXAMINATION ANALYSIS
SUMMARY
Per NUREG-1021, Revision 8, Sections ES-402 and ES-501, we submit the following NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS for your review and consideration.
We propose that the following questions be DELETED from the RO examination:
QUESTION BASES NUMBER OF AFFECTED APPLICANTS RO 015 No correct answer 4 of 4 RO'.
RO 090 No correct answer 4 of 4 RO's We propose that the following questions have TWO CORRECTANSWERS:
QUESTION CAUSE NUMBER OF AFFECTED APPLICANTS RO 052 SRO 054 Lacks stem focus 7 of 9 RO's/SRO's RO 059 SRO 062 Insufficient stem conditions 7 of 9 RO's/SRO's We propose that the following question has ONLY ONE CORRECT ANSWER, BUT it is NOT the answer approvedby the NRC:
QUESTION CAUSE NUMBER OF AFFECTED APPLICANTS RO 054 Technical error 4 of 4 RO's Per the requirements of ES-402, Section E.5, the following pages provide the analyses, justification for change, and our recommended disposition for each of these questions.
We present each of these questions in the following format:
PART 1 - The original question as approved by the NRC and administered to the applicants PART 2 - The justification for change, including an Analysis, Conclusions, and the specific Recommendation PART 3 - A copy of the reference documentation that supports the recommended change I
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 1 Examination Outline Cross-reference: Level RO Tier # 1 Group # 1 K/A # 295001 Importance Rating 3.1 Proposed Question: RO 015 The plant is operating at 100% power, with the following:
"* A malfunction results in a lowering speed on all five running Recirculation Pumps
"* Operator action has been taken to stop the lowering flow
"* Operation remains outside the Restricted Zone on the Power to Flow Map Which one of the following describes the effect of this flow reduction on the APRM margins to rod blocks and scrams?
A. The same margins exist now as before and the margins will remain constant.
B. Lesser margins exist now than before and these margins will remain constant.
C. Lesser margins exist now than before and these margins will become even less.
D. Greater margins exist now than before but these margins will return to the original margins.
Proposed Answer: C Justification: C is correct - FCTR curves the setpoints downward to avert the scram zone and the lowering FW temperature will continue to raise power.
A/BID are incorrect - wrong direction Proposed references to be provided to applicants during examination: None Technical Reference(s): DDC1 E001 35, Five Loop Power Flow Map K/A: 295001 Partial or AA2.02, Ability to determine and/or interpret the following as they Complete Loss of apply to PARTIAL OR COMPLETE LOSS OF FORCED CORE FLOW Forced Core CIRCULATION: neutron monitoring Flow Circulation 10 CFR Part 55 Content: 55.41(7) X 55.43 55.45 Question Source: Bank #
Modified Bank #
New NEW History 2
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 2 JUSTIFICATION FOR CHANGE:
Analysis:
The question has two major flaws:
- 1. The stem conditions do not indicate how far recirc flow actually lowers, nor does it indicate the initial flow or rod line, before the operator successfully stops the flow reduction. The stem's 3 rd bullet only states that wherever the flow reduction stopped, operation remains outside the Restricted Zone. As a result, more than one answer can exist, dependent upon where "outside of the restricted zone" the applicant chose to assume.
Consider one possible scenario: Flow begins at 67.5 Mlb/hr (100% flow) and the operator stops the flow reduction at 47.25 Mlb/hr (70% flow). Referring to the Power to Flow Map...
a) Operation does indeed remain outside the Restricted Zone; however, b) During this flow reduction transient, the margins to both the APRM Scram (scram setpoint line) and the APRM Rod Block (rod block setpoint line) have become GREATER, not the
'Lesser', as alleged in the approved answer.
Consider a second possible scenario: Flow begins at 67.5 Mlb/hr (100% flow) and the flow reduction is stopped at 33.75 Mlb/hr (50% flow). Referring to the Power to Flow Map...
a) Again, operation remains outside the Restricted Zone; however, b) While the margins became GREATER at first, they became LESSER after flow reached approximately 44 Mlb/hr (approximately 66% flow).
- 2. The second flaw: the question does not include a time frame for the end point of the transient; thus it fails to consider how the Xenon build-up (a consequence of the recirc flow induced down-power transient) contributes to the overall core reactivity change.
As correctly described in the original question's 'Justification' section, regardless of where the recirc flow reduction stops, power will then slowly rise as the reduced feedwater inlet temperature contributes positive reactivity via the Negative Temperature Coefficient. This reactivity contributor affirms the approved answer's statement that "...margins will become even less." [Note: This response has been demonstrated repeatedly in the Unit 1 simulator.]
Conversely, however, if one were to continue to observe the Power to Flow Map relationship for some additional amount of time after the flow transient, power would eventually turn. That is, power would at least stop rising and even begin lowering again (if post-transient Xenon's negative reactivity is sufficient to overcompensate for the feedwater inlet temperature's positive reactivity addition).
==
Conclusions:==
None of the 4 choices correctly answers the question, in its entirety; i.e., how the margins behave during the flow reduction, and how they behave after the flow reduction.
All 3 of choices B, C, and D can correctly answer the first part of the question (i.e., the margin response during the flow reduction). This has occurred because the facility failed to identify the initial 3
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS flow (or rod line), the flow value at which the transient stopped and did not frame the question stem within a time-line.
For example, the question could have been written as:
The plant is operatingat 100% power and 100% flow, with the following:
"* A malfunction occurs resultingin a reduction in core flow
"* Operatoractions stops the flow reduction at 44 Mlbm/hr "Which one of the following describes the effect of this flow reduction on the APRM margins to rod block and scrams during the transientand for 10 minutes, thereafter?"
The correct answer would have been:
'The margins become significantly LARGER, then significantly SMALLER, during the transient,they continue to become SMALLER after the transient."
RECOMMENDATION:
On the basis of there being NO CORRECT ANSWER, delete question RO 015 from the RO examination.
OPERATIONS BRANCH CONCURRENCZ '700 18lg9nat-ure 1ate OPERATIONS TRAINING SUPERVISION: 10 127L oZ-~
Signature Date 4
NMP1 License Class LCl-0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 3 SUPPORT DOCUMENTATION
- 5-LOOP POWER-TO-FLOW MAP (DRAWING # F-45683-C, Sheet 1) 5
N
ýý,f-j
NMP1 License Class LCl-0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 1 Examination Outline Cross-reference: Level RO Tier # 3 Group #
K/A# 2.1.31 Importance Rating 4.2 Proposed Question: RO 090 The plant is operating at 100% power, with the following:
"* RPV level is 73 inches and stable
"* Then, power is reduced to 90%
"* After the power transient, RPV level is 73 inches and stable Which one of the following describes the response of the 13 FW FCV indication during the RPV level transient?
A. Deviation meter first swings right, then swings left, and stabilizes at the center.
B. Deviation meter first swings left, then swings right, and stabilizes to the left of center.
C. Demand meter first swings right, then swings left, and stabilizes at a value lower than before the transient.
D. Demand meter first swings left, then swings right, and stabilizes at a value greater than before the transient.
Proposed Answer: A Justification: A is correct - During steady state (zero level error signal), the deviation meter is kept 'balanced' at the center of the meter scale (i.e.,
@ the 'zero deviation' or red dot position on the scale). When the downpower begins, the deviation meter swings to the right, because a positive level error exists, causing the FCV to be open more than is required for the now lowering steam flow and feed flow demands. As the transient comes to an end, the deviation meters swings left, back towards the center (zero level error position) and stabilizes there. RPV water level is back to its pre-transient value. B is incorrect - See 'A' justification. Additionally,- with the 13 FCV in BAL (i.e., automatic mode), the controller deviation will return to zero (i.e., centered). CID are incorrect - 'C' is a very plausible distractor because the demand meter does indeed also move during the transient. However, with a lowering feed flow requirement during the downpower, the demand meter swings left of its pre-transient value and stablizes at some lower value (i.e.,
this lower value is a result of a demand signal to the FCV, itself, that positions the valve less open than it was before (to accommodate the lower feed flow that is now required)). The demand meter has no reason to swing back toward its pre-transient value, because, indeed, the controller stabilizes with there being a lower demand signal sent to the FCV. This same discussion (a mirror image) justifies why 'D' is incorrect.
Proposed references to be provided to applicants during examination: None Technical Reference(s): O1-OPS-001-259-1-02 K/A: Generic 2.1.31 2.1.31: Ability to locate control room switches, controls and indications and to determine that they I are correctly reflecting the desired plant lineup 10 CFR Part 55 Content: 55.41 (7) X 55.43 55.45 Question Source: Bank #
Modified Bank #
New X History Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X LOD: 2 6
NMP1 License Class LC1-0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 2 JUSTIFICATION FOR CHANGE:
Analysis:
This question is technically incorrect. None of the choices represents the actual response of the GEMAC controller indications for FCV 13 during the described level transient.
The correct answer should have been:
"Deviationmeter swings to the right and remains there."
[Note: For this analysis, the facility has proven this behavior, repeatedly, in the Unit 1 simulator.]
PART 3 of this justification shows a photo of this GEMAC controller. Presently, this controller is operating in an automatic mode, as indicated by the manual control knob being in the BAL ('Balance')
position. Observe, there are two horizontally oriented meters: the upper is the DEVIATION meter, the lower is the DEMAND meter. Notice the large dot at center of scale on the DEVIATION meter, and notice how the pointer is presently positioned at center. This condition represents a 'Zero deviation' that presently exists between two control signals: between the automatic control signal (coming into this GEMAC controller from the feedwater Master Level Controller, located on the control room E Panel) and the manual control signal that is developed within the GEMAC controller. In other words, these two signals currently have equal values (e.g., they are both 8 mA signals); we speak of them as being 'matched'. Unit 1 operators (and operating procedures) most often refer to this GEMAC controller as being 'balanced'.
PART 3 of this justification also excerpts Section F.5.0 of N1-OP-16 (Feedwater). This section describes how the operator places this GEMAC controller in MANUAL mode. The nulling effort ensures a 'bumpless transfer' between the automatic and manual modes of controlling FCV 13 position.
The stem of this question describes a 10% down-power transient from an initially 'balanced' (centered) FCV 13 controller operating in automatic (BAL position of the knob). As steam flow demand lowers so, too, does feed flow demand. The Master Level Controller (MLC) is attempting to maintain reactor water level at the setpoint that the operator has dialed in at the E Panel. To accomplish this, the MLC output signal to the FCV 13 GEMAC controller gets smaller. This signal simply passes through the GEMAC controller on its way to the FCV 13 positioner (at the valve location). However, because the GEMAC controller is not capable of automatically changing its internal 'manual' mode signal to remain 'matched' (in size) with the automatic signal coming from the MLC, the DEVIATION meter begins to swing to the right of center. This 'positive' deviation, or positive error, is a measure of the difference in signal size between the automatic signal and manual mode signal. After the flow/level transient, FCV 13 will remain in its new position (more closed than before) as determined by the smaller automatic signal size from the MLC. However, until the operator physically adjusts the GEMAC controller knob to, again, null out ('balance') the two signals, the DEVIATION meter indication will remain to the right of center.
==
Conclusions:==
We have not revisited choices C and D in our analysis. These two distractors were, and still are, incorrect, for the reasons described in the 'Justification' section of the original question However, choices A and B are also incorrect, for the reasons described in the above Analysis.
7
NMP1 License Class L-l -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS RECOMMENDATION:
On the basis of there being NO CORRECT ANSWER, delete question RO 090 from the RO examination.
OPERATIONS BRANCH CONCURRENCE: Z',,/tr OS-inature-6 ateZ OPERATIONS TRAINING SUPERVISION: /,0// /71 Signature Date 8
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 3 SUPPORT DOCUMENTATION
"*Photo of FCV 13 GEMAC controller
"*N1-OP-1 6, Section F.5.0, page 58 9
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS FCV 13 GEMAC CONTROLLER DEVIATION meter currently at center, or
'Balanced' ('nulled')
Photo taken before the level transient Select Knob (OUTER RING TYPE) - currently in the BAL position (automatic mode of controller operation)
Notice how deviation meter pointer has swung to the right Photo taken after the level transient
- 44ýSKNOBManual Adjust Knob (INNER TYPE) - used for nulling the controller 10
F. NORMAL OPERATION (Cont) 5.0 Placing FWP 13 CONTROLLER (RMC-29-158) in MANUAL NOTE: Monitor and maintain REACTOR WATER LEVEL stable while performing the following steps.
5.1 Verify MCPR >1.59 .................. ..................... ()
5.2 Verify FWP 13 VALVE CONTROL M/A station in BAL .......... ()
5.3 Null FWP 13 VALVE CONTROL by adjusting manual knob on FWP 13 VALVE CONTROL M/A Station until deviation meter reads 50% (RED DOT) ................ .................... ()
NOTE: The following step will result in REACTOR WATER LEVEL being controlled from the M/A station of FWP 13 VALVE CONTROL.
5.4 Place FWP 13 VALVE CONTROL M/A station mode switch in MANUAL ..................... ... ........................... ()
5.5 Control reactor vessel water level by one of the following means:
- Adjusting output of FWP 11 VALVE CONTROL with manual control knob .............. .................. ()
- Adjusting output of FWP 12 VALVE CONTROL with manual control knob .............. .................. ()
- Adjusting output of FWP 13 VALVE CONTROL with manual control knob .............. .................. ()
5.6 Place FEEDWATER MASTER CONTROL LBS/HR (CTRL-(E)ID66) in MANUAL .................... ..........................
Page 58 NI-OP-16 Rev 28
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 1 Examination Outline Cross-reference: Level RO SRO Tier# 2 2 Group # 1 1 K/A # 223001 223001 Importance Rating 3.0 3.1 Proposed Question: RO 052, SRO 054 A loss of Instrument Air to the CAM and H 2 -0 2 Monitors has occurred.
Which one of the following describes the response of the sample stream isolation valves, and the required alternate method for monitoring the primary containment atmosphere?
RESPONSE OF SAMPLE STREAM IVs ALTERNATE MONITORING METHOD A. Fail open Channel 12 H2 -0 2 local indication B. Fail open Channel 12 H2-0 2 Control Room indication C. Fail closed Drywell PASS sample D. Fail closed Torus PASS sample Proposed Answer: A Justification: A is correct - Per SOP-6. B is incorrect - cal gas IVs fail closed; therefore no control room indication is valid. CID are incorrect sample IVs fail open, and although SOP-6 suggests a PASS (if desired), it still requires monitoring Ch. 12 locally.
Proposed references to be provided to applicants during examination: None Technical Reference(s): N1-SOP-6 K/A: 223001 Primary K1.10, Knowledge of the physical connections and/or cause- effect Containment relationships between PRIMARY CONTAINMENT SYSTEM AND System and AUXILIARIES and the following: Plant air systems Auxiliaries 10 CFR Part 55 Content: 55.41(7) X 55.43 55.45
/
Question Source: Bank # X12473 Modified Bank #
New History Question Cognitive Level: Memory or Fundamental Knowledge X Comi rehension or Analysis LOD: 2 I1
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 2 JUSTIFICATION FOR CHANGE:
Analysis:
A lack of stem focus (including an inappropriate choice of words) allowed the applicants to choose between two answers, A and C.
The stem condition alludes to a loss of instrument air to both the CAM and H2-02 Monitors. This is consistent with Table 6.1 of NI-SOP-6, Instrument Air Failures. On page 4 of that table, it addresses the response of both.
The first bullet of the EFFECT column states that the CAM system (understood to be both channels 11 and 12) and H2-02 (channel 11 only) become inoperable. We find the valves listed for this bullet on drawing C-18014-C, sheet 2. These valves do indeed fail closed, isolating these sample streams.
Channel 12 H2-O2 operability is unaffected by the loss of air. This is because these isolation valves are DC operated (not air operated). They, too, can be found on C-1 8014-C, sheet 2.
The third bullet of the EFFECT column states that the "H2-02 inlet sample valves" fail open. The valves listed for this bullet are found on drawings C-26939-C and C-26949-C. Notice, these valves belong to both H2-02 channels 11 and 12. These are the valves located at the respective sample sinks.
The NOTE in the ACTION column of the table is misleading. It claims that "all H2-02 sample steams are open," but really means that all channel 12 H2-02 sample streams are open. The NOTE is intended to amplify the comment just above it, explaining that channel 12 is capable of being monitored locally ('all streams'; i.e., all primary containment sample paths, of channel 12).
The lead-in statement of the stem inappropriately uses the phrase..."CAM and H2-02 Monitors...".
This leads the applicant to conclude that the answer choices will consider the response of the sample stream valves for both the CAM and H2-02 Analyzer systems. This conclusion is validated for the applicant by the fact that the question stem, itself, neglects to focus on one of these systems, or the other.
Conclusions:
Given the stem construction of this question, an applicant could justify choice A as the correct answer for the following reasons:
- 1. With respect to the left-column of choice A: Channel 12 H2-02 sample stream valves at the sample sink fail open on loss of air, and the channel 12 H2-02 sample stream containment IVs remain open because they are DC-operated valves.
- 2. With respect to the right-column of choice A: Per SOP-6, Table 6.1 ACTION, channel 12 H2-02 is to be monitored locally.
Given the stem construction of this question, an applicant could justify choice C as the correct answer for the following reasons:
- 1. With respect to the left-column of choice C: All CAM system sample stream valves fail closed on a loss of air.
12
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS
- 2. With respect to the right-column of choice C: Per SOP-6, Table 6.1 ACTION, drywell PASS sampling is available.
RECOMMENDATION:
Accept two answers for question RO 052 / SRO 054. Those answers are: A and C.
OPERATIONS BRANCH CONCURRENCFa: 77 ,,
__ inat ure Xate OPERATIONS TRAINING SUPERVISION:
Signature Date 13
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 3 SUPPORT DOCUMENTATION mDrawing C-18014-C, sheet 2 mDrawing C-26939-C
"*Drawing C-26949-C
"*N1-SOP-6, Table 6.1 14
i'ABLE 6.1 (Cont)
RECOVERY FROM LOSS OF INSTRUMENT AIR SYSTEM EFFECT ACTION H2-02 Mon
- CAM and H2-02 channel 11 inoperable, Contact chemistry if PASS sample of drywell desired.
AND CAM The following isolation valves close: Monitor channel 12 H2-02 locally (TB EL 291).
201.7-02, 201.7-03, 201.7-04, 201.7-5, 201.7-09, 201.7-10, 201.7-11 NOTE: All H2-02 sample streams are open.
" Control Room H2-02 Indication Invalid, calibration gas Isolation valves 201.2-170 and 201.2-283 close
"* H2-02'Inlet sample valves 201.2-141, 201.2-142, 201.2-143, 201.2-251, 201.2-253, and 201.2-254 open.
Service ater TCV 72-146 (RBCLC s Manually control
- TCV 72-147 (TBCLC supply) fail open Manually bypass TCV 147 per N1-OP-24.
- Automatic exhaust hood spray valve close. Operate exhaust hood spray bypass MOV -7.
- Turning gear normal engagement mechanism Manually engage turning gear, when required for turbine shutdown.
Fire Protection
- Diesel Fire Pump starts. Monitor Diesel Fire Pump operation AND fuel consumption.
- Transformer T-1 (Zone WD 8131) automatic detection disabled. Valves 100-521 and NOTE: Fire Protection System effects may NOT be immediate 95-126B fail as is, PS 100-141 alarms. during a loss of air due to Installed air reservoirs.
- Transformer T-1 0 (Zone WD 8141) automatic detection disabled. Valves 100-520 and 95-1278 fail as is, PS 100-142 alarms.
Tr 95127 isS(Zone080942) auom ac llansfe Acknowledge associated Fire Panel Trouble Alarms.
. Transformer 101 S (Zone WD 8092) automatic detection disabled. Valves 100-518 and 95-125B fail as is, PS 100-143 alarms. Inform Fire department to investigate AND station appropriate
- Transformer 101N (Zone WD 8082) automatic compensary fire patrols as required.
detection disabled. Valves 100-519 and 95-124B fail as is, PS 100-144 alarms.
- Hydrogen Rack (Zone WD 8042) automatic detection disabled. Valves 100-145 and 95-123B fail as Is, PS 100-145 alarms.
Page 4 NI-SOP-6 Rev 04
NMP1 License Class LC1-0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 1 Examination Outline Cross-reference: Level RO SRO Tier # 2 2 Group # 1 1 K/A # 259002 259002 Importance Rating 3.5 3.6 Proposed Question: RO 059, SRO 062 The plant is operating at 100% power, with the following:
"* Feedwater Pumps 11 and 13 are running
"* A fuse blows in the FCV 13 control circuit (loss of control signal)
Which one of the following describes the FCV 13 valve response and the response of its position indication on the F Panel?
VALVE POSITION INDICATION A. Fails as is Fails as is B. Fails as is Fails upscale C. Fails open Fails as is D. Fails open Fails upscale Proposed Answer: A Justification: A is correct - Loss of control signal results in FCV lockup (remains in its current position); M/A station position indication does the same. BID are incorrect - Although FCV (valve itself) locks up, the position indication fails upscale when AC power is loss to the FCV 13 positioner, itself (not a control signal type of failure). C is incorrect - FCV locks up in place.
Proposed references to be provided to applicants during examination: None Technical
Reference:
(s) N1-ARP-H3-4-6 K/A: 259002 K4.13 Knowledge of REACTOR WATER LEVEL CONTROL SYSTEM REACTOR design feature(s) and/or interlocks which provide for the following:
WATER LEVEL FWRV lockup CONTROL SYSTEM 10 CFR Part 55 Content: 55.41(7,10) X 55.43 55.45 Question Source: Bank #
Modified Bank#
New NEW History Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X LO D: 2 15
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 2 JUSTIFICATION FOR CHANGE:
Analysis:
This question's stem conditions lack the precision needed to justify choice A (the approved answer) as the only correct answer.
Notice the second bullet:
The reference to a fuse blowing, that ultimately causes a..."loss of control signal", leaves the applicant with the option of deciding which fuse has blown.
PART 3 of this justification includes drawing # C-23077-C, Sheet 4. Notice the ballooned portion of this drawing. There, you will find two fuses that are the subject of this dilemma: FU-16 and FU-18.
Notice that fuse FU-16 supplies 120 VAC RPS Bus 11 power to the I / I Signal Conditioner. Notice, also, the wire arriving at Terminal 5 of the Signal Conditioner. This is the Feedwater FCV 13 "control signal" alluded to in the 2nd bullet of the stem conditions.
If the applicant decides that FU-16 has blown, then we observe two things...
- 1. The 120 VAC operating power to the Signal Conditioner has been lost, making it impossible for the "control signal" to pass through the conditioner. In other words, we have the "loss of control signal" alluded to in the stem.
Anything that interrupts the FCV 13 "control signal" causes the valve to "Fail As Is".
This VALVE status is the left-column portion of this question's answer choices, A and B.
- 2. Although the control signal is I/st, FU-16 does not interrupt 120 VAC RPS Bus 11 power to Power Supply 29-16, PWRS. Notice that FU-18 is the fuse that supplies that power.
Notice that the PWRS is the Feedwater Level Control System's (FWLC) internal power source to the Valve Position Indicator, POI-29-134 (from PWRS Terminal 7).
This position indicator is the one alluded to in the right-column portion of this question's answer choices, A and B.
Because this position indicator is still powered, it too will "Fail As Is" when the VALVE itself "Fails As Is".
Consequently, the applicants who decided that FU-1 6 is the fuse that blew chose the approved answer, A.
If the applicant decides that FU-18 has blown, then we observe two things...
- 1. As already mentioned above, FU-1 8 supplies 120 VAC RPS Bus 11 power to the PWRS which in turn powers the valve position indicator P01-29-134.
16
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 3 SUPPORT DOCUMENTATION
"*Drawing C-23077-C, sheet 4
"*ARP H3-4-6 18
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 3 of this justification includes Alarm Response Procedure H3-4-6. The NOTE in this procedure describes the failure mode for Position Indicator POI-29-134; that is, the indicator "Fails Upscale" on a loss of power.
This response affirms the right-column portion of answer choice B.
- 2. Notice that the PWRS (at Terminal 8) supplies operating power to the Shaft Pump
- 13 Control Valve POT, as well. This POT device is essentially the E/P Converter which ultimately strokes the FCV 13 valve stem (i.e, the actual valve positioner).
In other words, the effect of a blown fuse FU-1 8 is to interrupt the ability to control the position of FCV 13, again causing the VALVE to "Fail As Is".
This response affirms the left-column portion of answer choice B.
Consequently, the applicants who decided that fuse FU-18 is the fuse that blew chose distractor B as the correct answer.
==
Conclusions:==
Because the stem conditions did not specify which fuse was blown, an applicant could justify either of choice A, or B, as the correct answer.
RECOMMENDATION:
Accept two correct answers for question RO 059 / SRO 062. Those answers are: A and B.
OPERATIONS BRANCH CONCURRENC e1gnature batp OPERATIONS TRAINING SUPERVISION: b__,,_// -71 .A Signature Date 17
flA,.Ir-I rMIllrL: MO3 ANNUNCIATOR: 4-6 1 2 3 4 5 6 7 8 1
2 FEEDWATER CONTROL SYSTEM 3 TROUBLE 4
Computer Printout: Device - Setpoint:
A166 FW CNTL VLV SIG FAILURE FAIL ESE-29-162/ID83-B - 11 FWP ESE-29-163/ID83-C - 12 FWP ESE-29-164/ID83-A - 13 FWP A167 FW CNTL VLV AIR SUP FAIL ESE-29-136 - 13 FWP FAIL PS-29-31/63L - 11 FWP 75 PSIG PS-29-32/63L - 12FWP 75 PSIG PS-29-33/63L- 13FWP 75 PSIG W096 FW INST AC POWER TROUBLE YES 27A11/12, 27NX11/12 W098 HPCI SIGNAL FAILURE YES NOTE: #13 FCV Position indicator (POI-29-134) may Fail upscale LSE-ID92 due to loss of power to the positioner (POT-29-136). Actual valve position is unchanged as #13 FCV Fails as-is on loss of power.
Operator Actions:
- 1. Confirm alarm on computer printout.
- 2. IF FW Control Valve failure, THEN place FW FCV controller in Local Manual AND control RPV water level locally in accordance with N1-OP-16 Section G, Shaft Pump Shutdown.
- 3. WHEN signal/air restored to FCV, reset the lock up solenoid valves in accordance with N1-OP-16, Section H, Feedwater FCV Lockup.
- 4. IF Instrument AC Trouble, THEN determine if Normal or Alternate power was lost, WHEN restored, reset circuit on E-Console.
- 5. IF HPCI Signal Failure, THEN check alarm unit 1D92 on Cabinet 1S34 in the Auxiliary Control Room.
PossibleCauses:
- 2. Loss of RPS CH. 11 (Aux Cont Cab 1S34) Normal: RPS 11, CKT 12 Alternate: MG Set 167, CKT 19 CH. 12 (Aux Cont Cab 1S35) Normal: RPS 12, CKT 12 Alternate: MG Set 167, CKT 20
- 3. FW Master Controller output signal less than zero.
References:
Alarm
Contact:
- 1. N1-OP-16
- 2. P&ID: C-18005-C A166 1F15
- 3. Electrical: C-23077-C, Sh. 5 & 6 A167 1G15 C-1 9951-C, Sh. 3 W096 1121 C-23146-C, Sh. 7 W098 1K21
- 4. T.S. 3.1.8 61781 Page 37 N1- ARP-H3 Rev 05
NMP1 License Class LCl-0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 1 Examination Outline Cross-reference: Level RO Tier # 2 Group # 1 K/A # 223002 Importance Rating 3.6 Proposed Question: RO 054 The plant is operating at 100% power with the following:
0 Battery Board 11 is clearance tagged 0 Transferrable loads have been transferred to Battery Board 12 Then, the following occurs:
"* Loss of Powerboard 161B
"* Liquid Poison is initiated
"* RPV water level has been intentionally lowered to -41 inches Which one of the following describes the current status of the Reactor Water Cleanup System (RWCU) and Reactor Sample Return IVs (63-04 and 63-05)?
RWCU REACTOR SAMPLE RETURNS A. Isolated Closed B. Isolated Open C. Not isolated Closed D. Not isolated Open Proposed Answer: B Justification: B is correct - Although loss of PB 161 B prevents closure of RWCU Inboard IV (33-02R), the Outboard IV is a DC valve powered from Battery Board 12. The RWCU Return IV (33-01R) still has power from PB 171B. When Liquid Poison is initiated, RWCU will successfully isolate. The Reactor Sample Return Ivs are DC valves powered from Battery Board 11 and are not transferrable loads.
When an RPV Lo-Lo level occurs (+5 inches) for the failure to scram actions (lowering level), these valves willnot auto-close. AICID are incorrect - for the reasons described above.
Proposed references to be provided to applicants during examination: None Technical Reference(s): N1-SOP-17, N1-OP-47A, O1-OPS-001-204-1-01 K/A: 223002 Primary A4.01, Ability to manually operate and/or monitor in the control room: Valve closures.
Containment Isolation/Nuclear Steam Supply Shutoff 10 CFR Part 55 Content: 55.41(7) X 55.43 55.45 Question Source: Bank #
Modified Bank #
New X History Question Cognitive Level: Memo or Fundamental Knowledge Cornprehension or Analysis X LOD: 3 Comments: None 19
NMP1 License Class LC1 -0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 2 JUSTIFICATION FOR CHANGE:
Analysis:
The question is flawed in that the correct answer and justification stated in the key, incorrectly identifies choice B as the correct answer. Specifically, for the right-column portion of the answer choices regarding the status of the Reactor Sample Return Isolation Valves 63-04 and 63-05, the resulting position is identified as "Open".
Each air-operated valve (63-04 and 63-05) is equipped with two DC solenoids per valve (reference drawing C-1 8009-C, sheet 1 coordinates G-1). One solenoid is powered from Battery Board (BB) 11 and the second solenoid is powered from BB 12 (reference drawing C-19859-C, sheet 11 A coordinates B-2 and B-4). Energizing either solenoid allows air to be supplied to the actuator and the valve to be open. Drawing C-1 9859-C, sheet 11 A identifies that the solenoids are "energized to open". De-energizing both solenoids will block and vent air from the actuator, closing the sample return isolation valve.
From the conditions stated in the question stem, BB 11 is de-energized resulting in one of the two solenoids being positioned to block and vent. Air is still supplied to the valve actuator through the 2 nd solenoid energized from BB 12. When RPV water level is lowered below 5 inches to -41 inches, as stated in the question stem, Vessel Isolation Channel 12 Logic will actuate to de-energize the remaining solenoid. Air will be vented from the actuator resulting in 63-04 and 63-05 valve closure.
Conclusion:
Based on the above description of valve operation, the correct answer is choice A, not choice B.
Recommendation:
Change answer key to reflect choice A as the only correct answer.
OPERATIONS BRANCH CONCURRENC igon a.ttu.rre _
I.te ,
OPERATIONS TRAINING SUPERVISION: ____ __ _,_ _/_ _- 7,---,
Signature Date 20
NMP1 License Class LOl -0101 NMP1 License Class L-C1-0101 NRC INITIAL WRITTEN EXAMINATION POST-EXAMINATION ANALYSIS PART 3 SUPPORT DOCUMENTATION
"*Drawing C-1 8009-C, Sheet 1
"*Drawing C-1 9859-C, Sheets 10 and 11 A 21