Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-14-1219, Pilot 10 CFR 50.69 License Amendment Request Response to Request for Additional Information Regarding the No Significant Hazards Consideration Determination + (Pilot 10 CFR 50.69 License Amendment Request Response to Request for Additional Information Regarding the No Significant Hazards Consideration Determination)
- NL-14-0580, Pilot 10 CFR 50.69 License Amendment Request - Response to Request for Additional Information + (Pilot 10 CFR 50.69 License Amendment Request - Response to Request for Additional Information)
- NL-13-1937, Pilot 10 CFR 50.69 License Amendment Request, Response to Request for Additional Information + (Pilot 10 CFR 50.69 License Amendment Request, Response to Request for Additional Information)
- NL-13-0997, Pilot 10 CFR 50.69 License Amendment Request, Response to Request for Additional Information + (Pilot 10 CFR 50.69 License Amendment Request, Response to Request for Additional Information)
- NL-12-0932, Pilot 10 CFR 50.69 License Amendment Request + (Pilot 10 CFR 50.69 License Amendment Request)
- ML040280316 + (Pilot Application for Implementation of Regulatory Guide (RG) 1.200 and Request for Fee Waiver)
- ML043210426 + (Pilot Application for Implementation of Regulatory Guide (RG) 1.200 - Revised Schedule)
- 05000237/LER-1982-010-03, Pilot Cell Voltage Readings Not Taken for 24/48,125 or 250-volt Dc Batteries Per Tech Specs.Caused by Broken Fluke Voltmeter.Event to Be Reviewed W/Shift Supervisors + (Pilot Cell Voltage Readings Not Taken for 24/48,125 or 250-volt Dc Batteries Per Tech Specs.Caused by Broken Fluke Voltmeter.Event to Be Reviewed W/Shift Supervisors)
- 05000361/LER-1983-048-03, Pilot Flames of Trains a & B Toxic Gas Isolation Sys Butane/Propane Monitors Experienced Persistent flame-out After Replacement of Hydrogen Cylinder + (Pilot Flames of Trains a & B Toxic Gas Isolation Sys Butane/Propane Monitors Experienced Persistent flame-out After Replacement of Hydrogen Cylinder)
- 05000361/LER-1983-076-03, Pilot Flames of Trains a & B of Toxic Gas Isolation Sys Butane/Propane Monitors Found Extinguished.Cause of Pilot Flameout Unknown.Failure of Sys Caused by Low Alarm Setpoint.Pilot Flames Restored + (Pilot Flames of Trains a & B of Toxic Gas Isolation Sys Butane/Propane Monitors Found Extinguished.Cause of Pilot Flameout Unknown.Failure of Sys Caused by Low Alarm Setpoint.Pilot Flames Restored)
- ML25062A275 + (Pilot Program Evaluation Panel, Comprehensive Representative Membership List as of November 13, 2000)
- ML20195H631 + (Pilot Program Guidelines)
- ML20085J728 + (Pilot Program to Assess Proposed Basic Quality Assurance Requirements in the Medical Use of Byproduct Material)
- ML20212J838 + (Pilot Program:Nrc Severe Reactor Accident Incident Response Training Manual.Public Protective Actions - Predetermined Criteria and Initial Actions)
- ML20212J607 + (Pilot Program:Nrc Severe Reactor Accident Incident Response Training Manual.U.S. Nuclear Regulatory Commission Response)
- ML20212J775 + (Pilot Program:Nrc Severe Reactor Accident Incident Response Training Manual.Severe Reactor Accident Overview)
- ML20212J665 + (Pilot Program:Nrc Severe Reactor Accident Incident Response Training Manual.Response of Licensee and State and Local Officials)
- ML20212J632 + (Pilot Program:Nrc Severe Reactor Accident Incident Response Training Manual.Overview and Summary of Major Points)
- ML20091H103 + (Pilot Project 2 Final Report)
- ML20091H104 + (Pilot Project 3 Final Report)
- ML20091H106 + (Pilot Project 4 Final Report)
- ML20091H109 + (Pilot Project 5 Final Report)
- NOC-AE-13002954, Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 + (Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191)
- ML13043A013 + (Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191)
- ML21160A146 + (Pilot Test Frac Tank Management and Testing Summary)
- ML20046C154 + (Pilot-Scale Fire-Endurance Tests of Subliming Fire-Barrier Panels)
- ML20265D500 + (Pin)
- ML20265D505 + (Pin)
- ML20260D943 + (Pin Holder Assembly. Sheet 1 of 1)
- ENS 44038 + (Pin Hole Leak Discovered in 1 Inch Instrument Line During Rpv Pressure Test)
- ENS 48943 + (Pin Holes Leaks Identified in High Pressure Core Spray System)
- 05000346/FIN-2017003-01 + (Pinched Wiring Causing the Failure of Fuses Y210 and Y214)
- ML17334A955 + (Ping/Sping Particulate,Iodine & Noble Gas Monitor Detector Sys Tech Spec)
- ML20035E523 + (Pingp,Unit 1 Refueling Outage 15 ISI Summary Rept,921024 to 930112,ISI Interval 2,Period 3)
- ML20035E524 + (Pingp,Unit 2 ISI Summary Rept,921023 to 930111,ISI Interval 2,Period 3)
- ML25349A119 + (Pings 2025 Ile Form 2.1-1 Examination Prep Checklist)
- ML25349A102 + (Pings 2025 Ile Form 2.3-1 Examination Outline Quality Checklist)
- ML25349A128 + (Pings 2025 Ile Form 2.3-2 Operating Test Quality Checklist (BC Signed))
- ML25349A129 + (Pings 2025 Ile Form 2.3-4 Written Exam Quality Checklist (BC Signed))
- ML25349A101 + (Pings 2025 Ile Form 3.4-1 Events and Evolutions Checklist - Final)
- ML25349A100 + (Pings 2025 Ile Outline Submittal Letter)
- ML25349A126 + (Pings 2025 Ile Proposed Exam Submittal Letter)
- ML20112D683 + (Pings Unit 1 ISI Summary Rept for First Period of Third Interval)
- 05000316/LER-1982-016-03, Pinhole Leak Discovered on Suction Strainer for West Containment Spray (CTS) Pump. Caused by Fatigue.Pinhole Removed by Grinding & Rewelding + (Pinhole Leak Discovered on Suction Strainer for West Containment Spray (CTS) Pump. Caused by Fatigue.Pinhole Removed by Grinding & Rewelding)
- 05000249/LER-1981-021-03, Pinhole Leak Found on Reactor Water Cleanup Line from Regenerative Heat Exchanger. Caused by Sensitization During Initial Welding.Other Internal Cracks Discovered.Heat Exchanger Loop Replaced + (Pinhole Leak Found on Reactor Water Cleanup Line from Regenerative Heat Exchanger. Caused by Sensitization During Initial Welding.Other Internal Cracks Discovered.Heat Exchanger Loop Replaced)
- ENS 41487 + (Pinhole Leak in Instrument Drain Line Off Main Steam System)
- ML20062K507 + (Pinnacle West Capital Corp 1992 Annual Rept)
- ML041330419 + (Pinnacle West Capital Corporation - 2003 Annual Report)
- ML20265E475 + (Pinned Buttress Connection Between Shieldwall & Tornado WALL- SW101 102 103 104, as-built)
- ML23186A031 + (Pioneer Engineering & Environmental Services, LLC, NRC Forms 591M and 592M, IR 2023001)
- ML20309A940 + (Pioneer Technical Services, Inc. 25-27524-01, Notice of License Expiration)
- ML22348A126 + (Pionic M&S Tlr (PNNL-33733))