ML25349A100
| ML25349A100 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 06/11/2025 |
| From: | NRC/RGN-III |
| To: | Xcel Energy |
| Gregory Roach | |
| Shared Package | |
| ML23202A208 | List: |
| References | |
| L-Pl-25-029 | |
| Download: ML25349A100 (0) | |
Text
ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATION IS COMPLETE fl Xcel Energy June 11, 2025 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 2056 Westings Avenue, Suite 400 Naperville, IL 60563-2657 Prairie Island Nuclear Generating Plant Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License DPR-42 and DPR-60 1717 Wakonade Drive Welch, MN 55089 L-Pl-25-029 NUREG 1021 Prairie Island Nuclear Generating Plant (PINGP) Initial Operator Licensing Examination Outlines Reference 1: Nuclear Regulatory Commission (NRC) letter to Mr. Thomas A. Conboy, "Prairie Island Nuclear Generating Plant Units 1 and 2 Confirmation of Initial License Examination,"
dated March 12, 2025, Accession Number ML25071A033 In response to Reference 1, Northern States Power Company, a Minnesota Corporation, d/b/a Xcel Energy (hereafter "NSPM"), submits the integrated examination outlines for the initial operator licensing examinations to be administered at Pl NGP the weeks of November 10 and 17, 2025.
This information is provided in accordance with guideline ES-2.1 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 12.
NUREG-1021 physical security requirements state that the enclosed examination materials shall be withheld from public disclosure until after the examination is complete.
If there are any questions, please contact Mr. Justin Hasner at (651) 267-7513 or justin.h.hasner@xcelenergy.com.
Summary of Commitments l
etter contains no
=
commitments and no revisions to existing commitments.
Brya urrier Plant Manager, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc:
Bryan Bergeon, USNRC Region Ill, with enclosure Paul Zurawski, USNRC Region Ill, without enclosure
Regional Administrator, Region III Page 2 of 2 ENCLOSURE 1 PRAIRIE ISLAND NULCEAR GENERATING PLANT INITIAL OPERATOR LICENSING EXAMINATION OUTLINE Form Number Title or Description Number of Pages QF-1071-01 & 02 (ES 1.3-1 equivalent)
Exam Security Agreements 4
ES 2.3-1 Examination Outline Quality Checklist 1
ES 2.3-2 Operating Test Quality Checklist 2
ES 3.2-1 Administrative Topics Outline - Reactor Operator (RO) 2 ES 3.2-1 Administrative Topics Outline - Senior Reactor Operator (SRO-I and -U) 2 ES 3.2-2 Control Room/In-Plant Systems Outline - RO 4
ES 3.2-2 Control Room/In-Plant Systems Outline - SRO-I 4
ES 3.2-2 Control Room/In-Plant Systems Outline - SRO-U 4
ES 3.3-1 Scenario Outline 21 ES 3.4-1 Events and Evolutions Checklist 4
N/A Draft operating test administration schedule (ES 2.1.B.18) 2 ES 4.1 PWR Pressurized-Water Reactor Examination Outline 13