Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-III-06-004, Tritium Leakage + (PNO-III-06-004, Tritium Leakage)
- PNO-III-06-004A, Tritium Leakage (Update) + (PNO-III-06-004A Tritium Leakage (Update))
- PNO-III-06-005, LaSalle Indication Failure for 3 Control Rods Following Reactor Trip + (PNO-III-06-005: LaSalle Indication Failure for 3 Control Rods Following Reactor Trip)
- PNO-III-06-005A, LaSalle Indication Failure for Three Control Rods Following Reactor Trip (Update) + (PNO-III-06-005A, LaSalle Indication Failure for Three Control Rods Following Reactor Trip (Update))
- PNO-III-06-006, Byron: Unusual Event Declared Due to a Fire within the Plant Protected Area + (PNO-III-06-006, Byron: Unusual Event Declared Due to a Fire within the Plant Protected Area)
- PNO-III-06-007, Braidwood 1 and 2 - Tritium Contamination Issues + (PNO-III-06-007: Braidwood 1 and 2 - Tritium Contamination Issues)
- PNO-III-06-009, Perry Nuclear Power Plant Low Level Tritium Identified in Underdrain System + (PNO-III-06-009 - Perry Nuclear Power Plant Low Level Tritium Identified in Underdrain System)
- PNO-III-06-010, Exelon Generation Co - Cracking Identified in Unit 2 Steam Dryer + (PNO-III-06-010, Exelon Generation Co - Cracking Identified in Unit 2 Steam Dryer)
- PNO-III-06-011, Braidwood: Tritiated Steam Released to the Environment + (PNO-III-06-011, Braidwood: Tritiated Steam Released to the Environment)
- PNO-III-06-012, Kewaunee, Manual Reactor Shutdown Following Feedwater Pump Trip + (PNO-III-06-012: Kewaunee, Manual Reactor Shutdown Following Feedwater Pump Trip)
- PNO-III-06-013, Palisades Shutdown to Investigate Control Rod Withdrawal Problem + (PNO-III-06-013: Palisades Shutdown to Investigate Control Rod Withdrawal Problem)
- PNO-III-06-014, Kewaunee, Procedure Adherence Problems During Reactor Startup + (PNO-III-06-014, Kewaunee, Procedure Adherence Problems During Reactor Startup)
- PNO-III-06-015, Braidwood Tritium Contamination Issues (Update) + (PNO-III-06-015: Braidwood Tritium Contamination Issues (Update))
- PNO-III-06-016, Perry Nuclear Power Plant Unusual Event Declared Due to Earth Quake + (PNO-III-06-016 Perry Nuclear Power Plant Unusual Event Declared Due to Earth Quake)
- PNO-III-06-017, D. C. Cook Unit 1 Shuts Down Due to High Containment Air Temperature + (PNO-III-06-017: D. C. Cook Unit 1 Shuts Down Due to High Containment Air Temperature)
- PNO-III-06-018, Fermi 2 Reactor Shutdown and Unusual Event + (PNO-III-06-018: Fermi 2 Reactor Shutdown and Unusual Event)
- PNO-III-06-019, Kewaunee: Tritium Detected in Groundwater Beneath Plant Buildings + (PNO-III-06-019 Kewaunee: Tritium Detected in Groundwater Beneath Plant Buildings)
- PNO-III-06-020, Braidwood, NRCs Review of Exelons Plans for Resuming Radioactive Discharges Through the Braidwood Blowdown Line + (PNO-III-06-020: Braidwood, NRCs Review of Exelons Plans for Resuming Radioactive Discharges Through the Braidwood Blowdown Line)
- PNO-III-06-022, Kewaunee Reactor Shutdown and Startup + (PNO-III-06-022: Kewaunee Reactor Shutdown and Startup)
- ML19290C710 + (PNO-III-065:on 791217,const Electrician Working on Bldg Fell 20 Ft from Scaffolding & Was Pronounced Dead on Arrival at Local Hosp.Cause of Fall Not Given)
- PNO-III-07-001, Monticello Reactor Shutdown Due to Turbine Control Valve Failure (Event Notification EN 43088) + (PNO-III-07-001: Monticello Reactor Shutdown Due to Turbine Control Valve Failure (Event Notification EN 43088))
- PNO-III-07-003, Palisades - Palisades Shutdown to Replace Heat-Damaged Cables + (PNO-III-07-003: Palisades - Palisades Shutdown to Replace Heat-Damaged Cables)
- PNO-III-07-004, Kewaunee Reactor Shutdown + (PNO-III-07-004: Kewaunee Reactor Shutdown)
- PNO-III-07-005, Prairie Island Non-Credible Bomb Threat + (PNO-III-07-005 - Prairie Island Non-Credible Bomb Threat)
- PNO-III-07-006, Palisades Shutdown Due to Low Steam Generator Level + (PNO-III-07-006: Palisades Shutdown Due to Low Steam Generator Level)
- PNO-III-07-007, Point Beach - Unit 1 Manual Reactor Trip + (PNO-III-07-007 - Point Beach - Unit 1 Manual Reactor Trip)
- PNO-III-07-008, Point Beach Unit 1 Reactor Shutdown + (PNO-III-07-008: Point Beach Unit 1 Reactor Shutdown)
- PNO-III-07-009, A: Perry: Update to Unexpected Reactor Shutdown Exceeding 72 Hours Due to Problem with Reactor Recirculation Pump Motor + (PNO-III-07-009-A: Perry: Update to Unexpected Reactor Shutdown Exceeding 72 Hours Due to Problem with Reactor Recirculation Pump Motor)
- ML071860607 + (PNO-III-07-009: Perry: Unexpected Reactor Shut Down Exceeding 72 Hours Due to Problem with Reactor Recirculation Pump Motor)
- PNO-III-07-010, Unusual Event Declared at Fermi Due to Unexpected Piping Hole and Indentations + (PNO-III-07-010 - Unusual Event Declared at Fermi Due to Unexpected Piping Hole and Indentations)
- PNO-III-07-012, Both Units at Byron Shut Down Due to a Lead in Pipe + (PNO-III-07-012 - Both Units at Byron Shut Down Due to a Lead in Pipe)
- PNO-III-07-014, Byron Unit 1, Nitrogen Leak During Maintenance + (PNO-III-07-014: Byron Unit 1, Nitrogen Leak During Maintenance)
- PNO-III-07-015, Scram at Perry Nuclear Power Station and Feedwater Loss + (PNO-III-07-015: Scram at Perry Nuclear Power Station and Feedwater Loss)
- PNO-III-07-016, Prairie Island, Unplanned Unit 1 Shutdown Greater than 72 Hours + (PNO-III-07-016: Prairie Island, Unplanned Unit 1 Shutdown Greater than 72 Hours)
- PNO-III-08-001A, Point Beach - Unit 1 Notification of Unusual Event Due to Loss of Offsite Power to Vital Busses, Rev. 1 + (PNO-III-08-001A - Point Beach - Unit 1 Notification of Unusual Event Due to Loss of Offsite Power to Vital Busses, Rev. 1)
- PNO-III-08-002, Byron Unit 2 Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses + (PNO-III-08-002: Byron Unit 2 Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses)
- PNO-III-08-003, Point Beach 1 & 2, Possible Security Threat + (PNO-III-08-003: Point Beach 1 & 2, Possible Security Threat)
- PNO-III-08-004, Cook & Palisades, Unusual Events Declared Due to Earthquake + (PNO-III-08-004: Cook & Palisades, Unusual Events Declared Due to Earthquake)
- PNO-III-08-005, Fermi 2, Partial Loss of Annunciators in Control Room, Monitoring Mode + (PNO-III-08-005, Fermi 2, Partial Loss of Annunciators in Control Room, Monitoring Mode)
- PNO-III-08-006, Duane Arnold, Status of Duane Arnold Notice of Unusual Event + (PNO-III-08-006, Duane Arnold, Status of Duane Arnold Notice of Unusual Event)
- PNO-III-08-007, Prairie Island Unit 1, Unplanned Unit 1 Shutdown Greater than 72 Hours/Special Inspection + (PNO-III-08-007, Prairie Island Unit 1, Unplanned Unit 1 Shutdown Greater than 72 Hours/Special Inspection)
- PNO-III-08-008, Palisades Forced Shutdown to Replace Leaking Control Rod Drive Seals + (PNO-III-08-008 - Palisades Forced Shutdown to Replace Leaking Control Rod Drive Seals)
- PNO-III-08-009, Monticello, Unplanned Shutdown Greater than 72 Hours + (PNO-III-08-009, Monticello, Unplanned Shutdown Greater than 72 Hours)
- ML080160221 + (PNO-III-08-00: Point Beach, Unit 1, Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses)
- PNO-III-08-010, Monticello - Loss of Offsite Power + (PNO-III-08-010: Monticello - Loss of Offsite Power)
- PNO-III-08-011, D. C. Cook - Unit 1 Manual Trip Due to Main Turbine Generator Fire and Significant Fire Suppression System Degradation + (PNO-III-08-011: D. C. Cook - Unit 1 Manual Trip Due to Main Turbine Generator Fire and Significant Fire Suppression System Degradation)
- ML072890262 + (PNO-III-08-011:Exelon Nuclear Generating Co, Tritium Leakage)
- PNO-III-08-012, Quad Cities Notice of Unusual Event Due to Onsite Explosion + (PNO-III-08-012 - Quad Cities Notice of Unusual Event Due to Onsite Explosion)
- PNO-III-08-013, Quad Cities, Unit 2 Shutdown Due to a Steam Piping Bellows Failure Inside of the Main Condenser + (PNO-III-08-013, Quad Cities, Unit 2 Shutdown Due to a Steam Piping Bellows Failure Inside of the Main Condenser)
- PNO-III-09-001, Palisades Forced Shutdown for Greater than 72 Hours to Replace Leaking Control Rod Drive Seals + (PNO-III-09-001, Palisades Forced Shutdown for Greater than 72 Hours to Replace Leaking Control Rod Drive Seals)
- PNO-III-09-002, Kewaunee Unplanned Shutdown Due to Main Steam Pressure Instruments Not Calibrated as Required + (PNO-III-09-002 - Kewaunee Unplanned Shutdown Due to Main Steam Pressure Instruments Not Calibrated as Required)