Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Outline,Tmi Requirements Implementation". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML030780097  + (Outline Submittal with NRC Comments for the Perry Examination - Jan/Feb 2003)
  • ML023460236  + (Outline Submittal with NRC Comments for the Kewaunee Initial Examination - August / September 2002)
  • ML22335A437  + (Outline and Op Test Checklists: 2.3-1; 2.3-2)
  • ML16217A286  + (Outline and Operating Test Comments Final)
  • ML052240151  + (Outline for NRC-Proposed Palisades Initial Examination - May 2005)
  • ML022400332  + (Outline for Phone Calls with Licensees for: Davis-Besse, H.B. Robinson, North Anna Unit 2 and Surry Unit 2)
  • ML19220C948  + (Outline for SER)
  • ML023030539  + (Outline for the Prairie Island Initial Examination - August 2002)
  • ML19322D617  + (Outline of 880-881 Sys Maint Training Program)
  • ML19289F185  + (Outline of Areas of cross-examination,submitted Per 790329 Pretrial Order.Certificate of Svc Encl)
  • ML19246A835  + (Outline of Comments Received on NRDC Petition for Rulemaking PRM-20-7 Re Low Level Wastes.Overall Response Was Opposed to Petition)
  • ML19269D415  + (Outline of Intended cross-examination by Util,Contingent Upon Denial of Util 790423 Objections to Intervenors Profferred Testimony.Certificate of Svc Encl)
  • ML19029A856  + (Outline of Intervenors, Colemans, Cross-Examination; Contentions Two and Six)
  • ML20085A671  + (Outline of Mixed Flow Test - Rc Pumps. Rept Will Prove Capability of Pumps to Operate within Emergency Limits Under Mixed Flow Conditions)
  • ML19338F185  + (Outline of NRC Testimony in Response to Ucs Contentions 6,9, 12 & 14,Sholly Contention 13 & Environ Coalition on Nuclear Power Contentions 1(a),1(c),1(d) & Remainder.Certificate of Svc Encl)
  • ML031110315  + (Outline of RES Activities to Be Undertaken in Support of NRR Significance Determination Process Davis Besse Head Wastage Issue)
  • ML20266E265  + (Outline of SU1023 - 8X5 Unit Rh Assy CW Rot with Oil Pump Case 2 in Wider than Std)
  • ML18230A020  + (Outline of Testimony of Carlos G. Bell)
  • ML19270H424  + (Outline of Util cross-examination of R Webb & Gulbransen Testimony on Behalf of Intervenor Lower Alloways Creek Township.Matl Will Be Used to Extent 790630 Objections to Testimony Are Overruled.Certificate of Svc Encl)
  • ML19338F451  + (Outline of Valve/Impact Statement for Advance Notice of Proposed Rulemaking Re Consideration of Degraded or Melted Cores in Safety Regulation.Advance Notice Will Be Prepared)
  • ML20125A626  + (Outline of cross-examination Submitted by Util to Be Used to Extent That Util 790630 Objections to Intervenor Lower Alloways Creed Township Testimony Are Not Sustained. Certificate of Svc Encl)
  • ML20082H528  + (Outline of cross-examination for Contentions V-3a,V-3b & V-4.Motions Pending to Strike Friends of the Earth & Rl Anthony Prefiled Testimony.W/O Encls.Certificate of Svc Encl)
  • ML18079A828  + (Outline of cross-examination of Intervenors Coleman. Questions Relate to Initial Events for TMI Incident, Operation of Reactor Containment Sys During Loss of Feedwater Transient & Operation of Auxiliary Bldg)
  • ML17272B060  + (Outline of cross-examination of Intervenor Township of Lower Alloways Creek Witnesses Webb & Gulbransen Re ASLB 790514 Order.Certificate of Svc Encl)
  • ML11178A067  + (Outline, Turkey Point Nuclear Plant, Units 3 and 4, Outline Epitome/Containment Volume RAI Response)
  • B49739, Outline.Sheet 1  + (Outline.Sheet 1)
  • ML20265A627  + (Outline/Assembly for Fuel Pool Cooling Heat Exch)
  • ML060330078  + (Outline: Basis for 20. 2002 Alternative Disposal Procedure for Us Ecology Idaho Site, W/Handwritten Notes)
  • ML20263J910  + (Outline:Neutron/Process Rad Div 4)
  • ML20263J907  + (Outline:Neutron/Process Rad Div 4. Sheet 1.Revision Date Illegible)
  • ML20263J913  + (Outline:Neutron/Process Rad Div 4. Sheet 3)
  • ML20263J961  + (Outline:Position Multiplexer Cabinet. Sheet 2)
  • ML20263J917  + (Outline:Principal Plant Control Console. Revision Date Illegible)
  • ML20263B397  + (Outline:Unit Control Board 2UBI & 2UB2)
  • ML20263B438  + (Outline:Unit Control Board 3UB2)
  • ML20263B328  + (Outline:Unit Control Board IUB1 & IUB2)
  • ML20263C118  + (Outlines & Sections Diesel Generator Local Panel)
  • ML19312C891  + (Outlines 730615 Telcon W/Util Re Commitments Made by Util During OL Review for Pipe & Component Vibration Test Repts, Seismic Data Use & Steam Generator Subcompartment Structural Capability Analysis)
  • ML19312C897  + (Outlines 730617 Telcon W/F Jape Re Util Request for Exception to Order of Performance of Full & Half Pressure Containment Leak Tests.Significant Time Period Required Between Tests.Fuel Loading Date Now 730813)
  • ML19312C892  + (Outlines 730618 Telcon W/Util Re Containment Structural & Leak Testing.Half Pressure Test Not to Be Approved Before 730624)
  • ML20024C563  + (Outlines 780305-07 B&W Util Nuclear Operating Experience Seminar Program in Hershey,Pa)
  • ML19318A179  + (Outlines 800516 Insp of Geologic Faulting in Unit 1 Spray Pond.Util May Proceed W/Fill Concrete Operations on Zone 20 & Fault 19.Addl Faulting Must Be Reported)
  • ML19338C554  + (Outlines 800729-31 Site Visit & Meeting to Become Familiarized W/Plant & Represent NRC in Annual Performance Evaluation.Evaluation & Meeting Summary Will Be Distributed)
  • ML20127M101  + (Outlines Accelerated Schedule on Containment Margin Program. Schedule Moves Completion Date of Separable Component Development & Testing from FY86 to Early FY85)
  • ML20148L251  + (Outlines Acceptance Criteria for Facility Licensing Process)
  • ML19290C401  + (Outlines Action Items from 791212 Meeting W/Sandia Labs)
  • ML19296C921  + (Outlines Action Items to Be Implemented Re QA Program Per 791228 Meeting.Includes 800104 Seminar W/Const & QC Personnel,Procedure Changes,Written Policy Re Problem Solutions & Overall Mgt Assessment of QC & QA Personnel)
  • ML19220C939  + (Outlines Action Plan for Developing Regulatory Options on Sister B&W Operating Reactors)
  • PY-CEI-NRR-1819, Outlines Actions Being Taken to Assure That Plant Design Mod Installed During Fourth Refueling Outage (RF04) Acceptable, to Address NRC Concerns Presented at NRC Insp on 940509-0610 Exit Meeting  + (Outlines Actions Being Taken to Assure That Plant Design Mod Installed During Fourth Refueling Outage (RF04) Acceptable, to Address NRC Concerns Presented at NRC Insp on 940509-0610 Exit Meeting)
  • W3P82-2712, Outlines Actions Taken to Comply w/10CFR73.21 & NUREG-0794. QA Audit Plan Will Commence on 820830.Full Compliance Expected by 820908  + (Outlines Actions Taken to Comply w/10CFR73.21 & NUREG-0794. QA Audit Plan Will Commence on 820830.Full Compliance Expected by 820908)