Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML030780097 + (Outline Submittal with NRC Comments for the Perry Examination - Jan/Feb 2003)
- ML023460236 + (Outline Submittal with NRC Comments for the Kewaunee Initial Examination - August / September 2002)
- ML22335A437 + (Outline and Op Test Checklists: 2.3-1; 2.3-2)
- ML16217A286 + (Outline and Operating Test Comments Final)
- ML052240151 + (Outline for NRC-Proposed Palisades Initial Examination - May 2005)
- ML022400332 + (Outline for Phone Calls with Licensees for: Davis-Besse, H.B. Robinson, North Anna Unit 2 and Surry Unit 2)
- ML19220C948 + (Outline for SER)
- ML023030539 + (Outline for the Prairie Island Initial Examination - August 2002)
- ML19322D617 + (Outline of 880-881 Sys Maint Training Program)
- ML19289F185 + (Outline of Areas of cross-examination,submitted Per 790329 Pretrial Order.Certificate of Svc Encl)
- ML19246A835 + (Outline of Comments Received on NRDC Petition for Rulemaking PRM-20-7 Re Low Level Wastes.Overall Response Was Opposed to Petition)
- ML19269D415 + (Outline of Intended cross-examination by Util,Contingent Upon Denial of Util 790423 Objections to Intervenors Profferred Testimony.Certificate of Svc Encl)
- ML19029A856 + (Outline of Intervenors, Colemans, Cross-Examination; Contentions Two and Six)
- ML20085A671 + (Outline of Mixed Flow Test - Rc Pumps. Rept Will Prove Capability of Pumps to Operate within Emergency Limits Under Mixed Flow Conditions)
- ML19338F185 + (Outline of NRC Testimony in Response to Ucs Contentions 6,9, 12 & 14,Sholly Contention 13 & Environ Coalition on Nuclear Power Contentions 1(a),1(c),1(d) & Remainder.Certificate of Svc Encl)
- ML031110315 + (Outline of RES Activities to Be Undertaken in Support of NRR Significance Determination Process Davis Besse Head Wastage Issue)
- ML20266E265 + (Outline of SU1023 - 8X5 Unit Rh Assy CW Rot with Oil Pump Case 2 in Wider than Std)
- ML18230A020 + (Outline of Testimony of Carlos G. Bell)
- ML19270H424 + (Outline of Util cross-examination of R Webb & Gulbransen Testimony on Behalf of Intervenor Lower Alloways Creek Township.Matl Will Be Used to Extent 790630 Objections to Testimony Are Overruled.Certificate of Svc Encl)
- ML19338F451 + (Outline of Valve/Impact Statement for Advance Notice of Proposed Rulemaking Re Consideration of Degraded or Melted Cores in Safety Regulation.Advance Notice Will Be Prepared)
- ML20125A626 + (Outline of cross-examination Submitted by Util to Be Used to Extent That Util 790630 Objections to Intervenor Lower Alloways Creed Township Testimony Are Not Sustained. Certificate of Svc Encl)
- ML20082H528 + (Outline of cross-examination for Contentions V-3a,V-3b & V-4.Motions Pending to Strike Friends of the Earth & Rl Anthony Prefiled Testimony.W/O Encls.Certificate of Svc Encl)
- ML18079A828 + (Outline of cross-examination of Intervenors Coleman. Questions Relate to Initial Events for TMI Incident, Operation of Reactor Containment Sys During Loss of Feedwater Transient & Operation of Auxiliary Bldg)
- ML17272B060 + (Outline of cross-examination of Intervenor Township of Lower Alloways Creek Witnesses Webb & Gulbransen Re ASLB 790514 Order.Certificate of Svc Encl)
- ML11178A067 + (Outline, Turkey Point Nuclear Plant, Units 3 and 4, Outline Epitome/Containment Volume RAI Response)
- ML20033C521 + (Outline,Tmi Requirements Implementation)
- B49739, Outline.Sheet 1 + (Outline.Sheet 1)
- ML20265A627 + (Outline/Assembly for Fuel Pool Cooling Heat Exch)
- ML060330078 + (Outline: Basis for 20. 2002 Alternative Disposal Procedure for Us Ecology Idaho Site, W/Handwritten Notes)
- ML20263J910 + (Outline:Neutron/Process Rad Div 4)
- ML20263J907 + (Outline:Neutron/Process Rad Div 4. Sheet 1.Revision Date Illegible)
- ML20263J913 + (Outline:Neutron/Process Rad Div 4. Sheet 3)
- ML20263J961 + (Outline:Position Multiplexer Cabinet. Sheet 2)
- ML20263J917 + (Outline:Principal Plant Control Console. Revision Date Illegible)
- ML20263B397 + (Outline:Unit Control Board 2UBI & 2UB2)
- ML20263B438 + (Outline:Unit Control Board 3UB2)
- ML20263B328 + (Outline:Unit Control Board IUB1 & IUB2)
- ML20263C118 + (Outlines & Sections Diesel Generator Local Panel)
- ML19312C891 + (Outlines 730615 Telcon W/Util Re Commitments Made by Util During OL Review for Pipe & Component Vibration Test Repts, Seismic Data Use & Steam Generator Subcompartment Structural Capability Analysis)
- ML19312C897 + (Outlines 730617 Telcon W/F Jape Re Util Request for Exception to Order of Performance of Full & Half Pressure Containment Leak Tests.Significant Time Period Required Between Tests.Fuel Loading Date Now 730813)
- ML19312C892 + (Outlines 730618 Telcon W/Util Re Containment Structural & Leak Testing.Half Pressure Test Not to Be Approved Before 730624)
- ML20024C563 + (Outlines 780305-07 B&W Util Nuclear Operating Experience Seminar Program in Hershey,Pa)
- ML19318A179 + (Outlines 800516 Insp of Geologic Faulting in Unit 1 Spray Pond.Util May Proceed W/Fill Concrete Operations on Zone 20 & Fault 19.Addl Faulting Must Be Reported)
- ML19338C554 + (Outlines 800729-31 Site Visit & Meeting to Become Familiarized W/Plant & Represent NRC in Annual Performance Evaluation.Evaluation & Meeting Summary Will Be Distributed)
- ML20127M101 + (Outlines Accelerated Schedule on Containment Margin Program. Schedule Moves Completion Date of Separable Component Development & Testing from FY86 to Early FY85)
- ML20148L251 + (Outlines Acceptance Criteria for Facility Licensing Process)
- ML19290C401 + (Outlines Action Items from 791212 Meeting W/Sandia Labs)
- ML19296C921 + (Outlines Action Items to Be Implemented Re QA Program Per 791228 Meeting.Includes 800104 Seminar W/Const & QC Personnel,Procedure Changes,Written Policy Re Problem Solutions & Overall Mgt Assessment of QC & QA Personnel)
- ML19220C939 + (Outlines Action Plan for Developing Regulatory Options on Sister B&W Operating Reactors)
- PY-CEI-NRR-1819, Outlines Actions Being Taken to Assure That Plant Design Mod Installed During Fourth Refueling Outage (RF04) Acceptable, to Address NRC Concerns Presented at NRC Insp on 940509-0610 Exit Meeting + (Outlines Actions Being Taken to Assure That Plant Design Mod Installed During Fourth Refueling Outage (RF04) Acceptable, to Address NRC Concerns Presented at NRC Insp on 940509-0610 Exit Meeting)
- W3P82-2712, Outlines Actions Taken to Comply w/10CFR73.21 & NUREG-0794. QA Audit Plan Will Commence on 820830.Full Compliance Expected by 820908 + (Outlines Actions Taken to Comply w/10CFR73.21 & NUREG-0794. QA Audit Plan Will Commence on 820830.Full Compliance Expected by 820908)