Outlines Action Plan for Developing Regulatory Options on Sister B&W Operating Reactors
ML19220C939
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/03/1979
From:
NRC COMMISSION (OCM)
To:
NRC COMMISSION (OCM)
References
NUDOCS 7905160081
Download: ML19220C939 (2)


Text

...

o-328 ACTION PLAN FOR DEVELOPING REGULATORY OPTIONS ON SISTER BABCOCK & WILCOX OPERATING REACTORS Commissioners Gilinsky and Kennedy are acting as a cubec=mittee of the full Cc= mission for the purpose of developing regulatory options on the Babcock & Wilcox operating reactors that are essentially similar in design to Unit 2 of Three Mile Island.

Governor Brown cf California has petitioned the Commission to shut down one auch reactor, Rancho Seco, as a precautionary measure pending development of more definitive information about the causes cf the Three Mile Island situation.

Governor Brown's petition, and an3 similar petitions, should be acted upon expeditiously, recogni-ing that full infnrnation about and evaluation of the TMI situation will not yet be avail-able.

Accordingly, CGC suggests that the following steps be taken:

I.

Immediate Staff Work A.

Obtain best available preliminary 'cechnical evalua-tion of the significance of the TMI accident for the sister plants.

The focus should be on whether presently available information indicates a generic design or procedural probler.

B.

Determine current operating status of sister plants --

e.c.,

Davis-Eesse is not presently operating.

C.

Determir.e probable practical effects of the follow-ing regulatory options:

1.

Provisicn of resident inspector and other meas-ures already adopted.

2.

Increased inspection and surveillance above current levels.

3 Operation at reduced power levels.

4.

Other possible safety conditions -- e.g.,

provision of additional safety equipment.

5 Precautionary shutdown pending more definite identification of TMI problem.

SUSPENSE:

Tuesday noon, April 3 118 150 005160071 \\

p

2

~

-- 9 =# ~~ ~

.' ~ ~ ' ___u=cE

---id51-25-N_=__.._--T..._.1.-_

'~

. _....... _.. =

=

-~~

T. ".

. C

.o II.

Briefing of Gilinsky-Kennedy subec:=ittee on results of I.A-C.

SUSPE!iSE:

Tuesday afternoon.

III. Subcomittee discussion of regulatory options in light of the triefing.

SUSPE:!SE:

Tuesday afternoon, following briefing IV.

Presentation of preferred options to full Commission, and Commission decision SUSF EllSE :

Wednesday morning V.

Implementation of Cc= mission decision SUSPE!!SE:

Wednesday noon.