ML19312C892
Jump to navigation
Jump to search
| ML19312C892 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/19/1973 |
| From: | Peltier I US ATOMIC ENERGY COMMISSION (AEC) |
| To: | US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001130065 | |
| Download: ML19312C892 (1) | |
Text
JUN 1 9 1973 (Note.toFile:
TELECON WITH PAUL BARTON OF DU
- 1. Peltier and M. Fairtile callKE POWER - JUN 18, 1973 with regard to the conduct of st ed P. Barton to clarify our positi Oconee 2 containment.
ructural and leak testing of The 68 psi structural test wa on the and at the time of the telecon s completed at 11:30 a.m. J 59 psi full pressure leak t staff for the full pressure testus that it would us est level for stabilization
, 1973 riteria already appro.
e approve a half pressure test pe f Duke assured g
Duke was told that we wouldved by the assuming that the containment i immediately following the f ll r
s depressurizedormed sooner than Sunda not u
pressure test.
to atmospheric press,ure 1973 f, nk I. A'. (f f.:V;'
f Pressurized h'ater ReactorsPeltier, Branch No. 4 ASchwencer Directora te cc:
RCDeYoung of Licensing MFairtile
)
~
g 9 9.w on