Outlines 730618 Telcon W/Util Re Containment Structural & Leak Testing.Half Pressure Test Not to Be Approved Before 730624
ML19312C892
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 06/19/1973
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001130065
Download: ML19312C892 (1)


Text

JUN 1 9 1973 (Note.toFile:

TELECON WITH PAUL BARTON OF DU

1. Peltier and M. Fairtile callKE POWER - JUN 18, 1973 with regard to the conduct of st ed P. Barton to clarify our positi Oconee 2 containment.

ructural and leak testing of The 68 psi structural test wa on the and at the time of the telecon s completed at 11:30 a.m. J 59 psi full pressure leak t staff for the full pressure testus that it would us est level for stabilization

, 1973 riteria already appro.

e approve a half pressure test pe f Duke assured g

Duke was told that we wouldved by the assuming that the containment i immediately following the f ll r

s depressurizedormed sooner than Sunda not u

pressure test.

to atmospheric press,ure 1973 f, nk I. A'. (f f.:V;'

f Pressurized h'ater ReactorsPeltier, Branch No. 4 ASchwencer Directora te cc:

RCDeYoung of Licensing MFairtile

)

~