Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML11235A542 + (Lr - FENOC Correspondence Sent Today)
- ML11234A355 + (Lr - FENOC Correspondence Sent Today)
- ML11293A288 + (Lr - FENOC Correspondence Sent Today, 8/26/11)
- ML11235A541 + (Lr - FENOC Correspondence Sent to Day - Email 2 of 2)
- ML11235A539 + (Lr - FENOC Correspondence Sent to Day - Email 2 of 2)
- ML11234A263 + (Lr - FENOC Correspondence Sent to Day - Email 2 of 2)
- ML12269A657 + (Lr - FENOC Letter -- Davis-Besse License Renewal RAI 4.7.5.1-1 Supplement for Weld Overlay Sent Today)
- ML12269A679 + (Lr - FENOC Letter -- Davis-Besse License Renewal RAI 4.7.5.1-1 Supplement for Weld Overlay Sent Today)
- ML12020A310 + (Lr - FENOC Letter L-11-237)
- ML12020A282 + (Lr - FENOC Letter L-11-238 Dated Today Aug 17, 2011)
- ML12021A009 + (Lr - FENOC Letter L-12-001 Signed and Mailed)
- ML12269A690 + (Lr - FENOC Letter L-12-243 -- Response to Davis-Besse License Renewal RAI on Operating Experience)
- ML12321A268 + (Lr - FENOC Letter L-12-406 -- Supplemental Response to RAIs)
- ML12321A267 + (Lr - FENOC Letter L-12-406 -- Supplemental Response to RAIs)
- ML13016A509 + (Lr - FENOC Letter L-12-432 -- Supplemental Response to RAI B.2.2-3)
- ML11294A175 + (Lr - FENOC License Renewal Letter L-11-257 for Davis-Besse -- LRA Annual Update)
- ML13024A267 + (Lr - FENOC License Renewal Letter L-12-455 (High Strength Bolting) Sent Today)
- ML13024A268 + (Lr - FENOC License Renewal Letter L-12-455 (High Strength Bolting) Sent Today)
- ML11363A015 + (Lr - FENOC Meeting Minutes)
- ML12349A154 + (Lr - FENOC Telecon Notes from November 20, 2012 (Diesel Oil Storage Tank Sealant))
- ML12349A153 + (Lr - FENOC Telecon Notes from November 20, 2012 (Diesel Oil Storage Tank Sealant))
- ML13016A524 + (Lr - FENOC Telephone Conference Summary -- High Strength Bolting)
- ML13016A523 + (Lr - FENOC Telephone Conference Summary -- High Strength Bolting)
- ML13024A277 + (Lr - FENOC Telephone Conference Summary 1/23/2013 -- Shield Building RAIs)
- ML12072A348 + (Lr - FENOCs Response to Abandoned Equipment)
- ML102731018 + (Lr - FRN for Intent to Prepare an EIS)
- ML11360A019 + (Lr - FW:)
- ML103500391 + (Lr - FW:)
- ML14036A196 + (Lr - FW: 11-0332; Davis Besse License Renewal, Draft EIS)
- ML12164A996 + (Lr - FW: 2/16/12 - LIM - Response to RAI Dated 1/17/12)
- ML12165A023 + (Lr - FW: 3.20.12 - LIM - Response to RAI Dated 2.23.12 & 3.9.12 Re. LGS Lra.Pdf - Adobe Acrobat Professional)
- ML12165A022 + (Lr - FW: 3.30.12 - LIM - Response to RAI Dated 3.22.12 & Info. Addressing Minor Errors or Omissions Re. LGS Lra.Pdf - Adobe Acrobat Professional)
- ML12165A025 + (Lr - FW: 3.5.12 - LIM - Response to RAI Dated 2.16.12 & 2.17.12 Re. LGS Lra.Pdf - Adobe Acrobat Professional)
- ML12164A016 + (Lr - FW: 5.7.12 - LIM - Response to RAI Dated 4.30.12 Re. LGS Lra.Pdf - Adobe Acrobat Professional)
- ML12194A280 + (Lr - FW: 7/11/12 - LIM - Response to NRC RAI Dated 7/10/12 Re. LGS LRA)
- ML12045A559 + (Lr - FW: 8 2 2011 Telephone Conference Summary for Your Review)
- ML102730946 + (Lr - FW: Access for Reviewers for Upcoming Audit)
- ML12263A327 + (Lr - FW: Advance Copy, Annual Update)
- ML11307A019 + (Lr - FW: August 3rd, 2011, Teleconference Topics of Discussion)
- ML103140173 + (Lr - FW: B3.8.3: Diesel Fuel Oil Chemistry)
- ML12013A384 + (Lr - FW: Clarification Questions Related to the Response to RAI 3.5.2.2.1.7-1)
- ML12013A385 + (Lr - FW: Clarification Questions Related to DB Response to RAI 3.3.2.18-1)
- ML11294A181 + (Lr - FW: Closing of the DB CASS Loss of Fracture Toughness Item)
- ML12043A032 + (Lr - FW: Completion of Actions Required by Confirmatory Action Letter 3-10-001)
- ML11307A134 + (Lr - FW: Corrosion Resistant Materials Handbook - Google Books)
- ML11234A259 + (Lr - FW: DB Conference Call Request)
- ML11234A257 + (Lr - FW: DB Conference Call Request)
- ML11357A028 + (Lr - FW: DB Draft RAI B.2.39-13 on Shield Building Cracks)
- ML13016A507 + (Lr - FW: DB High Strength Bolt Inspection Deferrals)
- ML13016A505 + (Lr - FW: DB High Strength Bolt Inspection Deferrals)
- ML13016A502 + (Lr - FW: DB High Strength Bolt Inspection Deferrals)