Lr - FENOC Telecon Notes from November 20, 2012 (Diesel Oil Storage Tank Sealant)
ML12349A154
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/29/2012
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML12349A154 (3)


Text

Davis-BesseNPEm Resource From: dorts@firstenergycorp.com Sent: Thursday, November 29, 2012 10:11 AM To: Milano, Patrick Cc: CuadradoDeJesus, Samuel; custerc@firstenergycorp.com

Subject:

FENOC Telecon Notes from November 20, 2012 (Diesel Oil Storage Tank Sealant)

Attachments: NRC telecon 20121120 Diesel fuel oil storage tank sealant.pdf Pat..... attached is a copy of our telephone conference call notes from the telecon held on November 20, 2012, where the Davis-Besse Diesel Oil Storage Tank sealant issue was discussed.

Please contact Cliff Custer or me with questions regarding the telecon notes.

Thank you, Steve Dort Davis-Besse License Renewal


The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.

1

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 3954 Mail Envelope Properties (OF51767AAC.CC170023-ON85257AC5.0052F178-85257AC5.005364D8)

Subject:

FENOC Telecon Notes from November 20, 2012 (Diesel Oil Storage Tank Sealant)

Sent Date: 11/29/2012 10:10:53 AM Received Date: 11/29/2012 10:11:05 AM From: dorts@firstenergycorp.com Created By: dorts@firstenergycorp.com Recipients:

"CuadradoDeJesus, Samuel" <Samuel.CuadradoDeJesus@nrc.gov>

Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None Post Office: FirstEnergyCorp.com Files Size Date & Time MESSAGE 919 11/29/2012 10:11:05 AM NRC telecon 20121120 Diesel fuel oil storage tank sealant.pdf 23700 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Doc No. 112012 TO: File DATE: November 20, 2012 FROM: Kathy Nesser

SUBJECT:

NRC Telecon Regarding Davis-Besse License Renewal -

Clarification of Diesel fuel oil storage tank sealant NRC Attendees: Sam Cuadrado de Jesús, Bill Holston FENOC Attendees: Ken Byrd, Cliff Custer, Larry Hinkle, Don Kosloff, Kathy Nesser This telephone conference call was initiated by Sam Cuadrado de Jesús, NRC Project Manager for Davis-Besse License Renewal. The telecon took place at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> on November 20, 2012. The purpose of the call was to discuss the FENOC response to NRC request for additional information (RAI) A.1.2-1 submitted by FENOC letter L-11-218 dated July 22, 2011 (ML11208C274).

FENOC updated the NRC staff on the immediate actions that are being taken to correct information that was provided in the response to RAI A.1.2-1. During a preventive maintenance (PM) task, it was discovered that there is no visible moisture barrier between the bottom of the diesel fuel oil storage tank and the concrete support pad for the tank. A condition report was generated in the FENOC Corrective Action Program to document the difference between the as-built drawing for the tank and the as-found condition of the tank. Also, during performance of the PM task, areas of corrosion were discovered on the horizontal flange at the bottom of the tank. Based on recollection of the PM inspection report content, this was described as areas with surface roughness from corrosion but with no rust flaking. The PM also included an ultrasonic testing (UT) examination of the tank bottom. A robotic crawler was used to perform the examination from the inside of the tank. The repairs for the tank are scheduled to begin the week of November 26, 2012.

FENOC summarized the call stating that the condition was identified and entered into the Corrective Action Program, and the repair activities are scheduled.

The NRC staff stated that FENOC should submit a corrected response to RAI A.1.2-1 with the details of the UT examination (how many points were done, the results, if the results meet the design criteria and, if not, why the tank condition is acceptable).

The FENOC supplemental response to RAI A.1.2-1 will include a discussion to address the following items: 1) the as-found condition of the tank; 2) that the condition was entered into the Corrective Action Program; 3) details of the UT examination and the results; and, 4) whether the design criteria was met, and if not, a justification as to why the condition of the tank is acceptable.