Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Ja FitzPatrick Cycle 12 Startup Testing Rept". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20266E231  + (JB-672A Wiring Diagram)
  • ML13226A498  + (JCN-N6783 Properties of CRDM Welds)
  • ML13226A494  + (JCN-N6783 Properties of CRDM Welds)
  • ML13226A448  + (JCN-N6783 Properties of CRDM Welds)
  • ML18061A126  + (JELD-WEN, Inc.; Cover Letter Dtd February 22, 2018, for License Renewal, License Amendment No. 4; Control No. 602155)
  • ML14121A414  + (JEXU-1041-1012, Rev. 0, Mapping of Meltac Licensing Documents to DI&C-ISG-06 Guidance)
  • ML25069A454  + (JEXU-1041-1015-NP (R2), Meltac Platform ISG-04 Conformance Analysis)
  • ML25069A456  + (JEXU-1041-1016-NP (R2), Meltac Platform Software Program Manual)
  • ML25069A458  + (JEXU-1041-1018-NP (R2), Summary of Compliance to the IEEE Std. 603 and IEEE Std. 7-4.3.2)
  • ML25069A460  + (JEXU-1041-1162-NP(R1), Summary of Compliance to the Regulatory Guide 1.152 Revision 4)
  • ML24137A154  + (JEXU-1041-2146-NP, Collection of Editorial Changes on Meltac LTR and Its Supporting Documents by Revision of Regulatory Guide 1.152 and IEEE Std. 7-4.3.2)
  • ML20094N846  + (JFP-3A - Analysis of Geodetic Data. W/Two Oversize Graphs. Aperture Cards in PDR)
  • ML20054A307  + (JIC Management)
  • ML003758754  + (JOG, Letter, Schedule for Completion of Joint Owners Group Program on Motor-Operated Valve Periodic Verification)
  • ML052140506  + (JOG, Technical Audit of Joint Owners Group Program on Motor Operated Valve Periodic Verification)
  • ML22146A017  + (JPM 1a)
  • ML22146A019  + (JPM 1b)
  • ML22146A023  + (JPM 2)
  • ML22146A024  + (JPM 3)
  • ML22146A026  + (JPM 4)
  • ML111870306  + (JPM Worksheet Determine Reactivity Effects When Starting Positive Displacement Charging Pump)
  • 05000325/LER-2012-003  + (JUN 0 7 2012 <br/>SERIAL: BSEP 12-00JUN 0 7 2012 <br/>SERIAL: BSEP 12-0061<br/> 10 CFR 50.73 <br/>U. S. Nuclear Regulatory Commission <br/>ATTN: Document Control Desk <br/>Washington, DC 20555-0001 <br/>Subject: Brunswick Steam Electric Plant, Unit No. 1 and 2 <br/>Renewed Facility Operating License Nos. DPR-71 and DPR-62 <br/>Docket Nos. 50-325 and 50-324 <br/>Licensee Event Report 1-2012-003 <br/>Ladies and Gentlemen: <br/>In accordance with the Code of Federal Regulations, Title 10, Part 50.73, Carolina Power <br/>& Light Company, now doing business as Progress Energy Carolinas, Inc., submits the <br/>enclosed Licensee Event Report (LER). This report fulfills the requirement for a written <br/>report within sixty (60) days of a reportable occurrence. <br/>Please refer any questions regarding this submittal to Mr. Lee Grzeck, Acting Supervisor <br/>Licensing/Regulatory Programs, at (910) 457-2487. <br/>Sincerely, <br/>/11- 01 <br/>Joseph M. Frisco, Jr. <br/>Plant General Manager <br/>Brunswick Steam Electric Plant <br/>MAT/mat <br/>Enclosure: <br/>Licensee Event Report <br/>Progress Energy Carolinas, Inc. <br/>Brunswick Nuclear Plant <br/>P.O. Box 10429 </br><br/>Southport, NC 28461 </br><br/>Document Control Desk <br/>BSEP 12-0061 / Page 2 <br/>cc (with enclosure): <br/>U. S. Nuclear Regulatory Commission, Region II </br><br/>ATTN: Mr. Victor M. McCree, Regional Administrator </br><br/>245 Peachtree Center Ave. N.E., Suite 1200 </br><br/>Atlanta, GA 30303-1257 </br><br/>U. S. Nuclear Regulatory Commission </br><br/>ATTN: Mr. Philip B. O'Bryan, NRC Senior Resident Inspector </br><br/>8470 River Road </br><br/>Southport, NC 28461-8869 </br><br/>U. S. Nuclear Regulatory Commission (Electronic Copy Only) </br><br/>ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A) </br><br/>11555 Rockville Pike </br><br/>Rockville, MD 20852-2738 </br><br/>Chair - North Carolina Utilities Commission <br/>P.O. Box 29510 </br><br/>Raleigh, NC 27626-0510 </br><br/>ENRC FORM 366U U.S. NUCLEAR REGULATORY COMMISSION <br/>(10-2010) <br/>LICENSEE EVENT REPORT (LER) <br/>(See reverse for required number of <br/>digits/characters for each block) <br/>1. FACILITY NAME <br/>Brunswick Steam Electric Plant (BSEP), Unit 1 <br/>4. TITLE <br/>Valid Emergency Diesel Generator Actuation <br/>APPROVED BY OMB: NO. 3150-0104<br/>EEXPIRES: 10/31/2013 <br/>Estimated burden per response to comply with this mandatory <br/>collection request: 80 hours. Reported lessons learned are <br/>incorporated into the licensing process and fed back to industry. Send <br/>comments regarding burden estimate to the FOIA/Privacy Section (T-5 <br/>F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555<br/>0001, or by internet e-mail to infocollects.resource@nrc.gov, and to <br/>the Desk Officer, Office of Information and Regulatory Affairs, NEOB<br/>10202, (3150-0104), Office of Management and Budget, Washington, <br/>DC 20503. If a means used to impose an information collection does <br/>not display a currently valid OMB control number, the NRC may not <br/>conduct or sponsor, and a person is not required to respond to, the <br/>information collection. <br/>2. DOCKET NUMBER 3. PAGE <br/>05000325 1 of 3esk Officer, Office of Information and Regulatory Affairs, NEOB<br/>10202, (3150-0104), Office of Management and Budget, Washington, <br/>DC 20503. If a means used to impose an information collection does <br/>not display a currently valid OMB control number, the NRC may not <br/>conduct or sponsor, and a person is not required to respond to, the <br/>information collection. <br/>2. DOCKET NUMBER 3. PAGE <br/>05000325 1 of 3)
  • ML19228A170  + (JUTG Presentation Interrupting Rating)
  • ML18204A129  + (JW Fourqurean Expert Statement 5-14-2018 Final)
  • ML20035C198  + (Ja FitzPatrick Cycle 11 Startup Testing Rept)