Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18023A137 + (Issuance of the Core Operating Limits Reports)
- RA-12-125, Issuance of the Core Operating Units Report for Reload 23, Cycle 24, Revision 8 + (Issuance of the Core Operating Units Report for Reload 23, Cycle 24, Revision 8)
- ML102350315 + (Issuance of the Environmental Scoping Summary Report for the Staffs Review of the License Renewal Application for Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station)
- ML092030185 + (Issuance of the Environmental Scoping Summary Report for the Staffs Review of the License Renewal Application for Duane Arnold Energy Center)
- ML23195A076 + (Issuance of the Final Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor)
- ML24127A209 + (Issuance of the Nuclear Regulatory Commission Facility Security Clearance for the Global Laser Enrichment New Headquarters Building)
- RA-08-106, Issuance of the Oyster Creek Core Operating Limits Report for Cycle 22, Revision 4 + (Issuance of the Oyster Creek Core Operating Limits Report for Cycle 22, Revision 4)
- ML061530472 + (Issuance of the Oyster Creek Core Operating Limits Report for Cycle 20, Revision 1)
- ML062960368 + (Issuance of the Oyster Creek Operating Limits Report for Cycle 21 (Document No. COLR Oyster Creek 1 Rev 2))
- ML24110A141 + (Issuance of the Power Uprate Project Plan, Revision 0)
- ML23215A003 + (Issuance of the Pre-Application Readiness Assessment Summary Report for Selected Sections of the Carbon Free Power Project Draft Limited Work Authorization and Combined License Application Environmental Reports)
- ML23198A270 + (Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2)
- ML25272A189 + (Issuance of the Summary Report for the Environmental Audit of the Tennessee Valley Authority Clinch River Nuclear Site Construction Permit Application (Docket Number: 50-0615))
- ML19218A345 + (Issuance of the Uncontested Hearing Decision and Summary Record of Decision for the Early Site Permit Application Review for Clinch River Nuclear Site - Letter)
- ML16204A188 + (Issuance of the Updated Standard Review Plan for Public Comment Without ACRS Review)
- ML13289A167 + (Issuancee of NPDES Permit TN0026450, TVA-Sequoyah Nuclear Plant, Soddy Daisy, Hamilton County, Tennessee)
- ML100740260 + (Issue - Statement of Confirmation)
- ML20058J424 + (Issue 1 for 1990, Journal of Industrial & Nuclear Safety)
- ML20217K272 + (Issue 1 of 611/AY/43774/000, Intermittent EPD Sounder Fault Rept)
- ML20058J757 + (Issue 1 of Handbook of Std of Matls for Safety of Nuclear Power Stations. Pages 1 & 2 Missing)
- ML20091Q489 + (Issue 1 of Rev 8 to Inservice Testing Program for Pump & Valves)
- ML20128N419 + (Issue 1 to G-13, Fitness for Duty)
- ML20141H544 + (Issue 1 to NDE Procedure QCIM-38, Ultrasonic Exam of Class 1 & 2 Piping Welds Joining Similar & Dissimilar Matls)
- ML20136H282 + (Issue 1 to Procedure P-12, Plant Maint - Mechanical, Electrical & Relay Shop)
- ML20078R707 + (Issue 1 to Procedure RPAP-2, Offsite Dose Calculation Manual)
- ML20078R705 + (Issue 1 to Procedure RPAP-3, Process Control Program)
- ML20150E304 + (Issue 1 to Procedure SR 5.4.1.3.8.abcd-R2, Steam Line Rupture Detection/Isolation Sys (Slrdis) Calibr & Testing for Panel I-93544)
- ML20150E314 + (Issue 1 to Procedure SR 5.4.1.3.8.abcd-R1, Steam Line Rupture Detection/Isolation Sys (Slrdis) Calibr & Testing for Panel I-93543)
- ML20134E865 + (Issue 1 to Procedure SR-TE-9-X, Inserted Rod Position Verification)
- ML20137W514 + (Issue 1 to QAP-2, Guidelines for Preparation of Emergency Procedures)
- ML20093K157 + (Issue 1 to Radiological Emergency Response Planning Implementation Procedure RERP-CORE, Core Damage Evaluation)
- ML20205H654 + (Issue 1 to Rev 2 to Offsite Dose Calculation Manual)
- ML20043H936 + (Issue 1 to Rev 4 to Inservice Testing Program for Pumps & Valves)
- ML19325C967 + (Issue 1 to Rev 4 to Inservice Testing Program for Pumps & Valves,Unit 2)
- ML20206J741 + (Issue 1 to SRD Dependent Failures Procedures Guide)
- ML20101U050 + (Issue 1 to Technical Svc Procedure TSP-30, Evaluation of Shim Motor Wattage Characteristics)
- ML20203N865 + (Issue 1 to Training Procedure - Licensed Operator Requalification)
- ML20210S143 + (Issue 1 to Training Procedure - Special Senior Licensed Operator (Fuel Handler))
- ML20215C430 + (Issue 1,Rev 1 to Process Control Program Unit 2 QA Category II, Chapter 18 of Operating Manual Re SER Confirmatory Item 40)
- ML20086S958 + (Issue 1,Rev 1,to SI Accumulator Discharge Check Valve Full Stroke Test, Test Results Rept)
- ML20086S939 + (Issue 1,Rev 1,to SI Accumulator Discharge Check Valves Full Stroke Test, Test Results Rept)
- ML20086T000 + (Issue 1,Rev 1,to SI Accumulator Discharge Check Valves Full Stroke Test)
- ML20116B327 + (Issue 1,Rev 10 to Inservice Testing Program for Pump & Valves)
- ML20085J602 + (Issue 1,Rev 14a to BVPS Unit 2 IST Program for Pumps & Valves)
- ML20096D381 + (Issue 1,Rev 15 to Beaver Valley Unit 2 Inservice Testing Program for Pumps & Valves)
- ML20086S973 + (Issue 1,Rev 2,to SI Accumulator Discharge Check Valves Full Stroke Test)
- ML20247A141 + (Issue 1,Rev 3 to Beaver Valley Power Station Unit 2 Odcm)
- ML20086T073 + (Issue 1,Rev 5, Safety Injection Sys Full Flow Test, Operating Surveillance Test)
- ML20094S157 + (Issue 1,Rev 9 to Inservice Testing Program for Pump & Valves)
- ML20212B285 + (Issue 10 to Procedure Q-3, Design Control Sys)
- ML20137P137 + (Issue 107,Main Transformer Failures, Ltr Rept)