Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Regulatory Guide 1.128 + (Installation Design and Installation of Large Lead Storage Batteries for Nuclear Power Plants)
- ML20262C074 + (Installation Details for Sidewall Drainage & 8 Mil PE Cells 36 & 37)
- ML20266H514 + (Installation Drawing DSR-48)
- ML20263J984 + (Installation Drawing DSR-48)
- ML20265B609 + (Installation Dwg Beta Gauge Backscatter Retracting Mount Assembly (Motorized or Manual) with BGH-2A Detector Head)
- ML20259D896 + (Installation Kit:Equipment Storage Racks. No Rev Date)
- ML20260D909 + (Installation Kit:Equipment Storage Racks. Sheet 1)
- ML20260D913 + (Installation Kit:Equipment Storage Racks. Sheet 2)
- ML20259D904 + (Installation Kit:Equipment Storage Racks. Sheet 2.No Rev Date)
- ML20259D899 + (Installation Kit:Fuel Storage Vault. No Rev Date)
- ML20260D907 + (Installation Kit:Fuel Storage Vault. Revision Date Illegible)
- ML20265E485 + (Installation Layout Assembly of Pinned Buttress & Based Connection for Tw and SW, as-built)
- ML20265C697 + (Installation Outline BH-7 Backscatter Head & Mount)
- ML18081A751 + (Installation Procedure (Underwater) for Increased Capacity Spent Fuel Storage Racks)
- ML17258A456 + (Installation Procedure Circulating Water Piping)
- L-86-024, Installation Procedure ML-86-024, Limitorque Valve Actuator Qualification Insp/Upgrades. Result Summary of Limitorque Control Wire Insps,Per IE Info Notice 86-003,encl + (Installation Procedure ML-86-024, Limitorque Valve Actuator Qualification Insp/Upgrades. Result Summary of Limitorque Control Wire Insps,Per IE Info Notice 86-003,encl)
- ML20129G217 + (Installation Procedures for Pci Sure-Hold Bands to Provide Post-LOCA Protection W/Metal Jacketed Nukon Insulation)
- ML23271A004 + (Installation Support License Amendment Request Public Notice and Hearing Request Notice)
- ML19246B910 + (Installation Test Rept for Kinemetrics Sma,S/N 170 Recording Sys W/Three Teledyne FB-103B Accelerometers,One Teledyne 36180 Trigger & Kinemetrics SMP-1,S/N 181 (Playback Unit))
- ML20236S003 + (Installation Test for 3DStress Version 1.2)
- ML031530185 + (Installation and Test Requirements)
- 05000364/FIN-2014009-01 + (Installation of 1.5-hour UL Labeled Fire Door in a Required 3-hour Fire Barrier on Unit 2)
- ML20210E755 + (Installation of Bisco Penetration Sleeve Extension Utilizing Biscoseal (Pourable or Trowelable))
- 05000390/FIN-2008004-01 + (Installation of Different RHR flow Limiters Than Prescribed by Procedure)
- 05000382/FIN-2009009-05 + (Installation of Emergency Feedwater Turbine Driven Pump Discharge Check Valve 207 AB)
- ML20045C187 + (Installation of Fixed Gauges)
- ENS 45696 + (Installation of Incorrect Transformer on a Control Board for a Battery Charger)
- ML090160255 + (Installation of Marathon-5S Control Rod Assemblies)
- 05000321/FIN-2017003-01 + (Installation of Non-Conforming RPS Equipment)
- 05000424/FIN-2011004-01 + (Installation of Non-Conforming Safety-Related Breakers due to a Failure to Implement Corrective Action To Prevent Recurrence to Address a Significant Condition Adverse to Quality)
- 05000269/FIN-2011018-01 + (Installation of Non-Qualified SSF Pressurizer Heater Breakers Impacting Operability During Certain SSF-Credited Events)
- 05000237/FIN-2010004-03 + (Installation of Nonconforming Material Into a Safety-Related System)
- Regulatory Guide 1.67 + (Installation of Overpressure Protection Devices)
- ML20262H563 + (Installation of PR2905-4 3 Ft 9 & 1/2 Inches X 7 Ft 1/2 Inch Door & Frame Assy. Sheet 1 of 1.No Revision Date)
- NL-10-102, Installation of Plant Integrated Computer System in Unit 3 Simulation Facility Prior to Installation in the Unit 3 Nuclear Power Plant Control Room + (Installation of Plant Integrated Computer System in Unit 3 Simulation Facility Prior to Installation in the Unit 3 Nuclear Power Plant Control Room)
- ML20155F119 + (Installation of RELAP5/MOD3.2 on 80486 and Pentium Based Personal Computers)
- ML19221A028 + (Installation of Sleeves at TMI-2 Steam Generators)
- ML18093A179 + (Installation of Trip-A-Unit Protection Scheme Suppl Info Salem & Hope Creek Generating Stations)
- ML060760371 + (Installation of a Hardened Wetwell Vent (Generic Letter)(Pa))
- 05000348/FIN-2008002-01 + (Installation of a Maintenance Jumper for the 2C CCW Pump Cell Switch)
- 05000395/FIN-2013009-01 + (Installation of a modification using a superseded version of a procedure)
- 05000321/FIN-2012005-03 + (Installation of a transformer for the TSC cooling coil and condensing unit control circuit not adequately designed to provide full system load)
- 05000458/FIN-2018001-02 + (Installation of an Incorrectly Specified Relay Causes Plant Transient and Reactor Scram)
- 05000315/FIN-2009005-02 + (Installation of non-conforming parts on the safety-related emergency diesel generators.)
- ML20198E786 + (Installation,Operating & Maint Instruction I-1137 for Crosby Style Ha Self-Actuated Nozzle Type Safety Valves)
- ML20206M461 + (Installation,Operating & Maint Manual for Batch 1 Balancing Dampers. W/Three Oversize Drawings)
- 05000387/FIN-2012002-03 + (Installed Instrumentation Necessary for EAL Declaration)
- ENS 55802 + (Instances of Unanalyzed Conditions)
- ML24242A067 + (Institute of Nuclear Power Operations (INPO) Submittal of 30-Day Report Per 10 CFR26.719(c)(1) Unanticipated Result for FFD Performance Test Sample)
- ML17289A723 + (Institutional Custody Fiduciary Svcs)
- ML17289A725 + (Institutional Custody Fiduciary Svcs)