Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Initial Approach to Power Tests (B-Series)". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML18201A565  + (Initial Acceptance Review Generic Issue for Procedures to Address Anticipated Operational Occurences (Aoos))
  • NLS2004105, Initial Actions Summary Report and Response to NRC Generic Letter 2003-01, Control Room Habitability.  + (Initial Actions Summary Report and Response to NRC Generic Letter 2003-01, Control Room Habitability.)
  • ML042800269  + (Initial Actions Summary Report and Response to NRC Generic Letter 2003-01, Control Room Habitability)
  • ML041070051  + (Initial Admin RO JPM 013.01)
  • ML041070054  + (Initial Admin RO JPM 1405.0401)
  • ML041070020  + (Initial Admin RO JPM 3831.0101)
  • ML041060492  + (Initial Admin RO JPM 9011.0102)
  • ML041070080  + (Initial Admin SRO JPM 1701.5601)
  • ML041070068  + (Initial Admin SRO JPM 3821.0102)
  • ML041070061  + (Initial Admin SRO JPM 901101.0101)
  • ML041070057  + (Initial Admin SRO JPM 997777.02)
  • ML041070064  + (Initial Admin SRO JPM 997777.0301)
  • ML040760845  + (Initial Administrative JPMs for the Kewaunee Initial Examination - February 2004)
  • ML20149M467  + (Initial Annual Operating Rept for 1987,submitted Prior to Mar 1 of Yr Following Initial Criticality.Recorded Whole Body Exposure for CY87 Indicated No Individual Received Exposure of 100 Mrem or Greater)
  • ML20034C435  + (Initial Annual Radiological Environ Monitoring Rept Covering Period:Jan 1982 - Dec 1989. W/)
  • ML19224B954  + (Initial Answer to Petitions to Intervene.Recommends All Petitioners Be Accepted as Parties.Defers Response to Petitions of Village of Mexico,Ny & Oswego County,Ny. Certificate of Svc Encl)
  • ML20098F658  + (Initial Approach to Power (B-Series) Startup Test Rept, for Period Ending 840820)
  • ML20041F367  + (Initial Approach to Power Tests (B-Series), Interim Rept 21,for Period Ending 811122)
  • ML20033A532  + (Initial Approach to Power Tests (B-Series),Interim Rept 20, for Period 810523-0822)
  • ML20073S325  + (Initial Approach to Power Tests (B-Series), Interim Rept 26 for Period Ending 830222)
  • ML20087M893  + (Initial Approach to Power Tests (B-Series), Interim Rept 30 for Period Ending 840222)
  • ML20055B986  + (Initial Approach to Power Tests (B-Series),Interim Rept 23 for Period Ending 820522)
  • ML19211A955  + (Initial Approach to Power Tests (B-Series),Interim Startup Rept 13 for 790823-1122)
  • ML20042B839  + (Initial Approach to Power Tests (B-Series), Interim Rept 22 for 811123-820222,per Tech Specs Section 7.5.1a)
  • ML19305C357  + (Initial Approach to Power Tests (B-Series), Interim Rept 14 for Period Ending 800222)
  • ML19347C996  + (Initial Approach to Power Tests (B-Series))
  • ML19259C095  + (Initial Approach to Power Tests (B-Series), Interim Rept 11,790222-0522)
  • ML19253A603  + (Initial Approach to Power Tests (B-Series),Interim Rept 12)
  • ML20066A381  + (Initial Approach to Power Tests, Interim Rept 24 for Period Ending 820822)
  • ML19254E077  + (Initial Assessment of Flash Density & Peak Current Characteristics of Lightning Flashes to Ground in South Fl)
  • ML12093A095  + (Initial Assessment of Pilgrim Safety Enhancement Program)
  • ML20056B551  + (Initial Assessment of the Mechanisms and Significance of LOW-TEMPERATURE Embrittlement of CAST Stainless Steels in LWR Systems)
  • ML20053A573  + (Initial Brief Concerning Judge E Hill Disqualification.Aslab 820415 Order Should Be Affirmed.Aslab Applied Correct Legal Std.Hill Separate Statements Constitute Evidence of Bias/ Prejudice.Certificate of Svc Encl)
  • ML25062A298  + (Initial Brief by Beyond Nuclear and Sierra Club on Referred Questions Regarding Official Acknowledgement Doctrine)
  • ML23313A179  + (Initial Brief for Federal Respondents)
  • ML25111A234  + (Initial Brief for Federal Respondents)
  • ML20052H851  + (Initial Brief in Response to Commission 820506 Order. Citizens Concerned About Nuclear Power Cannot Get Fair Hearing in Light of Judge Hill Affirmative Expression of Hostility.Certificate of Svc Encl)
  • ML20204E513  + (Initial Brief of Applicants in Response to NRC Memorandum & Order Re Antitrust Review of License Transfers.* Commission Should Deny Licensee Petition,For Listed Reasons.With Certificate of Svc)
  • ML23338A007  + (Initial Brief of Intervenor Holtec International)
  • ML25126A125  + (Initial Brief of Intervenor-Respondents Nuclear Energy Institute, Inc., Florida Power & Light Company, and Nextera Energy Point Beach, LLC)
  • ML23277A044  + (Initial Brief of Petitioners Fasken Land and Minerals, Ltd. and Permian Basin Land and Royalty Owners)
  • ML023440261  + (Initial Comments & Questions on MRP-75, PWR Reactor Pressure Vessel Upper Head Penetrations Inspection Plan, Rev. 1)
  • ML20092A413  + (Initial Comments on NRC 840601 Order Requesting Comments on Whether Immediate Effectiveness of 1979 Shutdown Order Should Be Lifted.Lifting of Order Opposed Due to Safety Concerns.Certificate of Svc Encl)
  • ML033360571  + (Initial Comments on U.S. NRC Implementation Plan for the Final Policy Statement of Decommissioning Criteria for the West Valley Demonstration Project at the West Valley Site, May 2003)
  • ML20183A090  + (Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 3)
  • ML22214B335  + (Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities VEGP 4)
  • ML22214B488  + (Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 4)
  • ML20214N012  + (Initial Concepts on Energetics & Mass Releases During Nonnuclear Explosive Events in Fuel Cycle Facilities)
  • ML19220C397  + (Initial Conclusion Re Use of Gadolinia U Dioxide Demonstration Fuel Rods in Initial Core Loading of TMI-2 Has Not Altered After Further Research)
  • ML20197J287  + (Initial Decision (Application for Senior Reactor Operator License).* Appeal of R Herring of NRC Denial of Application for SRO License Denied.With Certificate of Svc.Served on 981211)
  • ML20246H522  + (Initial Decision (Authorizing Spent Fuel Pool Reracking).* Decision LBP-89-12 Granting Judgment for Licensee on Matters Remaining at Issue in Contentions 3,6 & 7,except to Imposed Stated Condition.W/Certificate of Svc.Served on 890510)