Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236F522 + (Independent Assessment of Upper Guide Structure (Ugs) Personnel Contamination Event at Millstone Station Unit 2, Final Rept)
- ML20032C392 + (Independent Assessment of the Steady State Fuel Rod Analysis Code FRAPCON-1)
- ML19347E180 + (Independent Assessment of the Transient Fuel Rod Analysis Code FRAP-T5)
- ML20203A995 + (Independent Auditor Rept & Principal Statements for Yrs Ended 970930 & 1996)
- ML20248H471 + (Independent Auditors Report and Consolidated Financial Statements December 31, 2019 and 2018)
- ML12109A160 + (Independent Auditorss Report for Omaha Public Power District)
- ML20132D880 + (Independent CA Verification Program,Contractor Recommendation)
- ML030430490 + (Independent Check of Seismic Displacement Analysis ISFSI Slope Diablo Canyon, California)
- ML20215L739 + (Independent Code ASSESSMENT:SANDIA-PROPOSED Accuracy Quantification Methodology)
- ML102010505 + (Independent Confirmatory Survey Project-Specific Plan for the Decommissioning of the Enrico Fermi Atomic Power Plant, Unit 1)
- ML22129A117 + (Independent Confirmatory Survey Summary and Results for the U.S. Navy Surface Ship Barge Ballast Wing Tank 9, Port Mobile, Alabama)
- ML20027A238 + (Independent Confirmatory Survey Summary and Results for the Spent Fuel Pool and Transfer Canal at the Zion Nuclear Power Station, Zion, Illinois)
- ML20127H834 + (Independent Confirmatory Survey Summary and Results of the Remaining Land Areas at the Zion Nuclear Power Station, Zion, Illinois)
- ML18285A143 + (Independent Confirmatory Survey Summary and Results for the Containment and Auxiliary Buildings at the Zion Nuclear Power Station, Zion, Illinois)
- ML20029D896 + (Independent Confirmatory Survey Summary and Results for Select Penetrations and Embedded Piping in the Containment and Auxiliary Buildings at the Zion Nuclear Power Station)
- ML17024A021 + (Independent Confirmatory Survey Summary and Results for the Non-Impacted Land Areas at the La Crosse Boiling Water Reactor, Genoa, Wisconsin)
- IR 05000353/1989200 + (Independent Const Assessment Insp Rept 50-353/89-200 on 890330-31.No Violations Noted.Major Areas Inspected:Final S&W Independent Const Assessment Rept & Licensee Action Re Deficiencies & Issues Identified During Overview)
- ML20085L365 + (Independent Const Review of Marble Hill Units 1 & 2, Vol 2, Program Results)
- ML20085L373 + (Independent Const Review of Marble Hill Units 1 & 2, Vol 3, Potential Finding Repts & Corrective Action Plans)
- ML20085L360 + (Independent Const Review of Marble Hill Units 1 & 2, Vol 1, Executive Summary)
- ML20147H035 + (Independent Corrective Action Program for Millstone, Unit 1, Project Manual)
- ML20147H704 + (Independent Corrective Action Verification Program for Millstone Unit 3, Project Manual)
- ML20137Z016 + (Independent Corrective Action Verification Program Millstone Unit 2 Sys Vertical Slice Review Svsr Checklists)
- ML20199D911 + (Independent Corrective Action Verification Program Status Rept, for Period Ending 980123)
- ML20216B179 + (Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary)
- ML20137N890 + (Independent Corrective Action Verification Program Millstone Unit 2 Audit Plan)
- ML20134M278 + (Independent Corrective Action Verification Program)
- ML20202H298 + (Independent Corrective Action Verification Program Status Rept)
- ML20216H735 + (Independent Corrective Action Verification Program Status Rept)
- ML20216H719 + (Independent Corrective Action Verification Program Status Rept)
- ML20216H710 + (Independent Corrective Action Verification Program Status Rept)
- ML20197H587 + (Independent Corrective Action Verification Program, Final Rept,Vol 1)
- ML20206B972 + (Independent Cost Assessment of Nation High-Level Nuclear Waste Program)
- ML20247K044 + (Independent DOE Investigation & Analysis of Waste Tank Farm Contamination Event on 971215)
- ML20080M738 + (Independent Design & Const Verification Program Monthly Status Rept 9 for Jan 1984)
- ML20072E585 + (Independent Design & Const Verification Program,Monthly Status Rept No 1,Period Inception Through 830527)
- ML20050A438 + (Independent Design Review)
- ML20134K958 + (Independent Design Review Panel Rept on 961015)
- ML20093K633 + (Independent Design Review Progress Rept, June-Sept 1984)
- ML20092B439 + (Independent Design Review for Comm Ed, Interim Rept)
- ML20092N536 + (Independent Design Review for Comm Ed,Byron Station Interim Rept)
- ML20072J952 + (Independent Design Review for Shoreham Nuclear Power Station, Executive Summary of Final Rept)
- ML20052C611 + (Independent Design Review of Grand Gulf Nuclear Station-Unit 1, Interim Rept)
- ML20062D033 + (Independent Design Review of Grand Gulf Nuclear Station - Unit 1, Draft Final Rept)
- ML20093C992 + (Independent Design Review of Limerick Generating Station 1, Core Spray Sys, Bimonthly Status Rept 8 for Period Ending 840915.Related Correspondence)
- ML20084S518 + (Independent Design Review of Limerick Generating Station Unit 1 Core Spray Sys, Program Plan & Technical Staff Resumes)
- ML20010D911 + (Independent Design Review of Palo Verde Nuclear Generating Station Auxiliary Sys I:Before Auxiliary Sys Review Board, Vol Ii,App)
- ML20053D339 + (Independent Design Review,Lasalle County Nuclear Station, Unit 1, Final Rept)
- ML20049J719 + (Independent Design Review,Lasalle County Nuclear Station Unit 1,Initial Status Rept for Period 820211-0312)
- ML20127D143 + (Independent Design Review,Shoreham Nuclear Power Station)
- ML20070K913 + (Independent Design Verification Program)
- ML20072R635 + (Independent Design Verification Program Semimonthly Rept,830311)
- ML20085E311 + (Independent Design Verification Program Response to Second Set of Interrogatories)
- ML16340D615 + (Independent Design Verification Program, Semimonthly Rept for Jul 1983)