Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TSTF-373 + (Increase CIV Completion Time from 72 Hours to 7 Days (NPSD-1168))
- TSTF-223 + (Increase Completion Time for HPCI and One ADS Valve Inoperable)
- TSTF-224 + (Increase Completion Time for One ADS and One LOW Pressure ECCS Inoperable)
- TSTF-359 + (Increase Flexibility in Mode Restraints)
- TSTF-519 + (Increase Standardization in Condition and Required Action Notes)
- ML23212A986 + (Increase in American Nuclear Insurers (ANI) Available Primary Liability Insurance Capacity)
- 05000259/LER-1980-049-03, Increase in Pressure Detected on Shell Side of RHR 1-C Hx.Caused by Loose Locking & Full Nuts on Floating Head Due to Thermal Cycling & Vibration.Locking Tabs Installed on Nuts + (Increase in Pressure Detected on Shell Side of RHR 1-C Hx.Caused by Loose Locking & Full Nuts on Floating Head Due to Thermal Cycling & Vibration.Locking Tabs Installed on Nuts)
- ML020800006 + (Increase in the Maximum Fuel rod-average burn-up Limit)
- TSTF-142 + (Increase the Completion Time When the Core Reactivity Balance is Not within Limit)
- TSTF-242 + (Increase the Time to Perform a Cot on Power Range and Intermediate Range Instruments)
- ML18348A881 + (Increase to 2530 Mwt Report, 12/14/1977, Documents Test Results, & Met All Acceptance Criteria & Limits)
- 05000255/FIN-2007006-05 + (Increased Airborne Radioactivity in Containment)
- 05000416/LER-2008-003, Increased Buss Voltages Results in Breaker Trip on Over Current of a High Pressure Core Spray Pump Low Flow Valve Resulting in Non-Compliance with Technical Specification 3.6.1.3, Primary Containment Isolation + (Increased Buss Voltages Results in Breaker Trip on Over Current of a High Pressure Core Spray Pump Low Flow Valve Resulting in Non-Compliance with Technical Specification 3.6.1.3, Primary Containment Isolation.)
- Information Notice 1994-72, Increased Control Rod Drop Time from Crud Buildup + (Increased Control Rod Drop Time from Crud Buildup)
- ML20077C507 + (Increased Core Flow & Extended Load Line Limit Analysis for Hope Creek Generating Station Unit 1,Cycle 2)
- ML20207B389 + (Increased Core Flow & Partial Feedwater Heating Analysis for Limerick Generating Station Unit 1 Cycle 1. Related Correspondence)
- Information Notice 2020-01, Increased Electronic Equipment Issues After Electrostatic Cleaning + (Increased Electronic Equipment Issues After Electrostatic Cleaning)
- Information Notice 1992-33, Increased Instrument Response Time When Pressure Dampening Devices are Installed + (Increased Instrument Response Time When Pressure Dampening Devices are Installed)
- Information Notice 1992-33, Increased Instrument Response Time When Pressure Dampening Devices Are Installed + (Increased Instrument Response Time When Pressure Dampening Devices Are Installed)
- ML18039A882 + (Increased MSIV Leakage Tech Spec Change Submittal - Seismic Evaluation Rept)
- Information Notice 1986-59, Increased Monitoring of Certain Patients with Implanted Coratomic, Inc. Model C-100 and C-101 Nuclear-Powered Cardiac Pacemakers + (Increased Monitoring of Certain Patients with Implanted Coratomic, Inc. Model C-100 and C-101 Nuclear-Powered Cardiac Pacemakers)
- 05000334/LER-1981-077-03, Increased Radiation Levels in Auxiliary Bldg Discovered.Caused by Crack in Welded Pipe Connection Joining Two 1A Degassifier Recovery Hx.Crack Due to Thermal Stress Fatigue + (Increased Radiation Levels in Auxiliary Bldg Discovered.Caused by Crack in Welded Pipe Connection Joining Two 1A Degassifier Recovery Hx.Crack Due to Thermal Stress Fatigue)
- ML18088B190 + (Increased Water Hole Peaking in Operating Reactors)
- ML19322B150 + (Increases Funding for Consulting Contract Due to Addl Review of Underwater Weir Per AEC 661222 & s)
- ENS 49290 + (Increasing Background Noise in Stack Radiation Monitor Renders It Non-Functional)
- ML070360219 + (Increasing U.S. Representation from NRC on the IAEA Staff)
- ML20203M999 + (Incredible Tale of Texasgulf Cane Creek Number 7 Well & Anisotropic Extension Fracture Permeability,Paradox Basin, Ut)
- ML19320D395 + (Increment of Analysis,Estimated Airbourne Release of Pu from Exxon Nuclear Mixed Oxide Fuel Plant at Richland,Wa as Result of Postulated Damage from Severe Wind & Earthquake Hazard)
- ML19320B050 + (Increment of Analysis:Estimated Airborne Release of Pu from Exxon Nuclear Mixed Oxide Fuel Plant at Richland,Wa as Result of Postulated Damage from Severe Wind & Earthquake Hazard)
- ML24132A009 + (Incremental Extension of Burnup Limit for Westinghouse and Combustion Engineering Fuel Designs)
- ML19254E800 + (Incremental Risk Assessment of Performance of Nonsafety- Grade Equipment Subjected to Adverse Environ)
- ML14304A629 + (Incs Motion for Leave to File Amicus Curiae Brief)
- ML18173A053 + (Ind. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Sig. Hazards .)
- 05000286/LER-2011-005, Indain Point, Unit 3 Regarding Automatic Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps Due to Undervoltage on 480 Vac Vital Buses Due to a Loss of Offsite Power During a Severe Storm + (Indain Point, Unit 3 Regarding Automatic Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps Due to Undervoltage on 480 Vac Vital Buses Due to a Loss of Offsite Power During a Severe Storm)
- ML070510069 + (Indeck Energy Services, 50 MW Gas Turbine Combined Cycle Cogeneration Facility)
- LIC-12-0016, Indefinite Delay in Extended Power Uprate for Fort Calhoun Station, Unit No. 1 + (Indefinite Delay in Extended Power Uprate for Fort Calhoun Station, Unit No. 1)
- ML16293A251 + (Indemnity Agreement Amendment 9)
- ML19308E235 + (Indemnity Agreement B-54)
- ML102430361 + (Indemnity Agreement B-59, Amendment No. 14)
- ML15175A141 + (Indemnity Agreement B-62)
- ML20353A162 + (Indemnity Agreement B-64, Amendment 15)
- ML20353A177 + (Indemnity Agreement B-64, Amendment 15 (2))
- ML20353A183 + (Indemnity Agreement B-64, Amendment 15 (3))
- ML20062A893 + (Indemnity Agreement B-84)
- ML20062F738 + (Indemnity Agreement B-86 Between Sceg,Sc Pub Svc Auth, & NRC Describing Amount of Financial Protec, & Location of Licensee)
- ML19296B068 + (Indemnity Agreement B-89 Between NRC & Tva,Excecuted by NRC)
- ML25266A222 + (Indemnity Agreement No. B-11 Amendment 25)
- ML24046A092 + (Indemnity Agreement No. B-11 Amendment No. 24)
- ML18320A239 + (Indemnity Agreement No. B-41 and Amendments)
- ML18057B136 + (Indemnity Agreement No. B-46)
- ML18057B134 + (Indemnity Agreement No. B-46 for Turkey Point)