Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20044G962 + (Implementation of Policy & Guidance Directive FC-86-2,Rev 1, Processing Matl License Application Involving Change of Ownership)
- RIS 2007-20, Implementation of Primary-To-Secondary Leakage Performance Criteria + (Implementation of Primary-To-Secondary Leakage Performance Criteria)
- ML23318A516 + (Implementation of Provisions from Consultations Under Section 106 of the National Historic Preservation Act on the Kairos Hermes Test Reactor CP Review)
- ML21012A092 + (Implementation of QA Criteria and 10 CFR 50.59 for Nuclear Power Plant Components Produced Using Advanced Manufacturing Technologies)
- ML21155A043 + (Implementation of QA Criteria and 10 CFR 50.59 for Nuclear Power Plant Components Produced Using AMTs - Enclosure)
- ML21200A222 + (Implementation of Quality Assurance Criteria and 10 CFR 50.59 for Nuclear Power Plant Components Produced Using Advanced Manufacturing Technologies (AMT Regulatory Basis Document), AMT Action Plan, Revision 1, Subtask 2a - Memo)
- RNP-RA/02-0031, Implementation of Recommendations for Irradiated Reactor Fuel Shipment + (Implementation of Recommendations for Irradiated Reactor Fuel Shipment)
- ULNRC-05659, Implementation of Requirements of 10 CFR Part 26, Subpart I + (Implementation of Requirements of 10 CFR Part 26, Subpart I)
- ML20106F226 + (Implementation of Resident Inspector Coverage at Category I Fuel Facilities During COVID-19)
- ML20097E538 + (Implementation of Resident Inspector Site Coverage During COVID19)
- Information Notice 1988-78, Implementation of Revised NRC-Administered Requalification Examinations + (Implementation of Revised NRC-Administered Requalification Examinations)
- ML20154A160 + (Implementation of Steam Generator Low Low Level Reactor Trip Time Delay & Environ Allowance Modifier in Callaway Plant)
- ML15324A293 + (Implementation of TB 15-1 R1 and Unlikely Loss of Both RWSTs at NAPS---E-mail)
- ML15324A302 + (Implementation of TB 15-1 R1 and Unlikely Loss of Both RWSTs at NAPS)
- ML20034F284 + (Implementation of TSTF-564 - NRC Conference Call - February 5, 2020)
- JAFP-02-0159, Implementation of Technical Specification Amendment No. 274 (Improved Technical Specifications) from James A. FitzPatrick + (Implementation of Technical Specification Amendment No. 274 (Improved Technical Specifications) from James A. FitzPatrick)
- ML082700861 + (Implementation of Tier 2 Restrictions Proposed License Amendment Request One-Time Risk-Informed Extension to the Completion Time for EDG Fuel Oil Storage Tank Recoating)
- ML110660285 + (Implementation of Travelers TSTF-363, Revision 0, Revise Topical Report References in Its 5.6.5, COLR (Core Operating Limits Report), TSTF-408, Revision 1, Relocation of LTOP (Low-Temperature Overpressure Protection) Enable Temperature)
- 05000458/FIN-2012009-05 + (Implementation of Vendor and Industry Recommended Relay Testing and Maintenance)
- RC-17-0088, Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times - Response to Request for Additional Information + (Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times - Response to Request for Additional Information)
- 05000261/FIN-2007501-01 + (Implementation of a Change in Rev. 8 of the EAL-1 Flow Chart which Decreased the Effectiveness of the Emergency Plan)
- 05000261/FIN-2004005-01 + (Implementation of a Change to EAL-2 Which Decreased the Effectiveness of the Emergency Plan, Rev. 54)
- 05000269/FIN-2005003-02 + (Implementation of a Change to Emergency Action Level 4.7.U.2.1 which Decreased the Effectiveness of the Emergency Plan)
- 05000461/FIN-2009502-01 + (Implementation of a Change which Decreased the Effectiveness of the Emergency Plan)
- Information Notice 2010-10, Implementation of a Digital Control System Under 10 CFR 50.59 + (Implementation of a Digital Control System Under 10 CFR 50.59)
- RA-15-0050, Implementation of a Duke Energy Common Quality Assurance Topical Report + (Implementation of a Duke Energy Common Quality Assurance Topical Report)
- Information Notice 1997-04, Implementation of a New Constraint on Radioactive Air Effluents + (Implementation of a New Constraint on Radioactive Air Effluents)
- ML101160106 + (Implementation of a Revised Review Process for Topical Reports)
- ML043080161 + (Implementation of a Risk-Informed Inservice Inspection Program)
- ET 03-0006, Implementation of the ASME Code for Operation and Maintenance of Nuclear Power Plants, Regarding the Check Valve Monitoring Program + (Implementation of the ASME Code for Operation and Maintenance of Nuclear Power Plants, Regarding the Check Valve Monitoring Program)
- Information Notice 1992-37, Implementation of the Deliberate Misconduct Rule + (Implementation of the Deliberate Misconduct Rule)
- ML071270581 + (Implementation of the Dominion Statistical DNBR Methodology with VIPRE-D/WRB-1)
- PMNS20210547, Implementation of the FBI Record of Arrest and Prosecution Program at Us Nuclear Plants + (Implementation of the FBI Record of Arrest and Prosecution Program at Us Nuclear Plants)
- ML23285A306 + (Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant)
- ML030920460 + (Implementation of the Performance Demonstration Methods Supplement Ten (10) - Qualification Requirements for Dissimilar Metal Piping Welds)
- ML032731158 + (Implementation of the Performance Demonstration Methods Supplement Ten (10) - Qualification Requirements for Dissimilar Metal Piping Welds)
- ML023600380 + (Implementation of the Performance Demonstration Methods Supplement Ten (10) - Qualification Requirements for Dissimilar Metal Piping Welds)
- ML030580427 + (Implementation of the Performance Demonstration Methods Supplement Ten (10) - Qualification Requirements for Dissimilar Metal Piping Welds)
- ML030930361 + (Implementation of the Performance Demonstration Methods Supplement Ten (10) - Qualification Requirements for Dissimilar Metal Piping Welds)
- GO2-03-185, Implementation of the Performance Demonstration Methods Supplement Ten (10) Qualification Requirements for Dissimilar Metal Welds + (Implementation of the Performance Demonstration Methods Supplement Ten (10) Qualification Requirements for Dissimilar Metal Welds)
- 05000458/FIN-2012009-03 + (Implementation of the Procedure for Infrequently Performed Tests or Evolutions)
- 05000373/FIN-2010005-06 + (Implementation of the Racklife computer model to monitor Unit 2 spent fuel pool storage racks degradation)
- Information Notice 2025-02, Implementation of the Real Id Act of 2005 and Considerations for NRC Nuclear Power Plant Licensees + (Implementation of the Real Id Act of 2005 and Considerations for NRC Nuclear Power Plant Licensees)
- ML16204A198 + (Implementation of the Regulatory Review Group Recommendations)
- ML071080338 + (Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses)
- RIS 2007-16, Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses + (Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses)
- ML16274A222 + (Implementation of the Safety Goal Policy)
- ML16245A292 + (Implementation of the Safety Goal Policy)
- 05000458/FIN-2012009-06 + (Implementation of the Station Cable Reliability Program)
- ML061000539 + (Implementation of the Stormwater Pollution Prevention Plan (Swppp) Procedure 36002-E Rev 1.1)
- ML20134E275 + (Implementations of Brown & Root QA Program at South Texas Project Jobsite)