Implementation of Tier 2 Restrictions Proposed License Amendment Request One-Time Risk-Informed Extension to the Completion Time for EDG Fuel Oil Storage Tank Recoating
ML082700861
Person / Time
Site: North Anna  
Issue date: 09/26/2008
From: Price J
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
08-0571
Download: ML082700861 (3)


Text

10 CFR 50.90 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 26, 2008 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No.

08-0571 NL&OS/ETS RO Docket Nos. 50-338/339 License Nos. NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2 IMPLEMENTATION OF TIER 2 RESTRICTIONS PROPOSED LICENSE AMENDMENT REQUEST ONE-TIME RISK-INFORMED EXTENSION TO THE COMPLETION TIME FOR EDG FUEL OIL STORAGE TANK RECOATING In a December 17, 2007 letter as supplemented on July 22, 2008 (Serial Nos. 07-0803 and 08-0388), Dominion requested amendments, in the form of changes to the Technical Specifications to Facility Operating License Numbers NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2.

The proposed change will permit a one-time extended 14-day Completion Time for each of the two underground diesel fuel oil storage tanks to permit removal of the current coating and recoating of the tanks in preparation for use of ultra-low sulfur diesel (ULSD) fuel oil.

In a September 10, 2008 e-mail from Ms. Donna Wright of the NRC to Mr. Thomas Shaub of Dominion, the NRC requested that Dominion commit to implement the Tier 2 restrictions noted in Table 5 of the risk analysis included in our December 17, 2007 letter. These Tier 2 restrictions are necessary to implement the EDG fuel oil tank outages consistent with the assumptions in the risk analysis. To ensure that the risk assessment assumptions remain valid for the extended EDG fuel oil tank Completion Time, Dominion will implement the Tier 2 restrictions for each entry into the extended Completion Time for cleaning and recoating the EDG fuel oil tanks.

The information provided in this letter does not affect the conclusion of the significant hazards consideration discussion provided in the December 17, 2007 Dominion letter (Serial No. 07-0803).

Serial No. 08-0571 Docket Nos. 50-338/339 Implementation of Tier Two Restrictions EDG FO Storage Tank Completion Time Extension Page 2 of 3 Should you have any questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.

Very truly yours, J' AI n Price ic President - Nuclear Engineering COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO GINGER LYNN AlliGOOD Notlry Public Common**llth of Vlrglnll 310847

~~~~~-=~:a~-J-~M~Y ~CO~~i~S~~~~~ires Apr 30. 2009 My Commission Expires:

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. Alan Price, who is Vice President - Nuclear Engineering, of Virginia Electric and Power Company.

He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this~ day of ~b-u.. 2008.

4}~)QJ)Oq Commitments made in this letter:

Dominion will implement the Tier 2 restrictions noted in Table 5 of the risk analysis Included in our December 17, 2007 letter with each entry into the extended Completion Time for cleaning and recoating the EDG fuel oil tanks.

cc:

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060 State Health Commissioner Virginia Department of Health James Madison Building - i h floor 109 Governor Street Suite 730 Richmond, Virginia 23219 NRC Senior Resident Inspector North Anna Power Station Ms. D. N. Wright NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0-8 H4A 11555 Rockville Pike Rockville, Maryland 20852 Mr. J. F. Stang, Jr.

NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852 Serial No. 08-0571 Docket Nos. 50-338/339 Implementation of Tier Two Restrictions EDG FO Storage Tank Completion Time Extension Page 3 of 3