Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000184/2009202 + (IR 50000184-09-202, on 07/27/09 - 07/29/09, National Institute of Standards and Technology Routine Inspection Report)
- IR 05000020/2015202 + (IR 5000020/2015-202; 03/16-19/2015; Massachusetts Institute of Technology - NRC Routine Inspection Report)
- IR 05000607/2009203 + (IR 50000607-09-203, on 08/12/09 & 08/13/09 for University of California-Davis)
- IR 05000113/2009202 + (IR 5000113-09-202, on 03/09/2009 - 03/12/2009, for University of Arizona Nuclear Reactor Laboratory)
- IR 05000089/2008201 + (IR 5000163-08-201, & 5000089-08-201, on 06/17/2008 - 06/19/2008, for Triga Reactor Facility)
- IR 05000264/2010202 + (IR 5000264-10-202, on 06/22/2010 - 06/23/2010, for Dow Chemical Company, Security Inspection)
- ML081230554 + (IR 5000275-08-007 and 05000323-08-007, on 04/29/2008, Diablo Canyon Power Plant - Site-Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Draft Temporary Instruction Inspection)
- IR 05000321/2010005 + (IR 5000321-10-005, 05000366-10-005, 05000321-10-501 & 05000366-10-501, on 10/01/2010 - 12/31/2010, Edwin I. Hatch, Integrated Inspection Report)
- IR 05000334/2013003 + (IR 5000334-2013003 and 5000412-2013003, 04-01-2013 - 06-30-2013, Beaver Valley Power Station - NRC Integrated Inspection Report)
- IR 05000445/2012404 + (IR 5000445-12-404 & 05000446--12-404, on 01/12/2012, Comanche Peak Nuclear Power Plant-NRC Security)
- ML12184A325 + (IR 5000482-12-004, on 08/20-08/31/2012, Wolf Creek Generating Station- Notification of Inspection and Request for Information)
- ML052580617 + (IR 50456457-05-008, Braidwood Requalification Program Inspection Plan (IP 71111.11B))
- ML070600240 + (IR 553792-03 Torus Structural Integrity Basis from 1R21 Inspections - Draft)
- ML110030695 + (IR 70-1257-10-010 & Notice of Violation, on 11/18/10, Areva Np, Inc., Richland)
- IR 07100018/2018201 + (IR 71-00018/2018-201, February 13-14, 2018, at Norcross, Ga, NRC Form 591S, Safety Inspection Report and Compliance Inspection, Inspectors Notes and Cover Sheet (Docket No.: 071-00018))
- IR 07100170/2019201 + (IR 71-00170/2019-201, May 6-10, 2019, at Sunsol, CA NRC Form 591S, Safety Inspection Report and Compliance Inspection, Inspectors Notes and Cover Sheet (Docket Number: 71-0170))
- IR 07100952/2018201 + (IR 71-00952/2018-201, February 21-22, 2018, at Roanoke, VA, NRC Form 591S, Safety Inspection Report and Compliance Inspection, Inspectors Notes and Cover Sheet (Docket No. 07100952))
- ML19084A071 + (IR 71-09342/2019-201, February 4-7, 2019 at Container Products Corporation Wilmington, Nc 28405, Inspectors Notes and Cover Sheet (Docket No. 71-9342))
- ML22034A799 + (IR 8 Baseline Inspection Completion)
- ML26042A095 + (IR 8 Baseline Inspection Completion Contingency Response - FOF Testing Power Reactors)
- ML20034E477 + (IR 80-33)
- ML20034E481 + (IR 83-27 - Refers to 83-20)
- ML20034E482 + (IR 86-12 Contam Pipe)
- ML20034E484 + (IR 86-21)
- ML20034E485 + (IR 88-23)
- ML20034E486 + (IR 88-26)
- ML20034E490 + (IR 89-15 Follow Up to 88-23)
- ML20034E491 + (IR 89-23 Some Follow Up)
- ML103620633 + (IR 99990001-10-004, on 11/22/10, QSA Global, Inc., Burlington, Ma; Cover Letter Dtd December 22, 2010)
- IR 05000334/2002301 + (IR Beaver Valley Unit 1 Reactor Operator & Senior Reactor Operator Initial Examination Report No. 50-334/02-301)
- IR 05000318/2004301 + (IR Calvert Cliffs, Units 1 & 2, Operator and Senior Reactor Operator Initial Examination Report No. 05/000317/2004301 and 05000318/2004301)
- ML063040661 + (IR Dresden 2006-010 Attachment 3)
- IR 05000293/2002301 + (IR Exam Report 50-293/02-301; July 26 - August 2, 2002; Pilgrim Nuclear Power Station; Initial Operator Licensing Examination Report. Seven of Seven Applicants (3 ROs and 4 SRO Instants) Passed the Examination)
- IR 05000286/2004301 + (IR Indian Point Station Operator and Senior Reactor Operator Initial Examination Report No. 05000286/2004301)
- IR 05000352/2002302 + (IR Limerick Generating Station Reactor Operator and Senior Reactor Operator Initial Examination Report No. 50-352/02-302; 50-353/02-302)
- IR 05000336/2003302 + (IR Millstone Unit 2 Senior Reactor Operator Initial Examination Rpt. No. 05000336/03-302 Dtd 11/12/2003)
- ML033160484 + (IR Millstone Unit 2 Senior Reactor Operator Initial Examination Report No. 05000336/2003-302)
- IR 05000410/2002303 + (IR Nine Mile Point 2 Senior Reactor Operator Initial Retake Examination Report No. 50-410/02-303 Dtd 12/18/02)
- ML023460494 + (IR Nine Mile Point Unit 1 Operator and Senior Reactor Operator Initial Examination Report No. 50-220/02-302 Dtd 12/12/02)
- IR 05000182/2008202 + (IR No. 05000182-08-202, Purdue University Research Reactor Facility, NRC Security Inspection Conducted on 06/02-05/2008)
- IR 05000277/2002302 + (IR Peach Bottom, Units 1 and 2, Reactor Operator and Senior Reactor Operator Initial Examination Report No. 50-277/02-302; 50-278/02-302 Dtd 11/6/02)
- IR 05000293/2003301 + (IR Pilgrim Nuclear Power Station Operator and Senior Reactor Operator Initial Examination Report No. 05000293/2003-301, Dtd 11/18/03)
- ML092580151 + (IR Point Beach 2009-404, OUO Cover Letter Banano)
- ML19112A203 + (IR Reactive 03002271/2019001(DNMS) Washington University in St. Louis)
- IR 05000354/2003301 + (IR Report No. 50-354/03-301dtd 5/20/03)
- IR 05000272/2002301 + (IR Salem, Units 1 & 2 - Operator and Senior Reactor Operator Initial Exam Rep No. 50-272/02-301 & 50-311/02-301 Dtd 12/12/02)
- IR 05000443/2003301 + (IR Seabrook Station Operator and Senior Reactor Operator Initial Examination Report No. 50-443/03-301)
- IR 05000443/2004301 + (IR Seabrook Station, Senior Reactor Operator Retake Examination Report No. 05000443/04-301 Dtd 1/20/04)
- IR 05000387/2003301 + (IR Susquehanna, Units 1 and 2 Station Operator and Senior Reactor Operator Initial Examination Report 05000387/03-301 and 05000388/03-301)
- IR 05000271/2003301 + (IR Vermont Yankee Nuclear Power Station Operator and Senior Reactor Operator Initial Examination Report No. 50-271/03-301)
- IR 05000271/2002301 + (IR Vermont Yankee Senior Reactor Operator Upgrade Initial Operator Examination Report No. 50-271/02-301)