ML081230554
| ML081230554 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/01/2008 |
| From: | Ryan Lantz Operations Branch IV |
| To: | Conway J Pacific Gas & Electric Co |
| References | |
| IR-08-007 | |
| Download: ML081230554 (3) | |
See also: IR 05000275/2008007
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
May 1, 2008
Mr. John T. Conway
Senior Vice President and Chief Nuclear Officer
Pacific Gas and Electric Company
P.O. Box 3
Mail Code B32
San Francisco, CA 94177-0001
SUBJECT:
DIABLO CANYON POWER PLANT - SITE-SPECIFIC IMPLEMENTATION
OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES DRAFT
TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION
REPORT 05000275/2008007 AND 05000323/2008007)
Dear Mr. Conway:
In a telephone conversation on April 29, 2008, Messrs. Steven Hamilton and John Kirkland
made arrangements for the NRC to inspect the site-specific implementation of B.5.b Phase 2
and 3 mitigating strategies at the Diablo Canyon Power Plant. The inspection is planned for the
week of June 16, 2008.
In order for the NRC to adequately prepare for this inspection, please furnish the documents
listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than May 23, 2008.
Please have available on site at the beginning of the inspection the arrangements and
documents listed in Enclosure 2. Mr. Steven Hamilton has been advised of this request and
provided with the name and address of the NRC lead inspector and the Office of Nuclear
Reactor Regulation inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0018, which expires on June 30, 2009.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, and completing and reviewing the collection of information. Send comments on any
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON I V
611 RYAN PLAZA DRIV E, SUITE 400
ARLINGTON, TEXAS 76011-4005
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Pacific Gas and Electric Company
- 2 -
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission,
Washington, D.C. 20555-0001, or by Internet electronic mail at margie.janney@nrc.gov; and to
the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, D.C. 20503-0001.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However,
because of the sensitive information contained in the enclosures, and in accordance with
10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.
Thank you for your cooperation in this matter. If you have any questions regarding this
inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159.
Sincerely,
/RA/
Ryan E. Lantz, Chief
Operations Branch
Division of Reactor Safety
Dockets: 50-275; 50-323
Enclosures:
1.
Documentation Requested
Prior to the Inspection
2.
Arrangements/Documents Requested
To Be Available Onsite during the
Inspection Week
cc w/enclosure:
Steven Hamilton
Diablo Canyon Operations and
Station Director, Pacific Gas and
Electric Company
Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, CA 93424
cc w/o enclosure:
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Pacific Gas and Electric Company
- 3 -
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
James R. Becker, Vice President
Diablo Canyon Operations and
Station Director, Pacific Gas and
Electric Company
Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, CA 93424
Jennifer Post, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, CA 94120