ML22034A799

From kanterella
Jump to navigation Jump to search
IR 8 Baseline Inspection Completion
ML22034A799
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/31/2022
From:
NRC Region 4
To:
Shared Package
ML22034A797 List:
References
Download: ML22034A799 (24)


Text

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 1 of 24 Region No: 4 Site: Arkansas Nuclear One (ANO)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 3

2 100% Complete C

71111.04 BI Equipment Alignment Annually 14 14 100% Complete C

71111.05 BI Fire Protection Annually 17 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 3

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 2

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 0

3 Not Applicable NA 71111.08P BI Inservice Inspection Activities (PWR)

Biennial 2

1 100% Complete C

71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 2

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 1

1 100% Complete C

71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 9

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 9

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 14 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 21 19 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 0

18 Not Applicable NA 71111.18 BI Plant Modifications Annually 6

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 20 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 2

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 16 9

100% Complete C

71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 0

8 0%

Complete*

C4 71111.21N.05 BI FPTI Triennial 0

5 Not Applicable NA 71111.22 BI Surveillance Testing Annually 21 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 1

1 100% Complete C

71114.02 EP Alert and Notification System Testing Biennial 0

1 0%

Complete*

C4 71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 0

1 0%

Complete*

C4 71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 0

1 0%

Complete*

C4 71114.06 EP Drill Evaluation Annually 3

3 100% Complete C

71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 1

1 100% Complete C

71124.01 BI Rad Haz Assess Exposure Controls Annually 13 10 100% Complete C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 2 of 24 71124.02 BI Occupational ALARA Biennial 9

9 67%

Complete*

C 71124.03 BI Airborne Radioactivity Biennial 6

4 100% Complete C

71124.04 BI Occupational Dose Assessment Biennial 7

4 100% Complete C

71124.05 BI Radiation Monitoring Instrumentation Biennial 0

17 0%

Complete*

C4 71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 0%

Complete*

C4 71124.07 BI Radiological Environmental Monitoring Program Triennial 0

3 0%

Complete*

C4 71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 0%

Complete*

C4 71151 BI Performance Indicator Verification Annually 24 24 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 7

6 100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 1

1 100% Complete C

71153 BI Follow Up of Events and NOED Annually 4

5 80%

Complete*

C Site Totals:

282

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 3 of 24 Region No: 4 Site: Callaway (CALL)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 4

2 100% Complete C

71111.04 BI Equipment Alignment Annually 15 14 100% Complete C

71111.05 BI Fire Protection Annually 19 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 3

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 1

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 4

3 67%

Complete*

C3 71111.08P BI Inservice Inspection Activities (PWR)

Biennial 0

1 0%

Complete*

C4 71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 1

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 1

1 100% Complete C

71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 8

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 9

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 15 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 15 15 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 30 18 100% Complete C

71111.18 BI Plant Modifications Annually 3

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 20 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 1

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 0

9 0%

Complete*

C4 71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable NA 71111.21N.05 BI FPTI Triennial 0

5 Not Applicable NA 71111.22 BI Surveillance Testing Annually 17 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 1

1 100% Complete C

71114.02 EP Alert and Notification System Testing Biennial 0

1 0%

Complete*

C4 71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 0

1 0%

Complete*

C4 71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 0

1 0%

Complete*

C4 71114.06 EP Drill Evaluation Annually 3

3 100% Complete C

71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 1

1 100% Complete C

71124.01 BI Rad Haz Assess Exposure Controls Annually 17 10 100% Complete C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 4 of 24 71124.02 BI Occupational ALARA Biennial 6

9 33%

Complete*

C 71124.03 BI Airborne Radioactivity Biennial 4

4 75%

Complete*

C 71124.04 BI Occupational Dose Assessment Biennial 0

4 0%

Complete*

C4 71124.05 BI Radiation Monitoring Instrumentation Biennial 22 17 100% Complete C

71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable NA 71124.07 BI Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable NA 71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 12 8

100% Complete C

71151 BI Performance Indicator Verification Annually 14 13 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 7

6 100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 0

1 0%

Complete*

C4 71153 BI Follow Up of Events and NOED Annually 6

5 60%

Complete*

C Site Totals:

267

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 5 of 24 Region No: 4 Site: Columbia Generating Station (WNP)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 4

2 100% Complete C

71111.04 BI Equipment Alignment Annually 16 14 100% Complete C

71111.05 BI Fire Protection Annually 21 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 3

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 1

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 4

3 33%

Complete*

C 71111.08G BI Inservice Inspection Activities (BWR)

Biennial 1

1 100% Complete C

71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 0

1 0%

Complete*

C3 71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 1

1 100% Complete C

71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 8

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 9

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 19 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 20 15 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 0

18 0%

Complete*

C4 71111.18 BI Plant Modifications Annually 4

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 21 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 2

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 0

9 Not Applicable NA 71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 12 8

100% Complete C

71111.21N.05 BI FPTI Triennial 8

5 100% Complete C

71111.22 BI Surveillance Testing Annually 18 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 1

1 100% Complete C

71114.02 EP Alert and Notification System Testing Biennial 0

1 0%

Complete*

C4 71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 0

1 0%

Complete*

C4 71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 0

1 0%

Complete*

C4 71114.06 EP Drill Evaluation Annually 3

3 67%

Complete*

C 71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 0

1 0%

Complete*

C4 71124.01 BI Rad Haz Assess Exposure Controls Annually 13 10 100% Complete C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 6 of 24 71124.02 BI Occupational ALARA Biennial 5

9 33%

Complete*

C 71124.03 BI Airborne Radioactivity Biennial 6

4 100% Complete C

71124.04 BI Occupational Dose Assessment Biennial 0

4 0%

Complete*

C4 71124.05 BI Radiation Monitoring Instrumentation Biennial 27 17 100% Complete C

71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 9

9 89%

Complete*

C 71124.07 BI Radiological Environmental Monitoring Program Triennial 3

3 100% Complete C

71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 13 8

100% Complete C

71151 BI Performance Indicator Verification Annually 13 13 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 9

6 100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 1

1 100% Complete C

71153 BI Follow Up of Events and NOED Annually 2

5 40%

Complete*

C Site Totals:

267

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 7 of 24 Region No: 4 Site: Comanche Peak (CP)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 3

2 100% Complete C

71111.04 BI Equipment Alignment Annually 17 14 100% Complete C

71111.05 BI Fire Protection Annually 19 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 3

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 1

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 0

3 Not Applicable NA 71111.08P BI Inservice Inspection Activities (PWR)

Biennial 1

1 100% Complete C4 71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 1

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 0

1 0%

Complete*

C4 71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 9

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 8

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 17 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 20 19 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 0

18 Not Applicable NA 71111.18 BI Plant Modifications Annually 3

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 22 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 2

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 17 9

100% Complete C

71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 0

8 0%

Complete*

C4 71111.21N.05 BI FPTI Triennial 4

5 60%

Complete*

C4 71111.22 BI Surveillance Testing Annually 15 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 0

1 0%

Complete*

C3 71114.02 EP Alert and Notification System Testing Biennial 0

1 0%

Complete*

C4 71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 0

1 0%

Complete*

C4 71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 0

1 0%

Complete*

C4 71114.06 EP Drill Evaluation Annually 3

3 33%

Complete*

C 71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 0

1 0%

Complete*

C3 71124.01 BI Rad Haz Assess Exposure Controls Annually 13 10 100% Complete C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 8 of 24 71124.02 BI Occupational ALARA Biennial 13 9

100% Complete C

71124.03 BI Airborne Radioactivity Biennial 0

4 0%

Complete*

C4 71124.04 BI Occupational Dose Assessment Biennial 7

4 100% Complete C

71124.05 BI Radiation Monitoring Instrumentation Biennial 0

17 0%

Complete*

C4 71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 0%

Complete*

C4 71124.07 BI Radiological Environmental Monitoring Program Triennial 0

3 0%

Complete*

C4 71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 0%

Complete*

C4 71151 BI Performance Indicator Verification Annually 24 24 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 9

6 100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 1

1 100% Complete C

71153 BI Follow Up of Events and NOED Annually 4

5 20%

Complete*

C2 Site Totals:

282

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 9 of 24 Region No: 4 Site: Cooper (CNS)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 4

2 100% Complete C

71111.04 BI Equipment Alignment Annually 16 14 100% Complete C

71111.05 BI Fire Protection Annually 21 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 3

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 1

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 0

3 Not Applicable NA 71111.08G BI Inservice Inspection Activities (BWR)

Biennial 0

1 0%

Complete*

C4 71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 1

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 1

1 100% Complete C

71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 8

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 9

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 19 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 18 15 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 0

18 Not Applicable NA 71111.18 BI Plant Modifications Annually 5

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 24 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 0

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 15 9

89%

Complete*

C 71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 0

8 0%

Complete*

C4 71111.21N.05 BI FPTI Triennial 0

5 Not Applicable NA 71111.22 BI Surveillance Testing Annually 18 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 1

1 100% Complete C

71114.02 EP Alert and Notification System Testing Biennial 1

1 100% Complete C

71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 1

1 100% Complete C

71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 3

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 1

1 100% Complete C

71114.06 EP Drill Evaluation Annually 3

3 100% Complete C

71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 0

1 0%

Complete*

C4 71124.01 BI Rad Haz Assess Exposure Controls Annually 11 10 100% Complete C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 10 of 24 71124.02 BI Occupational ALARA Biennial 0

9 0%

Complete*

C4 71124.03 BI Airborne Radioactivity Biennial 4

4 75%

Complete*

C3 71124.04 BI Occupational Dose Assessment Biennial 0

4 0%

Complete*

C4 71124.05 BI Radiation Monitoring Instrumentation Biennial 23 17 100% Complete C

71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable NA 71124.07 BI Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable NA 71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 14 8

100% Complete C

71151 BI Performance Indicator Verification Annually 13 13 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 9

6 100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 1

1 100% Complete C

71153 BI Follow Up of Events and NOED Annually 5

5 60%

Complete*

C Site Totals:

267

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 11 of 24 Region No: 4 Site: Diablo Canyon (DIAB)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 4

2 100% Complete C

71111.04 BI Equipment Alignment Annually 16 14 100% Complete C

71111.05 BI Fire Protection Annually 20 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 3

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 1

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 3

3 67%

Complete*

C 71111.08P BI Inservice Inspection Activities (PWR)

Biennial 1

1 100% Complete C4 71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 1

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 1

1 100% Complete C

71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 8

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 8

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 16 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 21 19 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 0

18 0%

Complete*

C4 71111.18 BI Plant Modifications Annually 5

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 21 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 1

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 0

9 Not Applicable NA 71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 11 8

100% Complete C

71111.21N.05 BI FPTI Triennial 8

5 100% Complete C

71111.22 BI Surveillance Testing Annually 18 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 1

1 100% Complete C

71114.02 EP Alert and Notification System Testing Biennial 0

1 0%

Complete*

C4 71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 0

1 0%

Complete*

C4 71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 0

1 0%

Complete*

C4 71114.06 EP Drill Evaluation Annually 3

3 100% Complete C

71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 1

1 100% Complete C

71124.01 BI Rad Haz Assess Exposure Controls Annually 13 10 100% Complete C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 12 of 24 71124.02 BI Occupational ALARA Biennial 12 9

100% Complete C

71124.03 BI Airborne Radioactivity Biennial 0

4 0%

Complete*

C4 71124.04 BI Occupational Dose Assessment Biennial 5

4 100% Complete C

71124.05 BI Radiation Monitoring Instrumentation Biennial 0

17 0%

Complete*

C4 71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 9

9 89%

Complete*

C 71124.07 BI Radiological Environmental Monitoring Program Triennial 3

3 100% Complete C

71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 0%

Complete*

C4 71151 BI Performance Indicator Verification Annually 24 24 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 6

6 100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 0

1 0%

Complete*

C4 71153 BI Follow Up of Events and NOED Annually 1

5 20%

Complete*

C Site Totals:

282

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 13 of 24 Region No: 4 Site: Grand Gulf (GG)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 5

2 100% Complete C

71111.04 BI Equipment Alignment Annually 16 14 100% Complete C

71111.05 BI Fire Protection Annually 22 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 4

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 1

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 4

3 67%

Complete*

C 71111.08G BI Inservice Inspection Activities (BWR)

Biennial 0

1 0%

Complete*

C4 71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 1

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 1

1 100% Complete C

71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 8

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 8

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 19 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 21 15 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 41 18 100% Complete C

71111.18 BI Plant Modifications Annually 5

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 24 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 1

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 0

9 0%

Complete*

C4 71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable NA 71111.21N.05 BI FPTI Triennial 4

5 60%

Complete*

C4 71111.22 BI Surveillance Testing Annually 17 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 1

1 100% Complete C

71114.02 EP Alert and Notification System Testing Biennial 0

1 0%

Complete*

C4 71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 0

1 0%

Complete*

C4 71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 0

1 0%

Complete*

C4 71114.06 EP Drill Evaluation Annually 3

3 100% Complete C

71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 1

1 100% Complete C

71124.01 BI Rad Haz Assess Exposure Controls Annually 12 10 90%

Complete*

C3

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 14 of 24 71124.02 BI Occupational ALARA Biennial 8

9 67%

Complete*

C 71124.03 BI Airborne Radioactivity Biennial 4

4 100% Complete C

71124.04 BI Occupational Dose Assessment Biennial 6

4 100% Complete C

71124.05 BI Radiation Monitoring Instrumentation Biennial 0

17 0%

Complete*

C4 71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 0%

Complete*

C4 71124.07 BI Radiological Environmental Monitoring Program Triennial 0

3 0%

Complete*

C4 71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 0%

Complete*

C4 71151 BI Performance Indicator Verification Annually 13 13 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 10 6

100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 0

1 0%

Complete*

C4 71153 BI Follow Up of Events and NOED Annually 12 5

100% Complete C

Site Totals:

267

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 15 of 24 Region No: 4 Site: Palo Verde (PALO)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 3

2 100% Complete C

71111.04 BI Equipment Alignment Annually 14 14 100% Complete C

71111.05 BI Fire Protection Annually 19 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 3

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 2

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 0

3 0%

Complete*

C4 71111.08P BI Inservice Inspection Activities (PWR)

Biennial 2

1 100% Complete C4 71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 1

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 0

1 0%

Complete*

C4 71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 8

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 8

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 14 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 23 22 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 0

18 0%

Complete*

C4 71111.18 BI Plant Modifications Annually 3

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 20 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 4

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 0

9 Not Applicable NA 71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 12 8

100% Complete C

71111.21N.05 BI FPTI Triennial 8

5 100% Complete C

71111.22 BI Surveillance Testing Annually 17 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 1

1 100% Complete C

71114.02 EP Alert and Notification System Testing Biennial 0

1 0%

Complete*

C4 71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 0

1 0%

Complete*

C4 71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 0

1 0%

Complete*

C4 71114.06 EP Drill Evaluation Annually 3

3 100% Complete C

71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 1

1 100% Complete C

71124.01 BI Rad Haz Assess Exposure Controls Annually 14 10 100% Complete C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 16 of 24 71124.02 BI Occupational ALARA Biennial 5

9 33%

Complete*

C 71124.03 BI Airborne Radioactivity Biennial 5

4 100% Complete C

71124.04 BI Occupational Dose Assessment Biennial 0

4 0%

Complete*

C4 71124.05 BI Radiation Monitoring Instrumentation Biennial 28 17 100% Complete C

71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable NA 71124.07 BI Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable NA 71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 13 8

88%

Complete*

C3 71151 BI Performance Indicator Verification Annually 35 35 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 6

6 100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 1

1 100% Complete C

71153 BI Follow Up of Events and NOED Annually 6

5 60%

Complete*

C Site Totals:

296

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 17 of 24 Region No: 4 Site: River Bend (RBS)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 5

2 100% Complete C

71111.04 BI Equipment Alignment Annually 16 14 100% Complete C

71111.05 BI Fire Protection Annually 21 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 4

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 1

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 4

3 33%

Complete*

C 71111.08G BI Inservice Inspection Activities (BWR)

Biennial 1

1 100% Complete C

71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 1

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 0

1 0%

Complete*

C4 71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 8

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 8

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 19 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 20 15 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 26 18 100% Complete C

71111.18 BI Plant Modifications Annually 5

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 24 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 2

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 0

9 0%

Complete*

C4 71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable NA 71111.21N.05 BI FPTI Triennial 0

5 Not Applicable NA 71111.22 BI Surveillance Testing Annually 18 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 1

1 100% Complete C

71114.02 EP Alert and Notification System Testing Biennial 1

1 100% Complete C

71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 1

1 100% Complete C

71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 1

1 100% Complete C

71114.06 EP Drill Evaluation Annually 3

3 100% Complete C

71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 0

1 0%

Complete*

C4 71124.01 BI Rad Haz Assess Exposure Controls Annually 13 10 100% Complete C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 18 of 24 71124.02 BI Occupational ALARA Biennial 4

9 33%

Complete*

C 71124.03 BI Airborne Radioactivity Biennial 4

4 100% Complete C

71124.04 BI Occupational Dose Assessment Biennial 0

4 0%

Complete*

C4 71124.05 BI Radiation Monitoring Instrumentation Biennial 26 17 100% Complete C

71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 12 9

89%

Complete*

C 71124.07 BI Radiological Environmental Monitoring Program Triennial 3

3 100% Complete C

71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 13 8

100% Complete C

71151 BI Performance Indicator Verification Annually 13 13 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 9

6 100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 1

1 100% Complete C

71153 BI Follow Up of Events and NOED Annually 5

5 80%

Complete*

C Site Totals:

267

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 19 of 24 Region No: 4 Site: South Texas Project (STP)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 5

2 100% Complete C

71111.04 BI Equipment Alignment Annually 16 14 100% Complete C

71111.05 BI Fire Protection Annually 22 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 4

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 1

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 0

3 0%

Complete*

C4 71111.08P BI Inservice Inspection Activities (PWR)

Biennial 2

1 100% Complete C4 71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 1

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 1

1 100% Complete C

71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 8

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 9

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 20 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 24 19 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 0

18 0%

Complete*

C4 71111.18 BI Plant Modifications Annually 5

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 24 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 2

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 0

9 Not Applicable NA 71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable NA 71111.21N.05 BI FPTI Triennial 0

5 0%

Complete*

C4 71111.22 BI Surveillance Testing Annually 18 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 2

1 100% Complete C

71114.02 EP Alert and Notification System Testing Biennial 0

1 0%

Complete*

C4 71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 0

1 0%

Complete*

C4 71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 0

1 0%

Complete*

C4 71114.06 EP Drill Evaluation Annually 4

3 100% Complete C

71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 1

1 100% Complete C

71124.01 BI Rad Haz Assess Exposure Controls Annually 15 10 100% Complete C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 20 of 24 71124.02 BI Occupational ALARA Biennial 8

9 67%

Complete*

C 71124.03 BI Airborne Radioactivity Biennial 5

4 100% Complete C

71124.04 BI Occupational Dose Assessment Biennial 6

4 100% Complete C

71124.05 BI Radiation Monitoring Instrumentation Biennial 1

17 6%

Complete*

C4 71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 10 9

89%

Complete*

C 71124.07 BI Radiological Environmental Monitoring Program Triennial 3

3 100% Complete C

71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 1

8 13%

Complete*

C4 71151 BI Performance Indicator Verification Annually 24 24 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 11 6

100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 0

1 0%

Complete*

C4 71153 BI Follow Up of Events and NOED Annually 3

5 60%

Complete*

C Site Totals:

282

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 21 of 24 Region No: 4 Site: Waterford (WAT)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 3

2 100% Complete C

71111.04 BI Equipment Alignment Annually 14 14 100% Complete C

71111.05 BI Fire Protection Annually 17 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 2

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 1

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 3

3 67%

Complete*

C 71111.08P BI Inservice Inspection Activities (PWR)

Biennial 0

1 0%

Complete*

C4 71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 1

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 1

1 100% Complete C

71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 8

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 8

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 14 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 16 15 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 21 18 100% Complete C

71111.18 BI Plant Modifications Annually 3

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 21 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 1

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 0

9 0%

Complete*

C4 71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable NA 71111.21N.05 BI FPTI Triennial 7

5 100% Complete C

71111.22 BI Surveillance Testing Annually 15 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 0

1 0%

Complete*

C3 71114.02 EP Alert and Notification System Testing Biennial 0

1 0%

Complete*

C4 71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 0

1 0%

Complete*

C4 71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 0

1 0%

Complete*

C4 71114.06 EP Drill Evaluation Annually 1

3 33%

Complete*

C3 71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 1

1 100% Complete C

71124.01 BI Rad Haz Assess Exposure Controls Annually 11 10 90%

Complete*

C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 22 of 24 71124.02 BI Occupational ALARA Biennial 14 9

100% Complete C

71124.03 BI Airborne Radioactivity Biennial 5

4 100% Complete C

71124.04 BI Occupational Dose Assessment Biennial 0

4 0%

Complete*

C4 71124.05 BI Radiation Monitoring Instrumentation Biennial 26 17 100% Complete C

71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable NA 71124.07 BI Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable NA 71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 13 8

100% Complete C

71151 BI Performance Indicator Verification Annually 13 13 100% Complete C

71151 EP Performance Indicator Verification Annually 3

3 100% Complete C

71152 BI Problem Identification and Resolution Annually 6

6 100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 0

1 0%

Complete*

C4 71153 BI Follow Up of Events and NOED Annually 5

5 80%

Complete*

C Site Totals:

267

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 23 of 24 Region No: 4 Site: Wolf Creek (WC)

Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note 71111.01 BI Adverse Weather Protection Annually 3

2 100% Complete C

71111.04 BI Equipment Alignment Annually 16 14 100% Complete C

71111.05 BI Fire Protection Annually 19 17 100% Complete C

71111.06 BI Flood Protection Measures Annually 3

2 100% Complete C

71111.07A BI Heat Sink Performance Annually 2

1 100% Complete C

71111.07SIX BI Heat Sink Performance Sexennial 0

1 Not Applicable NA 71111.07T BI Heat Sink Performance Triennial 0

3 Not Applicable NA 71111.08P BI Inservice Inspection Activities (PWR)

Biennial 1

1 100% Complete C

71111.11A BI Licensed Op Requal & Perform (Annual)

Annually 1

1 100% Complete C

71111.11B BI Licensed Op Requal & Perform (Biennial)

Biennial 0

1 0%

Complete*

C4 71111.11Q BI Licensed Op Requal & Perform (Quarterly)

Annually 9

8 100% Complete C

71111.12 BI Maintenance Effectiveness Annually 9

8 100% Complete C

71111.13 BI Maint Risk Assessments & Emer Wk Control Annually 19 14 100% Complete C

71111.15 BI Oper Determinations/Functionality Annually 18 15 100% Complete C

71111.17T BI Changes, Tests, and Experiments Triennial 0

18 Not Applicable NA 71111.18 BI Plant Modifications Annually 6

3 100% Complete C

71111.19 BI Post-Maintenance Testing Annually 24 20 100% Complete C

71111.20 BI Refueling and Other Outage Activities When required 2

0 0%

Complete C

71111.21M BI DBA (Teams)

Triennial 16 9

100% Complete C

71111.21N.02 BI DB POV Under 10 CFR 50.55a Triennial 0

8 0%

Complete*

C4 71111.21N.05 BI FPTI Triennial 0

5 0%

Complete*

C4 71111.22 BI Surveillance Testing Annually 17 14 100% Complete C

71114.01 EP Exercise Evaluation Biennial 0

1 0%

Complete*

C3 71114.02 EP Alert and Notification System Testing Biennial 0

1 0%

Complete*

C4 71114.03 EP Emergency Response Organizational Staffing/Augmentation Biennial 0

1 0%

Complete*

C4 71114.04 EP Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2

1 100% Complete C

71114.05 EP Maintenance of EP Biennial 0

1 0%

Complete*

C4 71114.06 EP Drill Evaluation Annually 3

3 100% Complete C

71114.07 EP Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable NA 71114.08 EP Exercise Evaluation Scenario Review Biennial 0

1 0%

Complete*

C3 71124.01 BI Rad Haz Assess Exposure Controls Annually 11 10 100% Complete C

IR Report 8 Baseline Inspection Completion with Certification Information By Site Inactive NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/31/2022 2:39:40 PM Page 24 of 24 71124.02 BI Occupational ALARA Biennial 14 9

100% Complete C

71124.03 BI Airborne Radioactivity Biennial 0

4 0%

Complete*

C4 71124.04 BI Occupational Dose Assessment Biennial 7

4 100% Complete C

71124.05 BI Radiation Monitoring Instrumentation Biennial 0

17 0%

Complete*

C4 71124.06 BI Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 0%

Complete*

C4 71124.07 BI Radiological Environmental Monitoring Program Triennial 0

3 0%

Complete*

C4 71124.08 BI Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 2

8 25%

Complete*

C4 71151 BI Performance Indicator Verification Annually 13 13 100% Complete C

71151 EP Performance Indicator Verification Annually 2

3 67%

Complete*

C3 71152 BI Problem Identification and Resolution Annually 8

6 100% Complete C

71152B BI Problem Identification and Resolution (Biennial)

Biennial 0

1 0%

Complete*

C4 71153 BI Follow Up of Events and NOED Annually 5

5 80%

Complete*

C Site Totals:

267 Region Totals:

3293 Report Totals:

3293