ML26042A095

From kanterella
Jump to navigation Jump to search
IR 8 Baseline Inspection Completion Contingency Response - FOF Testing Power Reactors
ML26042A095
Person / Time
Issue date: 02/17/2026
From: David Hostetter
Security Performance Evaluation Branch
To:
Shared Package
ML26041A238 List:
References
Download: ML26042A095 (0)


Text

IR Report 8 Baseline Inspection Completion with Certification Information By Procedure Data As Of 2/9/2026 4:45:05 AM Inactive NOTE: Biennial samples completed are the total of 2024 and 2025. Triennial samples completed are the total between 2023 and 2025. Quadrennial samples completed are the total between 2023 and 2026.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 2/9/2026 4:22:40 PM Page 1 of 2 Procedure: 71130.03

Title:

Contingency Response - FOF Testing IPE Code: SG Region Site IPC Frequency Sample Completed IMC Min Completion Sample Percent Status Note Certify Date / By 1 BV 2025 Triennial 1

1 100%

Complete C

06/25/2025 - Berry, Joshua K 1 CALV 2025 Triennial 1

1 100%

Complete C

02/03/2026 - Berry, Joshua K 1 GINN 2025 Triennial 1

1 100%

Complete C

12/09/2025 - Berry, Joshua K 2 BF 2025 Triennial 1

1 100%

Complete C

07/28/2025 - Berry, Joshua K 2 CAT 2025 Triennial 1

1 100%

Complete C

12/15/2025 - Worosilo, Jannette G 2 HAT 2025 Triennial 1

1 100%

Complete C

08/13/2025 - Berry, Joshua K 2 MCG 2025 Triennial 1

1 100%

Complete C

04/08/2025 - Berry, Joshua K 2 VOG 2025 Triennial 1

1 100%

Complete C

12/10/2025 - Alen Arias, Alejandro M 2 VOGAP1000 2025 Triennial 1

1 100%

Complete C

12/16/2025 - Alen Arias, Alejandro M 2 WB 2025 Triennial 1

1 100%

Complete C

05/20/2025 - Berry, Joshua K 3 BRAI 2025 Triennial 1

1 100%

Complete C

05/20/2025 - Berry, Joshua K 3 BYRO 2025 Triennial 1

1 100%

Complete C

02/03/2026 - Berry, Joshua K 3 DRES 2025 Triennial 1

1 100%

Complete C

05/20/2025 - Berry, Joshua K

IR Report 8 Baseline Inspection Completion with Certification Information By Procedure Data As Of 2/9/2026 4:45:05 AM Inactive NOTE: Biennial samples completed are the total of 2024 and 2025. Triennial samples completed are the total between 2023 and 2025. Quadrennial samples completed are the total between 2023 and 2026.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 2/9/2026 4:22:40 PM Page 2 of 2 3 FERM 2025 Triennial 1

1 100%

Complete C

12/30/2025 - Ng, Raymond M 3 PERR 2025 Triennial 1

1 100%

Complete C

11/25/2025 - Ng, Raymond M 4 CP 2025 Triennial 1

1 100%

Complete C

02/03/2026 - Berry, Joshua K 4 DIAB 2025 Triennial 1

1 100%

Complete C

02/25/2025 - Berry, Joshua K 4 PALO 2025 Triennial 1

1 100%

Complete C

05/01/2025 - Berry, Joshua K 4 RBS 2025 Triennial 0

1 0%

Incomplete IC 02/03/2026 - Berry, Joshua K Total:

18