Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20263H125 + (High Density Spent Fuel Storage Rack Super Module Assembly. Sheet 1 of 1)
- ML20263H152 + (High Density Spent Fuel Storage Rack Wall Seismic Restrainer Bracket Details. Sheet 1 of 1)
- ML20263H141 + (High Density Spent Fuel Storage Rack:Rack Seismic Restrainer Bracket Details. Sheet 1 of 2)
- ML20263H147 + (High Density Spent Fuel Storage Rack:Rack Seismic Restrainer Bracket Details. Sheet 2 of 2)
- ML20263H165 + (High Density Spent Fuel Storage Rack:Rack Leveling Tool. Sheet 1 of 1.Revision Date Illegible)
- ML20263H104 + (High Density Spent Fuel Storage Rack:Rack Assembly. Sheet 2 of 5)
- ML20263H102 + (High Density Spent Fuel Storage Rack:Rack Assembly. Sheet 4 of 5)
- ML20263H099 + (High Density Spent Fuel Storage Rack:Rack Assembly. Sheet 5 of 5)
- ML20263H094 + (High Density Spent Fuel Storage Racks:Rack Assembly. Sheet 3 of 5)
- ML20041G433 + (High Density Spent Fuel Storage Sys:Friction Tests Slider Pad Support Base Matls)
- ENS 40480 + (High Differential Pressure in Auxiliary Building)
- ENS 46264 + (High Dose Rate Afterloader Stuck / Exposed Source)
- ML19191A141 + (High Dose Rate Remote Afterloader Brachytherapy Devices Approved for Patient Treatment Using Sources Exceeding 10 Curies, Rev 2, July 9, 2019)
- Information Notice 2012-08, High Dose-Rate Remote Afterloader (HDR) Physical Presence Requirements + (High Dose-Rate Remote Afterloader (HDR) Physical Presence Requirements)
- ML20079N081 + (High Dryout Quality Film Boiling and Steam Cooling Heat Transfer Data from a Rod Bundle)
- Information Notice 2017-04, High Energy Arc Faults in Electrical Equipment Containing Aluminum Components + (High Energy Arc Faults in Electrical Equipment Containing Aluminum Components)
- ML22353A074 + (High Energy Arcing Fault Frequency and Consequence Modeling Comment Resolution)
- PMNS20190198, High Energy Arcing Fault Large-Scale Test Plan Comment Resolution + (High Energy Arcing Fault Large-Scale Test Plan Comment Resolution)
- PMNS20230276, High Energy Arcing Fault PRA Methodology Workshop + (High Energy Arcing Fault PRA Methodology Workshop)
- ML23150A023 + (High Energy Arcing Fault PRA Methodology Workshop Materials)
- ML22319A085 + (High Energy Arcing Faults (HEAF) - 11/16/22 Public Meeting Slides from NRC (LIC-504 Evaluation), Constellation, and Duke-Energy)
- ML21293A007 + (High Energy Arcing Faults (HEAF) Public Workshop (10/20/21) Presentation Slides by NRC, EPRI, NEI, and Duke-Energy (Revised))
- ML20056F126 + (High Energy Arcing Faults Involving Aluminum Components (February 20, 2020))
- ML22200A272 + (High Energy Arcing Faults LIC-504 Team Recommendations)
- ML22201A000 + (High Energy Arcing Faults LIC-504 Team Recommendations Memorandum)
- ML20263M120 + (High Energy Break List)
- ML23010A250 + (High Energy Line Break (HELB) - 1/11/23 Public Meeting Slides from NRC and Constellation for Risk-Informed Helb/Break Exclusion - NRC Slides)
- ML23010A248 + (High Energy Line Break (HELB) - 1/11/23 Public Meeting Slides from NRC and Constellation for Risk-Informed Helb/Break Exclusion - Industry Slides)
- ML23010A247 + (High Energy Line Break (HELB) - 1/11/23 Public Meeting Slides from NRC and Constellation for Risk-Informed Helb/Break Exclusion)
- ML041940419 + (High Energy Line Break (HELB) Outside Containment Project Update)
- ENS 39970 + (High Energy Line Break (Helb) Door Not Latched)
- ML13329A754 + (High Energy Line Break Analysis Inside & Outside Containment)
- ENS 44138 + (High Energy Line Break Analysis Revealed Potential Accident Mitigation Deficiency)
- ENS 46597 + (High Energy Line Break Analysis for Aux Steam to the Auxiliary Building)
- 05000301/FIN-2010005-04 + (High Energy Line Break Barrier Controls)
- ENS 49335 + (High Energy Line Break Barrier Improperly Obstructed)
- ENS 50836 + (High Energy Line Break Boundary Door Not Latching)
- ENS 51889 + (High Energy Line Break Door Discovered Open)
- ENS 50663 + (High Energy Line Break Door Found Closed)
- ENS 51460 + (High Energy Line Break Door Found Unlatched)
- 05000333/FIN-2009003-01 + (High Energy Line Break Door Missing Lower Support)
- ENS 50676 + (High Energy Line Break Isolation Door Inoperable)
- ML19302E051 + (High Energy Line Break License Amendment Public Meeting)
- 05000454/FIN-2011005-02 + (High Energy Line Break Operability Evaluation)
- ML053340283 + (High Energy Line Break and Tornado Mitigation Strategy)
- ML20084J820 + (High Energy Line Break/Control Sys Failure Analysis)
- ML20095H979 + (High Energy Line Break/Control Sys Failure Analysis)
- ML20066E803 + (High Energy Line Break/Control Sys Failure Analysis)
- ML20133A735 + (High Energy Line Break/Moderate Energy Line Break, Supplementary Review for Illinois Power Co)
- ML061380552 + (High Energy Line Break: Mitigation Strategy)
- ML19332D658 + (High Energy Line Breaks Outside Containment Input for Justification for Continued Operation)