Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22221A200 + (GEH Ntr TS Audit for License Renewal)
- M210030, GEH Ntr Written Report to EN 55113- Requalification Program Due Date Exceedance + (GEH Ntr Written Report to EN 55113- Requalification Program Due Date Exceedance)
- ML21069A292 + (GEH Ntr Written Report to EN 55113- Requalification Program Due Date Exceedance)
- ML13277A038 + (GEH Presentation on Methods Applicability to Areva Atrium 10XM Fuel)
- M180128, GEH Proposed Resolution of Item 10 - Gas Accumulation Locations - of NRC Suggested U.S. Advanced Boiling Water Reactor Design Changes - Supplemental Response + (GEH Proposed Resolution of Item #10 - Gas Accumulation Locations - of NRC Suggested U.S. Advanced Boiling Water Reactor Design Changes - Supplemental Response)
- ML18173A050 + (GEH Proposed Resolution of Item 10 - Gas Accumulation Locations - of NRC Suggested U.S. Advanced Boiling Water Reactor Design Changes - Supplemental Response)
- ML15254A042 + (GEH Proposed Resolution of Item 26 - Fukushima Recommendation 4.2 Mitigation Strategies of NRC Suggested U.S. Advanced Boiling Water Reactor Design Changes)
- ML21048A145 + (GEH Radiological Emergency Plan, Feb. 2020 (Redacted))
- ML24054A028 + (GEH Report of Revised Vallecitos Nuclear Center (Vnc) Site Facility Physical Security Plan (PSP) Revision, Dated April 4, 2022, Revision 2 Issued January 18, 2023)
- M188002, GEH Request for Additional Time to Respond to NRC Request for Additional Information + (GEH Request for Additional Time to Respond to NRC Request for Additional Information)
- M170158, GEH Request for Additional Time to Respond to NRC Request for Additional Information + (GEH Request for Additional Time to Respond to NRC Request for Additional Information)
- ML18038B237 + (GEH Request for Additional Time to Respond to NRC Request for Additional Information)
- ML17172A183 + (GEH Request for Additional Time to Respond to NRC Request for Additional Information)
- ML19319A852 + (GEH Request for Additional Time to Respond to NRC Requests for Additional Information (RAI) for the GE Model No. 2000 (Docket No. 71-9228) to Reintroduce BWR Irradiated Fuel Content)
- M170014, GEH Request for Change to Notice of Violation (NOV) Response Date - Additional Information + (GEH Request for Change to Notice of Violation (NOV) Response Date - Additional Information)
- ML17009A389 + (GEH Request for Change to Notice of Violation (NOV) Response Date - Additional Information)
- ML25055A018 + (GEH Request for Due Date Extension for Written Response to NRC Notice of Violation and Security Inspection Report 07000754/2024401 (EA-24-050))
- ML22161A958 + (GEH Request for Renewal - Certificate of Compliance No. 9228 for the Model No. 2000 Package, Revision 28, Docket No. 71-9228)
- ML24115A078 + (GEH Request to Delete a Quality Assurance Program Description (QAPD) for Radioactive Material Packages for the Vallecitos Nuclear Center (Vnc))
- M200062, GEH Request to Extend RAI Response Due Date to July 15, 2020 + (GEH Request to Extend RAI Response Due Date to July 15, 2020)
- ML20105A369 + (GEH Request to Extend RAI Response Due Date to July 15, 2020)
- M200113, GEH Request to Extend Request for Additional Information (RAI) Response Due Date to April 28, 2021 + (GEH Request to Extend Request for Additional Information (RAI) Response Due Date to April 28, 2021)
- ML20230A046 + (GEH Request to Extend Request for Additional Information (RAI) Response Due Date to April 28, 2021)
- ML21293A154 + (GEH Request to Withdraw Commitment Letter to NRC Order EA-06-155)
- ML21237A064 + (GEH Request to Withdraw Vnc Exemption Request for Shutdown Reactor Alternate Decommissioning Schedules)
- ML21158A099 + (GEH Request to Withhold a Portion of the Morris Operation Consolidated Safety Analysis Report (CSAR))
- M180064, GEH Response Plan for NRC Request for Additional Information + (GEH Response Plan for NRC Request for Additional Information)
- EPID:L-2017-LLA-0052 + (GEH Response Plan for NRC Request for Additional Information)
- ML18087A384 + (GEH Response Plan for NRC Request for Additional Information)
- ML25041A297 + (GEH Response for NRC Notice of Violation EA-24-050)
- ML23117A331 + (GEH Response for Request for Additional Information for NRC License No. R-33 Decommissioning Cost Estimate)
- M210091, GEH Response to NRC Request for Additional Information (RAI) About the Vallecitos Boiling Water Reactor (Vbwr) Structural Integrity + (GEH Response to NRC Request for Additional Information (RAI) About the Vallecitos Boiling Water Reactor (Vbwr) Structural Integrity)
- ML112300586 + (GEH Response to NRC Request for Additional Information Dated 6/2/11 for Decommissioning Funding Parent Company Guarantee)
- ML18085A656 + (GEH Response to NRC Request for Additional Information- Morris Operation Decommissioning Funding Plan)
- ML21209B010 + (GEH Response to NRC Request for Additional Information (RAI) About the Vallecitos Boiling Water Reactor (VBWR) Structural Integrity)
- M190044, GEH Response to NRC Request for Additional Information + (GEH Response to NRC Request for Additional Information)
- ML23349A047 + (GEH Response to NRC Request for Additional Information)
- ML19057A466 + (GEH Response to NRC Request for Additional Information)
- ML18151A860 + (GEH Response to NRC Request for Additional Information (RAI))
- M180115, GEH Response to NRC Request for Additional Information (RAI) + (GEH Response to NRC Request for Additional Information (RAI))
- ML18151A861 + (GEH Response to NRC Request for Additional Information (RAI))
- ML22012A148 + (GEH Response to NRC Second Request for Additional Information - Vallecitos Nuclear Center Decommissioning Funding Plan (Enterprise Project Number 000224/07000754/L-2020-DFA-0002))
- M210148, GEH Response to Request for Information Regarding Financial Assurance of Decommissioning Funds + (GEH Response to Request for Information Regarding Financial Assurance of Decommissioning Funds)
- ML21321A114 + (GEH Response to Request for Information Regarding Financial Assurance of Decommissioning Funds)
- ML23166B146 + (GEH Responses to OGC Comments on Ntr Appendix a Technical Specifications)
- ML20031C704 + (GEH Responses to the U.S. NRC RAIs ML19296C273 for the GE Model No. 2000 (GE2000))
- ML21294A077 + (GEH SNM 960 DFP Email on Inventory SNM)
- ML15099A279 + (GEH Slides for TVA Presentation to the NRC in Support of Steam Dryer Replacement)
- ML15092A271 + (GEH Submittal of Annual Shutdown Reactor Reports for 2014)
- ML18164A176 + (GEH Submittal of Standard Practice Procedures Plan (Sppp) Update)
- ML21211A617 + (GEH Supplemental Information Supporting GE Nuclear Test Reactor License Renewal Audit - Computer Files)
- ML23054A321 + (GEH Supplemental Information for Ntr License Renewal Application)
- ML22258A119 + (GEH Supplemental Information for Ntr License Renewal Application)