M170158, GEH Request for Additional Time to Respond to NRC Request for Additional Information

From kanterella
Jump to navigation Jump to search
GEH Request for Additional Time to Respond to NRC Request for Additional Information
ML17172A183
Person / Time
Site: Vallecitos Nuclear Center, Vallecitos
Issue date: 06/21/2017
From: Murray S
GE Hitachi Nuclear Energy
To: Jack Parrott
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
M170158, SPM 17-025
Download: ML17172A183 (2)


Text

GE Hitachi Nuclear Energy Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 M170158 USA T (910) 819-5950 scott.murray@ge.com June 21, 2017 Jack D. Parrott, Senior Project Manager Reactor Decommissioning Branch Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTN: Document Control Desk

Subject:

GEH Request for Additional Time to Respond to NRC Request for Additional Information

References:

1) NRC License DPR-1, Vallecitos Boiling Water Reactor (VBWR), Docket 50-18
2) NRC License DR-10, ESADA Vallecitos Experimental Superheat Reactor (EVESR), Docket 50-183
3) NRC License TR-1, General Electric Test Reactor (GETR), Docket 50-70
4) NRC License R-33, Nuclear Test Reactor (NTR), Docket 50-73
5) Letter, S.P. Murray to Director NMSS, GEH VNC Request for Alternate Decommissioning Schedules, 7/10/15
6) Letter, S.P. Murray to Director NMSS, GEH VNC Request for Alternate Decommissioning Schedules, Additional Information, 10/15/15
7) Letter, GEH Vallecitos Nuclear Center (VNC) Request for Alternate Decommissioning Schedules for DPR-1, DR-10 and TR-1 Licenses, Exemption Request, 7/15/16
8) Letter, J.D. Parrott (NRC) to S.P. Murray (GEH) Request for Additional Information, 5/16/17

Dear Mr. Parrott:

As indicated in your letter dated May 16, 2017 (Reference 8) NRC has determined that additional information is necessary to complete its exemption evaluation and requested GE Hitachi (GEH) provide this information by June 20, 2017. We have begun drafting the information, but will need additional time to respond.

Thus, GEH requests that our response to the NRC be provided no later than July 31, 2017.

GEH to US NRC M170158 June 21, 2017 Please contact me if you have any questions or would like to discuss this matter further.

Sincerely, t::fi~2~

Facility Licensing :;;,~

Commitments: None

Attachment:

None Cc: B. Watson, USNRC NMSS SPM 17-025