GEH Response to NRC Request for Additional Information- Morris Operation Decommissioning Funding Plan
ML18085A656
Person / Time
Site: 07200001
Issue date: 03/26/2018
From: Murray S
GE Hitachi Nuclear Energy
To: Pamela Longmire
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
M180063
Download: ML18085A656 (2)


Text

HITACHI M180063 March 26, 2018 Pamela Longmire, Project Manager Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Document Control Desk GE Hitachi Nuclear Energy Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA T (91 0) 819-5950 scott.murray@ge.com

Subject:

GEH Response to NRC Request for Additional Information-Morris Operation Decommissioning Funding Plan

References:

1) NRC License SNM-2500, Docket Number 72-1
2) Letter, S. Murray (GEH) to Director, Office of Nuclear Material Safety and Safeguards, "GEH Morris Operation Decommissioning Funding Plan, 12/14/12
3) Letter, S. Murray (GEH) to Director, Office of Nuclear Material Safety and Safeguards, "Updated GEH Morris Operation Decommissioning Funding Plan, 12/11/15
4) Letter, P. Longmire (NRC) to S.P. Murray (GEH), Request for Additional Information Regarding GEH Morris ISFSI Decommissioning Funding Plan, 2/28/18 GE Hitachi Nuclear Energy Americas LLC (GEH) hereby responds to NRC's Request for Additional Information (Reference 4) regarding the Special Nuclear Materials License SNM-2500 Updated Decommissioning Funding Plan (DFP) (Reference 3).

The Attachment to this letter provides the information in response to your request.

Please contact me if there are questions regarding this information.

Sincerely, fin~uR~

Facility Licensi~g M~na~

Attachment:

1) GEH Response to NRC 2/28/18 Request for Additional Information-SNM 2500 DFP CC: C. Jacobs, NRC SFM SPM 18-017

U.S. NRC March 26, 2018 Page 2 of 2 GEH Response to NRC 2/28/18 Request - SNM 2500 DFP NRC RAI 1 Provide a revised DFP that includes the information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1-4): (1) Spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

GEH Response NRC regulation 10 CFR 72.30(c) defines specific events to be considered to account for changes in costs during a DFP update. Since submittal of the original Morris Operation Decommissioning Funding Plan in December 2012:

1) No spills of radioactive material occurred producing additional residual radioactivity in onsite subsurface material.
2) No facility modifications occurred that impacted the decommissioning cost estimate.
3) There were no changes in authorized possession limits.
4) No active decommissioning occurred, thus there were no actual remediation costs that exceed the previous cost estimate.

These events will be re-considered and similar statements added to the Morris Operation DFP tri-ennial update scheduled to be submitted in December 2018.