Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-78-151, Fp&Ls Request to Change Required Date for Submission of Nuclear Material Inventory from 4/30/1978 to 8/31/1978 + (Fp&Ls Request to Change Required Date for Submission of Nuclear Material Inventory from 4/30/1978 to 8/31/1978)
- L-78-158, Fp&Ls Request to Delete Conditions of License N, O, and P from Enclosure 1 as Having Been Satisfied + (Fp&Ls Request to Delete Conditions of License N, O, and P from Enclosure 1 as Having Been Satisfied)
- ML070860659 + (Fpbi Request for Information)
- ML041260230 + (Fper - Fire Protection Evaluation Report, Revision 3)
- ML20070R982 + (Fpfp 2: a Code for Following Airborne Fission Products in Generic Nuclear Plant Flow Paths)
- ML20076F270 + (Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year Interval)
- ML021510238 + (Fpl/Nrc License Renewal Application Overview Meeting, January 16, 2002)
- ML103070034 + (Fpl/St Lucie - October 2010 Marine Turtle Removal Summary)
- L-2012-242, Fpl/St Lucie Plant 90 Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (Fpl/St Lucie Plant 90 Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- L-2012-241, Fpl/St. Lucie Plants 90 Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendations 2.1 and 2.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident + (Fpl/St. Lucie Plants 90 Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendations 2.1 and 2.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident)
- L-2012-244, Fpl/St. Lucie Plants 90-Day Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Da + (Fpl/St. Lucie Plants 90-Day Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-)
- L-2012-249, Fpl/St. Lucie Plants Clarification of the 60 Day Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights + (Fpl/St. Lucie Plants Clarification of the 60 Day Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights Fr)
- ML052980382 + (Fpmi Solutions Corporate Office Moving)
- ML16098A164 + (Fpra Dependency Analysis)
- ML18088B096 + (Fpra FAQ 14-0007 - Transient Fire Frequency Likelihood)
- ML18039A856 + (Fpra FAQ 16-0011 - Cable Tray Ignition - Draft)
- ML18074A020 + (Fpra FAQ 16-0011 Closure Memo)
- ML18075A083 + (Fpra FAQ 17-0013 HEAF NSP Rev C Final)
- ML18039A624 + (Fpra FAQ 17-0013 High Energy Arcing Fault (HEAF) Non-Suppression Probability (NSP) - Draft)
- ML18198A366 + (Fpra FAQ 18-0014 - Time to Detection Is Zero for Manual Non Suppression Probability Calculations - Version 0-V6)
- ML18039A661 + (Fpra FAQ 18-0014 - the Time to Detection Is Zero for Manual Non-Suppression Probability Calculations - Draft)
- ML19190A133 + (Fpra FAQ 18-0014 T0 Draft V7 - NRC Comments 070919)
- ML19101A352 + (Fpra FAQ 18-0014 T0 for NSP Curves Draft 0(7))
- ML19072A288 + (Fpra FAQ 18-0014 T0 for NSP Curves Mar 13 to NEI)
- ML19240A670 + (Fpra FAQ 18-0014 t0 for NSP Curves 15Aug2019)
- ML18277A208 + (Fpra FAQ 18-0015 Transient Fire Growth Curve)
- ML18277A205 + (Fpra FAQ 18-0015 Transient-Fire-Growth-Curve--v6 EPM Comments--RFC)
- ML18198A387 + (Fpra FAQ 18-0018 - Electricial Non-Suppression Probability)
- ML19101A341 + (Fpra FAQ 18-0018 NSP Update Draft 0G)
- ML19072A289 + (Fpra FAQ 18-0019 Transient-Fire-HRR-Curve Mar 13 to NEI)
- ML18271A106 + (Fpra FAQ 18-0019 Transient-Fire-HRR-Curve Sept 25)
- ML18088B138 + (Fpra Frequently Asked Question (FAQ) 14-0007, Transient Fire Frequency Likelihood)
- ML18075A086 + (Fpra Frequently Asked Question (FAQ) 17-0013, High Energy Arcing Fault Non-Suppression Probability)
- ML120030437 + (Fpra Pr Position Paper Final)
- ML16159A402 + (Fpra Ror for Point Beach SE Section 3.4)
- ML020520639 + (Fqa Methodology & Shutdown Margin During Physics Tests Methodology)
- ML19249F158 + (Fr Barker 731026 Supplemental Testimony Re Security Program)
- ML20012C636 + (Fr Correction Notice,Correcting Page 6116 in Second Column of 900221 Application for Amend to License)
- ML051040465 + (Fr Emergency Ea. Requesting Emergency Publication of the Document Entitled University of Utah Research Reactor Environmental Assessment and Finding of No Significant Impact (Docket No. 50-407), Which Was Transmitted on April 15, 2005)
- ML051040450 + (Fr Emergency Request for Publication of Document Entitled University of Utah Triga Nuclear Reactor Facility Exemption (Docket No. 50-407), Which Was Transmitted on April 15, 2005, to the Office of the Federal Register for Publication)
- ML19206A491 + (Fr Final Notice on DG-1287 Re an Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications)
- ML20236C208 + (Fr Notice (871102-03 Prehearing Conference).* Advises That Prehearing Conference Originally Set for 871020 Rescheduled for Purpose of Discussing Schedule for Filings & Hearings for Remainder of Case.Served on 871021)
- ML20151Y531 + (Fr Notice (880511 Prehearing Conference).* Public Prehearing Conference for Conducting Oral Argument for Two Proceedings Re Plant Scheduled on 880511 in Dallas,Tx.Served on 880503)
- ML20154H639 + (Fr Notice (880601 Prehearing Conference).* Public Prehearing Conference Previously Scheduled for 880511 Rescheduled to 880601 in Dallas,Tx.Served on 880520)
- ML20236D734 + (Fr Notice (Evidentiary Hearing).* Notifies That Public Evidentiary Hearing Re Emergency Planning Safety Issues Will Be Held on 890502-05 in Boston,Ma.Certificate of Svc Encl. Served on 890321)
- ML20247F299 + (Fr Notice (Limited Appearance Statements;Prehearing Conference).* Limited Appearance Session Will Be Conducted on 890928 & Prehearing Conference on 890929 in Van Nuys,Ca. W/Certificate of Svc.Served on 890913)
- ML20248J068 + (Fr Notice (Limited Time within Which to Intervene).* Submits Info Required to Be Published Per 890929 Granting of Three Petitions to Intervene,Per 10CFR2.1205(i).W/Certificate of Svc.Served on 891003)
- ML20155G944 + (Fr Notice (Schedule of Hearings).* ASLB Will Hold Limited Appearance Session on 881103 in Lancaster,Pa.Written Statements of Intention to Appear May Be Filed W/Board Prior to 881028.Served on 881007)
- ML20154P469 + (Fr Notice (Schedule of Hearings).* Public Hearings Scheduled for Listed Dates,Per 880825 Order.Limited Appearance Statements May Be Filed W/Aslb Prior to 881028.Served on 880928)
- ML19354D518 + (Fr Notice (Time Extended for Intervention).* Advises That Time within Which to Intervene Extended to 891125,per Rockwell Intl Corp 891102 Request for Amend to License Extension Request.Certificate of Svc Encl.Served on 891113)
- ML13137A408 + (Fr Notice - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazard and Opportunity for a Hearing (Exigent Circumstances))