Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20081H738 + (Fourth Interim Significant Const Deficiency Rept 78 Re American Bridge Structural Steel Defects.Addl Welds & Bolted Connections Requiring Rework Identified W/Scheduled Completion by 831118.Final Rept Expected by 831222)
- ML20091A135 + (Fourth Interim Significant Const Deficiency Rept 102 Re Failure to Install Dowels & Shear Blocks.Initially Reported on 840427.Addl Corrective Action Required.Completion Scheduled for Late May 1984.Final Rept Expected on 840525)
- ML20082P550 + (Fourth Interim Significant Const Deficiency Rept 81 Re Shelf Life Exceeded on Cable Splice & Termination Tape.Review of Test Results Scheduled to Be Completed in Early Dec 1983. Final Rept Will Be Submitted by 831215)
- ML20071M511 + (Fourth Interim Significant Const Deficiency Rept 34 Re HVAC Fan Shrouds.Corrective Action Not Completed Due to Delay in Delivery of Three Clips.Final Rept Expected by 830111)
- ML20087L130 + (Fourth Interim Significant Const Deficiency Rept 80 Re Unsatisfactory Stroking of Emergency Feedwater Turbine Steam Shutoff Valves.Further Testing During post-core Hot Functional Testing Required.Next Rept by 840713)
- ML20071L869 + (Fourth Interim Significant Const Deficiency Rept 41 Re Unapproved Welding.Final Rept Cannot Be Submitted Until 830113,due to Delay in Contractor Review of Heat Treatment)
- ML20027C175 + (Fourth Interim Significant Const Deficiency Rept 33 Re Chilled Water Pipe Supports.Corrective Action Not Yet Complete.Final Rept Expected by 830311)
- ML20080L881 + (Fourth Interim Significant Const Deficiency Rept 79 Re Unqualified Components in Hydrogen Analyzers.Completion of Corrective Action Delayed Until 831014 Due to Design Changes.Final Rept Will Be Submitted by 831110)
- ML20084M325 + (Fourth Interim Significant Const Deficiency Rept 99 Re Isolation Valves on Safety Injection Tanks.Investigation Incomplete.Final Rept Will Be Submitted on 840525)
- ML20039G596 + (Fourth Interim Significant Deficiency Rept 23 Re Defective Valve Actuators.Replacement Matl Received & Work Orders Issued to Replace 10 Valve Actuators.Completion Expected by 811224.Final Rept Will Be Submitted by 820108)
- ML091250484 + (Fourth Interval ISI Program Response to Request for Information for NDE-004)
- ML091250357 + (Fourth Interval ISI Program, Response to Request for Information Regarding NDE-005)
- ML092090789 + (Fourth Interval Inservice Inspection (ISI) Program, Rev. 7)
- ML110890748 + (Fourth Interval Inservice Inspection (ISI) Program Relief Request ISI-04 - R. E. Ginna Nuclear Power Plant)
- ML14142A089 + (Fourth Interval Inservice Inspection (ISI) Program, System Pressure Testing (Spt), SPT-003 and SPT-002)
- L-MT-04-050, Fourth Interval Inservice Inspection Examination Plan, Revision 2 + (Fourth Interval Inservice Inspection Examination Plan, Revision 2)
- L-MT-05-039, Fourth Interval Inservice Inspection Examination Plan. Revision 3 + (Fourth Interval Inservice Inspection Examination Plan. Revision 3)
- ML100330125 + (Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests)
- ML082880160 + (Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests)
- HNP-17-025, Fourth Interval Inservice Inspection Plan, Third Interval Containment Inservice Inspection Plan, and Fourth Interval Inservice Inspection Pressure Test Plan + (Fourth Interval Inservice Inspection Plan, Third Interval Containment Inservice Inspection Plan, and Fourth Interval Inservice Inspection Pressure Test Plan)
- ML033500241 + (Fourth Interval Inservice Inspection Program, Response to Request for Additional Information)
- NRC 2002-0067, Fourth Interval Inservice Inspection Program Relief Request No. 10 Drawings + (Fourth Interval Inservice Inspection Program Relief Request No. 10 Drawings)
- ML041130371 + (Fourth Interval Inservice Inspection Program Request for Additional Information Response)
- ML042730527 + (Fourth Interval Inservice Inspection Program Withdrawal of Relief Request SPT-001)
- ML032471647 + (Fourth Interval Inservice Inspection Program)
- ML023510289 + (Fourth Interval Inservice Inspection Program)
- RS-03-194, Fourth Interval Inservice Inspection Program Plan + (Fourth Interval Inservice Inspection Program Plan)
- SVP-03-019, Fourth Interval Inservice Inspection Program Plan + (Fourth Interval Inservice Inspection Program Plan)
- ML022610709 + (Fourth Interval Inservice Inspection Program Plan, Attachment C)
- ML022610153 + (Fourth Interval Inservice Inspection Program Plan, Attachments a and B)
- NRC 2002-0024, Fourth Interval Inservice Inspection Program, Plan & Schedule + (Fourth Interval Inservice Inspection Program, Plan & Schedule)
- SBK-L-20132, Fourth Interval Inservice Testing (IST) Program + (Fourth Interval Inservice Testing (IST) Program)
- ML090580295 + (Fourth Interval Inservice Testing Program Relief Request No. VR-14 R. E. Ginna Nuclear Power Plant)
- ML102360041 + (Fourth Interval Inservice Testing Program Plan, Pump Relief Request P-6, Response to Request for Additional Information)
- ML090540063 + (Fourth Interval Inservice Testing Program. Submittal of 10 CFR 50.55a Request Number VR-14)
- ML093350600 + (Fourth Interval Inservice Testing Program Plan and Proposed Alternatives and Relief Requests)
- RS-03-221, Fourth Interval Inservice Testing Program Plan + (Fourth Interval Inservice Testing Program Plan)
- ML050600277 + (Fourth Interval Inservice Testing Program Revised Relief Request P-8)
- ML042460632 + (Fourth Interval Inservice Testing Program Revised Relief Requests P-2)
- JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves + (Fourth Interval Inservice Testing Program for Pumps and Valves)
- NL-07-0987, Fourth Interval Inspection (ISI) Plan Correction + (Fourth Interval Inspection (ISI) Plan Correction)
- EPID:L-2018-LLR-0081 + (Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan)
- ML20210K676 + (Fourth Joint Rept on Status of Settlement Negotiations Re Sheffield,Il Low Level Waste Burial Site.Us Ecology Formulating counter-proposal & Will Be Submitted to State & NRC in Early May 1986.Certificate of Svc Encl)
- ML18022A044 + (Fourth Joint Status Report (DC Cir.)(Case No. 16-1004) 1-18-18)
- ML19351A732 + (Fourth Joint Status Rept.* Advises That Discovery Ongoing & Expected to Be Completed by 900131 Prior to Last Status Rept.Next Rept & Possibly Stipulation Will Be Filed on 900215.W/Certificate of Svc)
- ML20203P942 + (Fourth Monthly Status Rept on Review of Documents Identified in ASLB 851104 & 860108 Orders.Certificate of Svc Encl. Related Correspondence)
- ML20070U156 + (Fourth Motion for Summary Disposition of New England Coalition on Nuclear Pollution Contention I.I.Regulatory Basis for Contention No Longer Exists.Certificate of Svc Encl.Related Correspondence)
- ML20094E620 + (Fourth Part 21/deficiency Rept Re Makeup HPI Pump Vibration. Initially Reported on 830622.Cause Not Stated.Pumps Balanced & Vibration Level Measured.Next Rept Expected by 841119)
- ML20134E503 + (Fourth Partial Reponse to FOIA Request for Documents.Records in App G Already Available in Pdr.App H Records Encl & Being Made Available in PDR)
- ML20134B601 + (Fourth Partial Reponse to FOIA Request for Documents.Records in App G Already Available in Pdr.App H Records Encl & Being Made Available in PDR)
- ML20154C058 + (Fourth Partial Response to 850819 FOIA Request for All Records Re Enforcement Action EA-84-93.Apps R & Records Available in Pdr.Apps N,O,P & Q Records Withheld (Ref FOIA Exemptions 5 & 7))
- ML20202B025 + (Fourth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App D)