Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Fourth Interval Inservice Inspection Program Plan". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20081H738  + (Fourth Interim Significant Const Deficiency Rept 78 Re American Bridge Structural Steel Defects.Addl Welds & Bolted Connections Requiring Rework Identified W/Scheduled Completion by 831118.Final Rept Expected by 831222)
  • ML20091A135  + (Fourth Interim Significant Const Deficiency Rept 102 Re Failure to Install Dowels & Shear Blocks.Initially Reported on 840427.Addl Corrective Action Required.Completion Scheduled for Late May 1984.Final Rept Expected on 840525)
  • ML20082P550  + (Fourth Interim Significant Const Deficiency Rept 81 Re Shelf Life Exceeded on Cable Splice & Termination Tape.Review of Test Results Scheduled to Be Completed in Early Dec 1983. Final Rept Will Be Submitted by 831215)
  • ML20071M511  + (Fourth Interim Significant Const Deficiency Rept 34 Re HVAC Fan Shrouds.Corrective Action Not Completed Due to Delay in Delivery of Three Clips.Final Rept Expected by 830111)
  • ML20087L130  + (Fourth Interim Significant Const Deficiency Rept 80 Re Unsatisfactory Stroking of Emergency Feedwater Turbine Steam Shutoff Valves.Further Testing During post-core Hot Functional Testing Required.Next Rept by 840713)
  • ML20071L869  + (Fourth Interim Significant Const Deficiency Rept 41 Re Unapproved Welding.Final Rept Cannot Be Submitted Until 830113,due to Delay in Contractor Review of Heat Treatment)
  • ML20027C175  + (Fourth Interim Significant Const Deficiency Rept 33 Re Chilled Water Pipe Supports.Corrective Action Not Yet Complete.Final Rept Expected by 830311)
  • ML20080L881  + (Fourth Interim Significant Const Deficiency Rept 79 Re Unqualified Components in Hydrogen Analyzers.Completion of Corrective Action Delayed Until 831014 Due to Design Changes.Final Rept Will Be Submitted by 831110)
  • ML20084M325  + (Fourth Interim Significant Const Deficiency Rept 99 Re Isolation Valves on Safety Injection Tanks.Investigation Incomplete.Final Rept Will Be Submitted on 840525)
  • ML20039G596  + (Fourth Interim Significant Deficiency Rept 23 Re Defective Valve Actuators.Replacement Matl Received & Work Orders Issued to Replace 10 Valve Actuators.Completion Expected by 811224.Final Rept Will Be Submitted by 820108)
  • ML091250484  + (Fourth Interval ISI Program Response to Request for Information for NDE-004)
  • ML091250357  + (Fourth Interval ISI Program, Response to Request for Information Regarding NDE-005)
  • ML092090789  + (Fourth Interval Inservice Inspection (ISI) Program, Rev. 7)
  • ML110890748  + (Fourth Interval Inservice Inspection (ISI) Program Relief Request ISI-04 - R. E. Ginna Nuclear Power Plant)
  • ML14142A089  + (Fourth Interval Inservice Inspection (ISI) Program, System Pressure Testing (Spt), SPT-003 and SPT-002)
  • L-MT-04-050, Fourth Interval Inservice Inspection Examination Plan, Revision 2  + (Fourth Interval Inservice Inspection Examination Plan, Revision 2)
  • L-MT-05-039, Fourth Interval Inservice Inspection Examination Plan. Revision 3  + (Fourth Interval Inservice Inspection Examination Plan. Revision 3)
  • ML100330125  + (Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests)
  • ML082880160  + (Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests)
  • HNP-17-025, Fourth Interval Inservice Inspection Plan, Third Interval Containment Inservice Inspection Plan, and Fourth Interval Inservice Inspection Pressure Test Plan  + (Fourth Interval Inservice Inspection Plan, Third Interval Containment Inservice Inspection Plan, and Fourth Interval Inservice Inspection Pressure Test Plan)
  • ML033500241  + (Fourth Interval Inservice Inspection Program, Response to Request for Additional Information)
  • NRC 2002-0067, Fourth Interval Inservice Inspection Program Relief Request No. 10 Drawings  + (Fourth Interval Inservice Inspection Program Relief Request No. 10 Drawings)
  • ML041130371  + (Fourth Interval Inservice Inspection Program Request for Additional Information Response)
  • ML042730527  + (Fourth Interval Inservice Inspection Program Withdrawal of Relief Request SPT-001)
  • ML032471647  + (Fourth Interval Inservice Inspection Program)
  • ML023510289  + (Fourth Interval Inservice Inspection Program)
  • ML022610709  + (Fourth Interval Inservice Inspection Program Plan, Attachment C)
  • ML022610153  + (Fourth Interval Inservice Inspection Program Plan, Attachments a and B)
  • NRC 2002-0024, Fourth Interval Inservice Inspection Program, Plan & Schedule  + (Fourth Interval Inservice Inspection Program, Plan & Schedule)
  • SBK-L-20132, Fourth Interval Inservice Testing (IST) Program  + (Fourth Interval Inservice Testing (IST) Program)
  • ML090580295  + (Fourth Interval Inservice Testing Program Relief Request No. VR-14 R. E. Ginna Nuclear Power Plant)
  • ML102360041  + (Fourth Interval Inservice Testing Program Plan, Pump Relief Request P-6, Response to Request for Additional Information)
  • ML090540063  + (Fourth Interval Inservice Testing Program. Submittal of 10 CFR 50.55a Request Number VR-14)
  • ML093350600  + (Fourth Interval Inservice Testing Program Plan and Proposed Alternatives and Relief Requests)
  • RS-03-221, Fourth Interval Inservice Testing Program Plan  + (Fourth Interval Inservice Testing Program Plan)
  • ML050600277  + (Fourth Interval Inservice Testing Program Revised Relief Request P-8)
  • ML042460632  + (Fourth Interval Inservice Testing Program Revised Relief Requests P-2)
  • JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves  + (Fourth Interval Inservice Testing Program for Pumps and Valves)
  • NL-07-0987, Fourth Interval Inspection (ISI) Plan Correction  + (Fourth Interval Inspection (ISI) Plan Correction)
  • EPID:L-2018-LLR-0081  + (Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan)
  • ML20210K676  + (Fourth Joint Rept on Status of Settlement Negotiations Re Sheffield,Il Low Level Waste Burial Site.Us Ecology Formulating counter-proposal & Will Be Submitted to State & NRC in Early May 1986.Certificate of Svc Encl)
  • ML18022A044  + (Fourth Joint Status Report (DC Cir.)(Case No. 16-1004) 1-18-18)
  • ML19351A732  + (Fourth Joint Status Rept.* Advises That Discovery Ongoing & Expected to Be Completed by 900131 Prior to Last Status Rept.Next Rept & Possibly Stipulation Will Be Filed on 900215.W/Certificate of Svc)
  • ML20203P942  + (Fourth Monthly Status Rept on Review of Documents Identified in ASLB 851104 & 860108 Orders.Certificate of Svc Encl. Related Correspondence)
  • ML20070U156  + (Fourth Motion for Summary Disposition of New England Coalition on Nuclear Pollution Contention I.I.Regulatory Basis for Contention No Longer Exists.Certificate of Svc Encl.Related Correspondence)
  • ML20094E620  + (Fourth Part 21/deficiency Rept Re Makeup HPI Pump Vibration. Initially Reported on 830622.Cause Not Stated.Pumps Balanced & Vibration Level Measured.Next Rept Expected by 841119)
  • ML20134E503  + (Fourth Partial Reponse to FOIA Request for Documents.Records in App G Already Available in Pdr.App H Records Encl & Being Made Available in PDR)
  • ML20134B601  + (Fourth Partial Reponse to FOIA Request for Documents.Records in App G Already Available in Pdr.App H Records Encl & Being Made Available in PDR)
  • ML20154C058  + (Fourth Partial Response to 850819 FOIA Request for All Records Re Enforcement Action EA-84-93.Apps R & Records Available in Pdr.Apps N,O,P & Q Records Withheld (Ref FOIA Exemptions 5 & 7))
  • ML20202B025  + (Fourth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App D)