Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031C676 + (Forwrds marked-up Monthly Operating Rept for Oct 1978)
- ML18114A716 + (Forwwards IE Insp Rept 50-281/79-17 on 790313-16.No Noncompliance Noted)
- IR 015000004/2020003 + (Foss Therapy Services, NRC Form 591M Part 1, Inspection Report No. 15000004/2020003)
- ML20077S753 + (Fossil Whale Discovery at Aw Vogtle Electric Generating Plant,Burke County,Ga)
- 05000458/LER-1950-458, Fouling, Request to Provide ACRS with LER-50-458/99-016-00, Us Patent May 28, 2002, Us 6.396,892 + (Fouling, Request to Provide ACRS with LER-50-458/99-016-00, Us Patent May 28, 2002, Us 6.396,892)
- ML110800037 + (Found 2/7/11 Application for Amendment Re. Core Spray Pump Flow Rate Acceptable for Review)
- ML12167A065 + (Found 4/5/12 Application for Amendment Regarding ADS Bypass Timer Acceptable for Review)
- ML111460627 + (Found 4/8/11 Request for ISI Relief Acceptable for Review)
- ML12165A304 + (Found 5/8/12 Application for Amendment APRM Inoperable Acceptable for Review)
- ENS 55793 + (Found AM-241 Source)
- ML111320346 + (Found D.C. Cooks 05/03/11 Application for Amendment Acceptable for Review)
- ENS 57918 + (Found Density Gauge)
- ENS 56909 + (Found Depleted Uranium Projectile)
- ENS 55530 + (Found Gauge)
- ENS 56273 + (Found Gauge)
- ENS 57355 + (Found Gauge)
- ENS 56873 + (Found Gauges)
- ENS 55548 + (Found Ge-68 Source)
- ENS 55601 + (Found Licensed RA-226 Sources)
- ML092670540 + (Found Licensees 8/21/09 Relief Request ISIR-31 Acceptable for Review)
- ENS 56662 + (Found Medical Seed)
- ENS 55697 + (Found Moisture Density Guage)
- ML12163A033 + (Found Monticello 05/25/12 Application for Amendment Re. the 1AR Transformer Acceptable for Review)
- ENS 58077 + (Found Orphan Source)
- ENS 44879 + (Found Orphan Source - Suspected Well Logging Source)
- ENS 56486 + (Found Radioactive Source)
- ENS 57781 + (Found Radioactive Source)
- ML101750308 + (Found Relief Request No. 19, Dated 5/6/10, Acceptable for Review)
- ML12073A182 + (Found Relief Request RR-002 Acceptable for Review Per NRR Office Instruction LIC-109)
- ML12139A088 + (Found Relief Request RR-007 Acceptable for Review Per NRR Office Instruction LIC-109)
- ENS 55598 + (Found Source)
- ENS 55596 + (Found Source)
- ENS 56405 + (Found Source)
- ENS 56431 + (Found Source)
- ENS 56493 + (Found Source)
- ENS 57051 + (Found Source)
- ENS 57242 + (Found Source)
- ENS 57303 + (Found Source)
- ENS 57635 + (Found Source)
- ENS 57755 + (Found Source)
- ENS 57760 + (Found Source)
- ML102310278 + (Found Three ISI Relief Requests in the 3/12/10 Submittal Acceptable for Review Per LIC-109)
- ENS 45774 + (Found Troxler Moisture-Density Gauge)
- ML082690014 + (Found Two Applications for Amendment Acceptable for Review)
- ML102230020 + (Found the Licensees Cyber Security Application for Amendment Acceptable for Review)
- ML20004B880 + (Foundation Considerations in Siting of Nuclear Facilities in Karst Terrains and Other Areas Susceptible to Ground Collapse)
- ML20263C138 + (Foundation Drawing-Miscellaneous. Related Info Encl)
- ML20261N078 + (Foundation Geologic Profile Along Relief Well Line MCR Station 136+00 to 272+00)
- ML18212A156 + (Foundation Health LLC D/B/A Fairbanks Memorial Hospital; Amendment 58, License 50-13648-01; Docket 030-03509; Controls 608674 and 609312)
- ML18212A238 + (Foundation Health LLC D/B/A Fairbanks Memorial Hospital; Request for Additional Information; Amendment 58, License 50-13648-01; Docket 030-03509; Controls 608674 and 609312)
- ML18212A154 + (Foundation Health LLC D/B/A Fairbanks Memorial Hospital; Cover Letter; Amendment 58, License 50-13648-01; Docket 030-03509; Controls 608674 and 609312)
- ML17297B128 + (Foundation Instrumentation Rept. W/44 Oversize Drawings. Aperature Cards Are Available in PDR)
- ML18026A164 + (Foundation Investigation Boring Location Plan)
- ML20012A303 + (Foundation Investigation Evaluation of ERCW Roadway Access Cells a & B)
- ML20210B314 + (Foundation Investigation WPPSS Hanford 2 Nuclear Power Plant,Central Plant Facilities,Benton County,Washington)
- ML20028G836 + (Foundation Investigation of ERCW Pumping Station Foundation Cells)
- ML20235B815 + (Foundation Investigation,Bodega Bay Atomic Park,Unit 1, Bodega Bay,Ca)
- ML20039D949 + (Foundation Investigations:Clinch River LMFBR Site)
- ML20260L120 + (Foundation Mat Outline El 64 Ft 6 Inches Standby Service Water Pumphouse and Cooling Tower 1)
- ML20259D569 + (Foundation Plan & Details,Diesel Generator Bldg. Sheet 1)
- ML20266F374 + (Foundation Plan Bow Washing Facility as Built Drawing)