Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217E799 + (Forwards VP Milestone Summary Rept for Nov & Dec 1988,to Provide Snapshot Summary of Progress on Significant Activities at Each Site & Help Identify Bottlenecks. W/O Encl)
- ML20203P827 + (Forwards VP Milestone Summary Rept of All Sites for Mar, Consisting of Project Cumulative Status Sheet & Outstanding Milestone Activity Sheets,For Review & Use)
- ML20151N560 + (Forwards VP-NOS-20, North Anna Unit 1,Cycle 5 Core Performance Rept)
- ML20155F561 + (Forwards VP-NOS-24, North Anna Unit 2,Cycle 4 Core Performance Rept)
- ML18149A213 + (Forwards VP-NOS-26, Surry Unit 1 Cycle 8 Core Performance Rept)
- ML18149A214 + (Forwards VP-NOS-26, Surry Unit 1 Cycle 8 Core Performance Rept.)
- ML18153B476 + (Forwards VP-NOS-39, Surry Unit 1,Cycle 9 Performance Rept, for Info)
- ML18153B475 + (Forwards VP-NOS-39, Surry Unit 1,Cycle 9 Performance Rept, for Info)
- ML19305A782 + (Forwards VT Yankee & Northern States Power Co Re Response to Ten Sys Questions Concerning NEDO-24708)
- ML19338C026 + (Forwards VT Yankee 760927 Motion for Recall of Orders in Light of Changed Circumstances & Requests Reply by 761022. Suspension of All Pending Show Cause Proceedings Re Fuel Cycle Issues Is Being Considered)
- ML20071A812 + (Forwards VT Yankee Cycle 10 Core Performance Analysis Rept,Jan 1983. Proposed Change to Tech Spec Unnecessary. Reload Does Not Constitute Unreviewed Safety Question)
- ML20041E268 + (Forwards VT Yankee Nuclear Power Corp 1981 Inservice Insp Summary Rept,811017-811201, in Accordance W/Article IWA-6000 of Section XI to ASME Boiler & Pressure Vessel Code)
- ML20070R262 + (Forwards VT Yankee Power Station Inservice Insp Program, Rev 7)
- ML20063E982 + (Forwards VT Yankee Updated Fsar,Vols 1-6)
- ML20155C062 + (Forwards Validated Data Package for July 1998 Water Sampling Event at Green River,Ut Umtra Site for Info.Package Includes Electronic Diskette with Analytical Data.Without Diskette)
- NG-99-0622, Forwards Validated Exam Matls for Initial License Exam to Be Administered During Week of 990524,per NUREG-1021.Without Encl + (Forwards Validated Exam Matls for Initial License Exam to Be Administered During Week of 990524,per NUREG-1021.Without Encl)
- NG-99-1146, Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999 + (Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999)
- ML20095H235 + (Forwards Validation Efforts for Comanche Peak Steam Electric Station Unit 2, Per 920109 Meeting W/Nrc.Piping & Piping Supports in Turbine Bldg Completely Supported by Seismic Category 1 Walls)
- BVY-95-115, Forwards Validation Rept YAEC-1926, Method for Power/Flow Exclusion Region Calculation Using LAPUR5 Computer Code, Per NRC 950330 SER Re Thermal Hydraulic Stability + (Forwards Validation Rept YAEC-1926, Method for Power/Flow Exclusion Region Calculation Using LAPUR5 Computer Code, Per NRC 950330 SER Re Thermal Hydraulic Stability)
- ML20203H626 + (Forwards Validation Repts Re Employee Exposure Rept for Second Quarter of 1997 for Review & Acceptance.One Rept Contains Mostly Regional Records (Dtd 971101) & One Containing Only Headquarters Records (Dtd 971124))
- ML20086A778 + (Forwards Validation of Computerized Thermal Compliance & Plume Development at Sequoyah Nuclear Plant. EPA Approval of Compliance Method Requested)
- ML20138M937 + (Forwards Validity of Use of Temp Cutoff for Zircaloy Oxidation, Prepared Under FINs A-3808 & A-3809 by Intl Technical Svcs for BNL)
- ML20138M939 + (Forwards Validity of Use of Temp Cutoff for Zircaloy Oxidation, Prepared Under FINs A-3808 & A-3809 by Intl Technical Svcs for BNL)
- ML19347D330 + (Forwards Vallecitos BWR Annual Rept 16 (Deactivated),1980)
- ML20049J901 + (Forwards Vallecitos BWR Annual Rept 17 for 1981)
- ML20128N887 + (Forwards Valley Insp Svc,Inc 10CFR71 Quality Control Program)
- ML20129H529 + (Forwards Value Impact of Implementing Leak-Before-Break & Elimination of Associated Pipe Whip Restraints & Jet Deflectors on RCS Primary Loop, to Support Partial Exemption from GDC-4)
- ML20129H533 + (Forwards Value Impact of Implementing Leak-Before-Break & Elimination of Associated Pipe Whip Restraints & Jet Deflectors on RCS Primary Loop, to Support Partial Exemption from GDC-4)
- ML20147F102 + (Forwards Value/Impact Assessment to Provide Guidance to Applicants in Meeting Minimum Requirements for Containment Isolation of Fluid Sys)
- ML20205Q294 + (Forwards Values of Natural Background Rates & Values from Milk Samples.Natural Background Is 10 M/H.Activity in Milk for 860503 & 04 Encl)
- ML20058C473 + (Forwards Valve Comparison Between 3M26 HCU-65 Spec Safety Valve & 3M26 HC-75 Safety Valve, in Response to NUREG-0737, Item II.D.1 Re Performance Testing of BWR Relief & Safety Valves)
- ML18152B784 + (Forwards Valve Info,Where Available,In Response to 980529 RAI Re Resolution of GSI 165, Spring-Actuated Safety & Relief Valve Reliability)
- ML20062E667 + (Forwards Valve Inlet Fluid Conditions for Pressurizer Safety & Relief Valves,Me Yankee Power Station, Per Request for Addl Info Re Specific Test Condition Justification for Safety & Relief Valves)
- ML19249D854 + (Forwards Valve Inservice Testing & Insp Program for Pressure Testing Essential Sys for 20-month Segment,Beginning 790528. Insp Program Not Encl)
- ML20032E889 + (Forwards Valve Operability Analysis Performed by Posi-Seal Intl Inc,Manufacturer of Butterfly Valves Used for Facility Containment Purge & Vent Valves.Valves in Svc at Facility Meet Operability Criteria Established by Guidelines)
- ML20202F052 + (Forwards Valve Position & Alignment Justification & Revs to App R Repts 1 & 3 Incorporating Manual Pressurization Sys for Helium Circulator Brake & Seal Sys Into Shutdown Model, Per 860314 Commitment)
- ML13324A933 + (Forwards Valve Relief Request 10,eliminating Quarterly Testing Requirement for Feedwater Sys Check Valves 12-600-222 Noted in 840124 Inservice Testing Program.Valve Relief Request 9 Withdrawn)
- ML20078H302 + (Forwards Valve Relief Requests VRR-71 Re Defining & Verifying Max Accident Condition Flow for Air Supply Check Valves & VRR-72 Re Stroke Time Testing of Main Steam SRVs)
- ML19326B732 + (Forwards Valve Wall Thickness Verification Program & QA Audit Describing Corrective Action for Unresolved Item 72-12/2 in Response to AEC 720630 & s.Requests Review as Resolution of Item.W/O Encl)
- ML19326B727 + (Forwards Valve Wall Thickness Verification Program, Revision 3, & QA Audit Describing Corrective Action for Unresolved Item 72-12/2 in Response to AEC 720630 & s.W/O Encl)
- ML13312A735 + (Forwards Valves Used in Determining Radiation Monitor Emergency Action Levels in Revs 9 & 10 Emergency Plan Implementing Procedure S023-VIII-1,recognition & Classification of Emergencies)
- ML14188C139 + (Forwards Vapor Binding of Auxiliary Feedwater Pumps at Robinson Unit 2, AEOD Engineering Evaluation Rept Re 830419 Event)
- ML20206D553 + (Forwards Vapor Container Evaluation Summary & Geotechnical Engineers,Inc, Vapor Container Seismic Evaluation Soil Bearing Capacity Analysis, in Response to NRC Questions Re SEP Topic III-6)
- ML19199A570 + (Forwards Varga 770209 Memo W/Request to Assist in Hearing Testimony)
- ML19257C622 + (Forwards Variability of Upward & Downward Vertical Pressure Loads in Mark I Containment. Conclusions Differ from Statistical Margins of Uncertainty in Acceptance Criteria, Due to Inclusion of Factor to Reflect Mean Load Uncertainty)
- ML20199L268 + (Forwards Varian Form for Notifying NRC of Change of Location of Electron Capture Detector,Ni-63 from NUS Corp Main Office at Wayne,Pa to NUS Corp,Exton,Pa Warehouse.Also Encl Similar Info on Newly Purchased Shimadzu ECD)
- U-600320, Forwards Variance Request for Reg Guide 1.97, Empirical Determination of Sample Line Loss Correction Factors. Approval Requested for Delaying Empirical Determination of Iodine & Particulate Line Loss Correction Factors + (Forwards Variance Request for Reg Guide 1.97, Empirical Determination of Sample Line Loss Correction Factors. Approval Requested for Delaying Empirical Determination of Iodine & Particulate Line Loss Correction Factors)
- U-601379, Forwards Variance to NPDES Permit,Per Section 3.2 of Environ Protection Plan + (Forwards Variance to NPDES Permit,Per Section 3.2 of Environ Protection Plan)
- ML20125B800 + (Forwards Various Bechtel Documents,Per ALAB-106 & CP Amend 1.Includes Nonconformance Rept Log,Quality Audit Findings, Quality Action Requests & Mgt Corrective Action Repts)
- ML19263D615 + (Forwards Various Documents Re Expansion of Cotter Corp U Mill at Canon City,Co)
- ML20004F430 + (Forwards Various Documents Re Phillipine Reactor.Ucs Speech & Clippings,Congressional Ltrs & Petition for Rehearing Encl)