Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058L824 + (Forwards SSAR Markup Addressing Draft Final SER Open Items 3.7.2-8 & 3.7.2-9,per Markup)
- ML20035G131 + (Forwards SSAR Markup Addressing Draft,Final Ser,Confirmatory Item 7.6.1.3-1 Re Instrumentation & Controls for Process Radiation Monitoring Sys & High Pressure/Low Pressure Sys Interlock Protection Functions)
- ML20064E395 + (Forwards SSAR Markup Addressing EPG Issue on Htcl)
- ML20046C626 + (Forwards SSAR Markup Addressing Fuel Bundle mis-orientation Item 4.Informs That GE Plan to Include Info in Amend 32 Scheduled to Be Transmitted to NRC on 930831)
- ML20044G431 + (Forwards SSAR Markup Addressing Item 9.4.1(1) of 930525 Telcon Re Control Bldg HVAC)
- ML20045D339 + (Forwards SSAR Markup Addressing Items 20,27 & 31 of 930607-10 Meeting in San Jose Re Containment Overpressure Protection Sys)
- ML20079R805 + (Forwards SSAR Markup Addressing Response to Open Item F19.2.3.2.1-1 Re ACRS Concern W/Equipment Tunnel Protection)
- ML20063F334 + (Forwards SSAR Markup Addressing Response to Open Item F6.2.1.9-1,pertaining to Suppression Pool Strainers)
- ML20079R810 + (Forwards SSAR Markup Addressing Response to Open Item F19.2.3.3.7-1 Re Equipment Survivability)
- ML20044C827 + (Forwards SSAR Markup Addressing Section 3.7 Issues of 930222 Audit Rept.Markup Includes Audit Item 3 & 11 Responses, 931111 & 0222 Audit Repts,Respectively)
- ML20045C818 + (Forwards SSAR Markup Addressing Suppression Pool Strainer Issue 42.Info Will Be Included in Amend 30,scheduled for Transmittal to NRC on 930708)
- ML20070E198 + (Forwards SSAR Markup Indicating Applicable Edtion to UBC, AISI SG-673 & NEMA FB1 to ABWR Ssar.Changes Will Be Included in Amend 35 Mod Package.Notifies That Applicable Edition of Bechtel Rept BC-TOP-3-A Is Rev 3)
- ML20044D543 + (Forwards SSAR Markup Modifying Response Given in Re Draft FSER COL Action Item 12.5.1-1 Re Operational Consierations)
- ML20056F283 + (Forwards SSAR Markup Providing Resolution of Several Severe Accident Issues Raised by Nrc.Markup Will Be Included in Next Amend for Corresponding Chapters of ABWR)
- ML20044D652 + (Forwards SSAR Markup Re Qualification by Experience,Per 930514 Telcon W/D Terao)
- ML20045G709 + (Forwards SSAR Markup Resolving ISLOCA Issue 42 Re Intersys LOCA for Abwr,Replacing Text in Author)
- ML20034E782 + (Forwards SSAR Markup Responding to COL Action Item 6.3.4.2-1 & Revised Nuclear Boiler Sys Ibd Drawing 137C9464 (SSAR Figure 7.3-2) Showing Revised ADS Logic Responding to Confirmatory Item 6.3.3-1.W/38 Drawings.Drawings Withheld)
- ML20059E560 + (Forwards SSAR Markup Revising Structural Acceptance Criteria of Subsection 3.8.1.5)
- ML20058L832 + (Forwards SSAR Markup Showing Alternate Path to Discharge Excess Water to Main Condenser Rather than to Suppressing Pool,Per Discussions W/B Burton & J Lyons at 930413-15 Meeting W/Nrc in San Jose,Ca)
- ML20045G718 + (Forwards SSAR Markup Showing How Collapse of non-Category I Structure Will Not Impair Integrity of Seismic Category I Structures of Components.Info Will Be Incorporated in Amend 30)
- ML20059G948 + (Forwards SSAR Markup That Indicates DC Powered SRV Solenoids on Figure 5.1-3, Nuclear Boiler Sys P&Id)
- NSD-NRC-97-5300, Forwards SSAR Markup Which Shows Draft Changes Section 2.3 & 2.4 to Remove Term Site Interface.W Status for Item Will Be Confirm W Pending Incorporation Into Formal SSAR Rev + (Forwards SSAR Markup Which Shows Draft Changes Section 2.3 & 2.4 to Remove Term Site Interface.W Status for Item Will Be Confirm W Pending Incorporation Into Formal SSAR Rev)
- ML20058L844 + (Forwards SSAR Markup for Draft Final SER Open Item 19.1.6.4-1,supplementing 930416 Telcon)
- NSD-NRC-97-5373, Forwards SSAR Markup of 3.7.1.1 to Include Foundation Level Free Field Response Spectra & New Figures 3.7.1-18 & 3.7.1-19.Changes Will Be Included in Ssar,Rev 17.Encl Addresses RAI 231.39,open Item 5233 + (Forwards SSAR Markup of 3.7.1.1 to Include Foundation Level Free Field Response Spectra & New Figures 3.7.1-18 & 3.7.1-19.Changes Will Be Included in Ssar,Rev 17.Encl Addresses RAI 231.39,open Item 5233)
- ML20045D323 + (Forwards SSAR Markup of App 18E Plus Attachment to Table 18E.2.1,GE Believes Provides Satisfactory Resolution of Dfser Open Item 18.9.2.2.1-1)
- ML20035G262 + (Forwards SSAR Markup of Chapter 14 Re Startup Testing)
- NSD-NRC-97-5262, Forwards SSAR Markup of Chapter 2 Which Provides Changes to Address Open Items.Markups Were Discussed During 970806 Meeting + (Forwards SSAR Markup of Chapter 2 Which Provides Changes to Address Open Items.Markups Were Discussed During 970806 Meeting)
- ML20044G428 + (Forwards SSAR Markup of Composite Changes to Table 3.9-8 Re Inservice testing,safety-related Pumps & Valves.No Changes Made to Table Since Amend 27)
- ML20045D322 + (Forwards SSAR Markup of Figure 1.2-1,replacing Figure Provided in ,Addressing Dfser Open Item 1.2.6-1)
- ML20058P906 + (Forwards SSAR Markup of GSI 82 That Responds to Issues Raised by Plant Sys Branch During 931008 Telcon)
- ML20036B513 + (Forwards SSAR Markup of Revised LCO 3.7.5, Main Bypass Sys Supporting Accelerated ABWR Review Schedule)
- ML20070E189 + (Forwards SSAR Markup of Section 1A.2.34 Which Responds to TMI Item III.D.1(1).Mod Makes Section Consistent W/Ts 5.5.2.2.Change Will Be Included in Amend 35 Mod Package Scheduled for Distribution Later This Month)
- ML20045D779 + (Forwards SSAR Markup of Subsection 9.4.6 Re Radwaste Bldg AC Sys,Omitted from GE)
- ML20036B792 + (Forwards SSAR Markup of TS Section B3.0 Re LCOs)
- ML20045J235 + (Forwards SSAR Markup,Clarifying Boundaries of Nonradioactive Drain Sys,Radioactive Drain Transfer Sys & Liquid Radwaste Sys)
- ML20045H688 + (Forwards SSAR Markup,Clarifying In/Out Scope Portion of Potable & Sanitary Water Sys,Requested in ITAAC Questions & During 930714 Telcon.Change Will Be Included in Amend 32, Scheduled for Submittal on 930831)
- ML20045D382 + (Forwards SSAR Markup,Replacing Markup in Addressing Draft FSER Open Item 1.2.6-1)
- ML20063C907 + (Forwards SSAR Markups Addressing Confirmatory Item F14.3.3-1 Pertaining to ACRS Comments on Piping Design Acceptance Criteria)
- ML20036A060 + (Forwards SSAR Markups Addressing Confirmatory Items 3.6.1-2, 6.2.1.7-1 & Response to Open Item 6.2.1.6-3.Response to Question on Subsection 6.2.1.2.2 Re Design Features Also Encl)
- ML20035C278 + (Forwards SSAR Markups Addressing Dffser Confirmatory Item 9.5.1.2.2-1 & COL Action Items 9.5.1.4.6-1 & 20.3.1-1. Requests That Copy of Transmittal Provided to B Burton)
- ML20035C272 + (Forwards SSAR Markups Addressing Dfser Confirmatory Items 6.2.5-1,6.2.5-2 & Open Item 20.3-10.Requests That Copy of Transmittal Be Provided to G Gou)
- ML20035B309 + (Forwards SSAR Markups Addressing Dfser TMI Re Outstanding Open Items 20.3-6 & 20.3-9 & COL Action Items 20.3-1, 20.3.1-2,20.3.1-3,20.3.1-4,20.3.1-5 & 20.3-2)
- ML20035G140 + (Forwards SSAR Markups Addressing Draft FSER Chapter 12 Outstanding Items Re Radiation Sources,Radiation Protection Features,Health Physics Program & Compliance W/ Reg Guide 8.8)
- ML20036A062 + (Forwards SSAR Markups Addressing Draft FSER Action Item 1 1.2.1-1.Open Items 1.2.2-1 & 1.2.2-2 Re Common Engineering Design Control Process)
- ML20058L830 + (Forwards SSAR Markups Addressing Draft Final Sser Section 14.2 Outstanding Items to Clarify Role of start-up Administrative Manual & Scoping Documents,Per)
- ML20035E162 + (Forwards SSAR Markups Addressing Draft FSER Open Item 9.4.6-1.W/three Oversize Figures)
- ML20036A058 + (Forwards SSAR Markups Addressing Draft FSER Open Item 3.8.3-1 & COL Action Item 9.4.8-1 Re Drywell Equipment & Pipe Support Structure & Reactor Shield Wall Stabilizer)
- ML20035B324 + (Forwards SSAR Markups Addressing Dsfer Open Items 3.2-1-1, 3.2.1-2,3.7.2-6,3.7.2-7 & 3.8.4-1)
- ML20056D305 + (Forwards SSAR Markups Addressing Generic Fuel Licensing Item 17 & Proprietary App 4D,demonstrating That Chapters 4 & 15 Meet Proprietary Acceptance Criteria of App 4B.Vendor Plan to Include Info in Amend 32 Due by 930831.App 4D Withheld)
- ML20035A326 + (Forwards SSAR Markups Addressing Listed Dfser Outstanding Items.Ge Recommends That First Two Sentences of Fifth Paragraph of Dfser Page 14-18 Re Effect of Pipe Support Stiffness on Piping Response Be Replaced,As Listed)
- ML20063C926 + (Forwards SSAR Markups Addressing Modeling Uncertainy in PRA Success Criteria)