ML20045D322
| ML20045D322 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 06/15/1993 |
| From: | Fox J GENERAL ELECTRIC CO. |
| To: | Poslusny C Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9306280224 | |
| Download: ML20045D322 (2) | |
Text
_
7
, GENuclear Energy.
GeneralElectiic Company
.175 Curt er Aenue. San Jow, CA 95125.
June 15,1993 Docket No. STN 52-001 Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Schedule - DFSER Open Item 1.2.6-1
Dear Chet:
Enclosed is a SSAR markup of Figure 1.2-1 which replaces the figure provided in my June 14, 1993 letter addressing DFSER Open Item 1.2.6-1.
Please provide a copy of this transmittal to Jerry Wilson, Sincerely, kYY ack Fox l
Advanced Reactor Programs cc: Alan Beard (GE)
Norman Fletcher (DOE)
Bernie Genetti(GE) 1 JF7M77 9306280224 930615 h'
PDR:
A: ~ ADOCK-05200001 g
PDR.
f
.g
~
'?
y 10 gp i
sp;)
e NO.
FACILITY m
IEI 1
REACTOR CONTAINMENT E
2 REACTOR BUILDING 3
CONTROL BUILDING 8
4 MAIN STEAMEEEDWATER TUNNEL 5
TURBINE BUILDING 6
SERVICE BUILDING 5
7 RADWASTE BUILDING 8
HOUSE BOILER 9
C 4DENSATE STORAGE TANK 10 AAlf ANSFORMER 11 NORM i.SWIIGHGEAR U ##T 12 DIESEL OIL STORAGE TANK (a)
MMN 11 13 STACK 9
14 EQUIPMENT ENTRY LOCK 15 FIRE PROTECTION WATER 7
STORAGE TANK (2) 3 4
3 6
16 FIRE PROTECTION PUMPHOUSE 3 ~WVFR FvFL TMK,\\~
z, I?
BU m
O 13 O
l is 12 O
o 2
12 14 9
x.
C
'I S
FIGURE 1.2-1 SITE PLAN
"