ML20045D322

From kanterella
Jump to navigation Jump to search
Forwards SSAR Markup of Figure 1.2-1,replacing Figure Provided in ,Addressing Dfser Open Item 1.2.6-1
ML20045D322
Person / Time
Site: 05200001
Issue date: 06/15/1993
From: Fox J
GENERAL ELECTRIC CO.
To: Poslusny C
Office of Nuclear Reactor Regulation
References
NUDOCS 9306280224
Download: ML20045D322 (2)


Text

_

7

, GENuclear Energy.

GeneralElectiic Company

.175 Curt er Aenue. San Jow, CA 95125.

June 15,1993 Docket No. STN 52-001 Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation

Subject:

Submittal Supporting Accelerated ABWR Schedule - DFSER Open Item 1.2.6-1

Dear Chet:

Enclosed is a SSAR markup of Figure 1.2-1 which replaces the figure provided in my June 14, 1993 letter addressing DFSER Open Item 1.2.6-1.

Please provide a copy of this transmittal to Jerry Wilson, Sincerely, kYY ack Fox l

Advanced Reactor Programs cc: Alan Beard (GE)

Norman Fletcher (DOE)

Bernie Genetti(GE) 1 JF7M77 9306280224 930615 h'

PDR:

A: ~ ADOCK-05200001 g

PDR.

f

.g

~

'?

y 10 gp i

sp;)

e NO.

FACILITY m

IEI 1

REACTOR CONTAINMENT E

2 REACTOR BUILDING 3

CONTROL BUILDING 8

4 MAIN STEAMEEEDWATER TUNNEL 5

TURBINE BUILDING 6

SERVICE BUILDING 5

7 RADWASTE BUILDING 8

HOUSE BOILER 9

C 4DENSATE STORAGE TANK 10 AAlf ANSFORMER 11 NORM i.SWIIGHGEAR U ##T 12 DIESEL OIL STORAGE TANK (a)

MMN 11 13 STACK 9

14 EQUIPMENT ENTRY LOCK 15 FIRE PROTECTION WATER 7

STORAGE TANK (2) 3 4

3 6

16 FIRE PROTECTION PUMPHOUSE 3 ~WVFR FvFL TMK,\\~

z, I?

BU m

O 13 O

l is 12 O

o 2

12 14 9

x.

C

'I S

FIGURE 1.2-1 SITE PLAN

"