Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-6952, Forwards Rev 0 to Conduit Supports Trains a & B & Train C Larger than 2 Inch Diameter, Project Status Rept. Resolution of Issues Contained in Apps a & B of Encl Rept + (Forwards Rev 0 to Conduit Supports Trains a & B & Train C Larger than 2 Inch Diameter, Project Status Rept. Resolution of Issues Contained in Apps a & B of Encl Rept)
- ML20072D272 + (Forwards Rev 0 to Const Implementation Overview Organization Chart,)
- ML20094A274 + (Forwards Rev 0 to Control Room Design Review Program Plan, in Partial Fulfillment of Generic Ltr 82-33, Suppl 1 to NUREG-0737 - Requirements for Emergency Response Capability)
- ML13309B372 + (Forwards Rev 0 to Control Room Design Review Plan & Rev 0 to Control Room Design Review Rept, in Response to 830912 Telcon Re Generic Ltr 82-33 (Suppl 1 to NUREG-0737))
- ML20078J412 + (Forwards Rev 0 to Cooper Nuclear Station Restart Readiness Program)
- A820017, Forwards Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jan-June 1982 + (Forwards Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jan-June 1982)
- ML20024D074 + (Forwards Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jul-Dec 1981.)
- ML20077F801 + (Forwards Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jan-June 1981)
- A820009, Forwards Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jul-Dec 1981 + (Forwards Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jul-Dec 1981)
- ML20202H494 + (Forwards Rev 0 to Cooper Nuclear Station,Strategy for Achieving Engineering Excellence)
- ML20024D086 + (Forwards Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jul-Dec 1982.)
- NRC-92-0122, Forwards Rev 0 to Core Operating Limits Rept,Cycle 4. COLR Will Be Implemented for Use During Fourth Operating Cycle, Scheduled to Begin in Nov 1992 + (Forwards Rev 0 to Core Operating Limits Rept,Cycle 4. COLR Will Be Implemented for Use During Fourth Operating Cycle, Scheduled to Begin in Nov 1992)
- PY-CEI-NRR-1228, Forwards Rev 0 to Core Operating Limits Rept for Perry Nuclear Power Plant,Unit 1 Cycle 3 (Reload 2). Nonproprietary 23A6492,Rev 0 & Proprietary 23A6492AA,Rev 0, Suppl 1 Also Encl.Proprietary Rept Withheld (10CFR2.790) + (Forwards Rev 0 to Core Operating Limits Rept for Perry Nuclear Power Plant,Unit 1 Cycle 3 (Reload 2). Nonproprietary 23A6492,Rev 0 & Proprietary 23A6492AA,Rev 0, Suppl 1 Also Encl.Proprietary Rept Withheld (10CFR2.790))
- ML20033E291 + (Forwards Rev 0 to Core Operating Limits Rept for Operating Cycle 9, Per Amend 106 to License NPF-5,authorizing Relocation of fuel-related Limits Out of Tech Specs & Into Core Operating Limits Rept)
- ML20012D914 + (Forwards Rev 0 to Core Operating Limits Rept Unit 1 - Cycle 14 & Rev 0 to Core Operating Limits Rept Unit 2 - Cycle 13.)
- ST-HL-AE-3224, Forwards Rev 0 to Core Operating Limits Rept, Unit 2, Cycle 1,dtd 890804,per Tech Spec 6.9.1.6 + (Forwards Rev 0 to Core Operating Limits Rept, Unit 2, Cycle 1,dtd 890804,per Tech Spec 6.9.1.6)
- HL-1125, Forwards Rev 0 to Core Operating Limits Rept for Operating Cycle 13, Per Amend 168 to License DPR-57 + (Forwards Rev 0 to Core Operating Limits Rept for Operating Cycle 13, Per Amend 168 to License DPR-57)
- DCL-90-109, Forwards Rev 0 to Core Operating Limits Rept (COLR) COLR 2-4, COLR for Diablo Canyon Unit 2 Cycle 4, Per Tech Spec Paragraph 6.9.1.8.a + (Forwards Rev 0 to Core Operating Limits Rept (COLR) COLR 2-4, COLR for Diablo Canyon Unit 2 Cycle 4, Per Tech Spec Paragraph 6.9.1.8.a)
- ML18009A284 + (Forwards Rev 0 to Core Operating Limits Rept in Support of Cycle 3 Operations)
- ELV-02027, Forwards Rev 0 to Core Operating Limits Rept, for Cycle 3, Per Amends 32 & 12 to Licenses NPF-68 & NPF-79,respectively + (Forwards Rev 0 to Core Operating Limits Rept, for Cycle 3, Per Amends 32 & 12 to Licenses NPF-68 & NPF-79,respectively)
- ML20065M891 + (Forwards Rev 0 to Core Operating Limits Rept for Cycle 7)
- RC-94-0310, Forwards Rev 0 to Core Operating Limits Rept for Cycle 9 + (Forwards Rev 0 to Core Operating Limits Rept for Cycle 9)
- ML17310A535 + (Forwards Rev 0 to Core Operating Limits Rept for Pvngs,Unit 2 Cycle 5)
- ML17310A536 + (Forwards Rev 0 to Core Operating Limits Rept for Pvngs,Unit 2 Cycle 5.)
- ML17311A794 + (Forwards Rev 0 to Core Operating Limits Rept for Pvngs,Unit 2,Cycle 6)
- ML17311A795 + (Forwards Rev 0 to Core Operating Limits Rept for Pvngs,Unit 2,Cycle 6.)
- ML17291A213 + (Forwards Rev 0 to Core Operating Limits Rept,Cycle 10, for WNP-2)
- GO2-94-158, Forwards Rev 0 to Core Operating Limits Rept,Cycle 10, for WNP-2 + (Forwards Rev 0 to Core Operating Limits Rept,Cycle 10, for WNP-2)
- ML20043B735 + (Forwards Rev 0 to Core Operating Limits Rept,Cycle 6)
- ML20086F614 + (Forwards Rev 0 to Core Operating Limits Rept,Cycle 7)
- ML20094K011 + (Forwards Rev 0 to Core Operating Limits Rept,Unit 2 - Cycle 15)
- ML20093N654 + (Forwards Rev 0 to Core Operating Limits Rept for PBAPS Unit 3,Reload 10,Cycle 11)
- U-601977, Forwards Rev 0 to Core Operating Limits Rept for Reload 3, Cycle 4. Identifies Minor Error in Previously Reviewed & Approved Overpressurization Analysis Presented in NEDC-3154P, Max Extended Operating Domain & Feedwater.. + (Forwards Rev 0 to Core Operating Limits Rept for Reload 3, Cycle 4. Identifies Minor Error in Previously Reviewed & Approved Overpressurization Analysis Presented in NEDC-3154P, Max Extended Operating Domain & Feedwater..)
- ML20012D913 + (Forwards Rev 0 to Core Operating Limits Rept Unit 1 - Cycle 14 & Rev 0 to Core Operating Limits Rept Unit 2 - Cycle 13)
- ML20094K043 + (Forwards Rev 0 to Core Operating Limits Rept for Peach Bottom Atomic Power Station Unit 3,Reload 8,Cycle 9)
- ML20206E403 + (Forwards Rev 0 to Corporate Administrative Work Instruction N1AWI 6.1.5, Requisition Contents, in Response to NRC Request for Addl Info Re Generic Ltr 83-28,Item 2.2.1 Concerning Use of Equipment Classification Listing)
- ML18151A409 + (Forwards Rev 0 to Corporate Emergency Response Plan & Revs to Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0 & CPIP-3.1)
- ML18151A410 + (Forwards Rev 0 to Corporate Emergency Response Plan & Revs to Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0 & CPIP-3.1)
- ML20149L330 + (Forwards Rev 0 to Corrective Action Program Project Status Rept, Hvac. Resolution of Issues Identified in Evaluation & Resolution of Generic Technical Issues for HVAC Ducts & Duct Supports, Contained in Apps a & B of Encl Rept)
- ML20149E906 + (Forwards Rev 0 to Corrective Action Program,Project Status Rept,Equipment Qualification. Resolution of Issues in Generic Technical Issue Rept - Evaluation & Resolution of Tera Equipment Qualification Issue Included in Rept)
- TXX-6948, Forwards Rev 0 to Corrective Action Program Project Status Rept Conduit Supports Train C 2-Inch Diameter & Less. Resolution of Issues Identified in Generic Technical Issues Rept...Resolution of Cygna Train...Issues Included in Rept + (Forwards Rev 0 to Corrective Action Program Project Status Rept Conduit Supports Train C 2-Inch Diameter & Less. Resolution of Issues Identified in Generic Technical Issues Rept...Resolution of Cygna Train...Issues Included in Rept)
- ML20149F085 + (Forwards Rev 0 to Critical Design Characteristics Overcooling Events,Millstone 2, for NRC Approval to Be Verified by Independent Corrective Action Verification Program Contractor)
- ML20207B025 + (Forwards Rev 0 to Criticality Safety Evaluation License Annex Hoods & Containments. Tenth Such Submittal Presented in Format of License Annex)
- 3F0590-20, Forwards Rev 0 to Crystal River Unit 3 Cycle 8 Core Operating Limits Rept, Per Tech Spec 6.9.1.7 + (Forwards Rev 0 to Crystal River Unit 3 Cycle 8 Core Operating Limits Rept, Per Tech Spec 6.9.1.7)
- ML20205H248 + (Forwards Rev 0 to Cse License Annex LLRW Processing Sys, Which Covers low-level Radwaste Processing Sys)
- ML20209C242 + (Forwards Rev 0 to Cse License Annex,Solvent Extraction Re Commitment to Submit Upgraded Csa/Cse Summaries in Format of License Annex)
- AECM-87-0234, Forwards Rev 0 to Current Cycle Safety Analysis (Ccsa) Which Will Be Used to Suppl Existing Baseline Analyses Contained in Updated Fsar.Ccsa Provides Info on Current Fuel Cycle Operations & Contains Analyses Supporting Operations + (Forwards Rev 0 to Current Cycle Safety Analysis (Ccsa) Which Will Be Used to Suppl Existing Baseline Analyses Contained in Updated Fsar.Ccsa Provides Info on Current Fuel Cycle Operations & Contains Analyses Supporting Operations)
- ML20148G915 + (Forwards Rev 0 to Cyap Haddam Neck Plant Radiation Protection Improvement Plan, in Response to CAL 1-97-07)
- CY-97-049, Forwards Rev 0 to Cyap Haddam Neck Plant Radiation Protection Improvement Plan, in Response to CAL 1-97-07 + (Forwards Rev 0 to Cyap Haddam Neck Plant Radiation Protection Improvement Plan, in Response to CAL 1-97-07)
- B13664, Forwards Rev 0 to Cycle 11 Core Operating Limits Rept & Changes to Tech Spec Bases Re Thermal Margin/Low Pressure + (Forwards Rev 0 to Cycle 11 Core Operating Limits Rept & Changes to Tech Spec Bases Re Thermal Margin/Low Pressure)
- GO2-95-103, Forwards Rev 0 to Cycle 11,Core Operating Limits Rept + (Forwards Rev 0 to Cycle 11,Core Operating Limits Rept)
- ML17291A824 + (Forwards Rev 0 to Cycle 11,Core Operating Limits Rept.)