ML20033E291

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Core Operating Limits Rept for Operating Cycle 9, Per Amend 106 to License NPF-5,authorizing Relocation of fuel-related Limits Out of Tech Specs & Into Core Operating Limits Rept
ML20033E291
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/26/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20033E292 List:
References
HL-979, NUDOCS 9003120184
Download: ML20033E291 (2)


Text

-. -.

(

. Cenge Poaw com;mny 333 Piedmont Aenue a

AI!ania. Georg a 30300 Telephov 4416Pb 3195

~*

Ma4,ng Ahea 40 inernew ct mer Pa4way Post 0"ce flax 1 Pith

)

Runnghaco Alatsama OfJ'01 Tulephune 205 66Pr%B1

'l

y.

r e,c;n r: r eslw W. G, Hairston, Ill l

Seas Vce Preutent i

Naciear Operat ons HL-979 000282 February 26, 1990 t

U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C.

20555 l

l PLANT HATCH - UNIT 2 NRC DOCKET 50-366 OPERATING LICENSE NPF-5

{

CYCLE NINE CORE OPERATING LIMITS REPORT Gentlemen:

By Amendment 106 to the Unit 2 Technical Specifications, the NRC authorized relocation of certain fuel related limits out of the Technical Specifications into an adjunct Core Operating Limits Report. This letter I

transmits an information copy of Revision 0 of the Core Operating Limits Report for Hatch 2 Cycle 9.

This document supports operation in conjunction with Amendment 106 of the Unit 2 Technical Specifications.

If

.l l-changes to the core operating limits contained in this report are required during' the operating cycle, a complete revised document will be issued at y

that time.

l If there are any questions regarding this report, please contact this

'i office at any time.

1 Sincerely, 10>b.l$=

W. G. Hairston, III i

RDB/eb Enclosure c:

(See next page.)

jp l

  1. fd cb**^

90031201e4 900226 b

I l

{DR ADOCK0500pp6 y

GeorgiaPower d U.S. Nuclear Regulatory Commission February 26, 1990 t

Page Two c: Georaia Power comoany Mr. H. C. Nix, General Manager - Nuclear Plant Mr. J. D. Heidt, Manager Engineering and Licensing - Hatch GO-NORMS t

U.S. Nuclear Reaulatory Commission. Washinoton. D.C.

Mr. L. P. Crocker, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Commission. Reaion 11 Mr. S. D. Ebneter, Regional Administrator Mr. J. E. Menning, Senior Resident Inspector - Hatch i

i 1

000282 l