ML20094A274

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Control Room Design Review Program Plan, in Partial Fulfillment of Generic Ltr 82-33, Suppl 1 to NUREG-0737 - Requirements for Emergency Response Capability
ML20094A274
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/31/1984
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20094A276 List:
References
RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, NUDOCS 8408030167
Download: ML20094A274 (1)


Text

e- 3 m O

wisconsin Electnc MER COMPANY 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 July 31, 1984 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 SUBMISSION OF THE CONTROL ROOM DESIGN REVIEW PROGRAM PLAN POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 In our May 3, 1984 letter to you, Wisconsin Electric committed. to submit a control room design review plan no later than July 31, 1984. This commitment was confirmed in your order to us dated July 3, 1984. Enclosed for your review is a copy of the Point Beach Nuclear Plant Control Room Design Review Program Plan.

This plan is partial fulfillment of the requirements of " Supplement 1 to NUREG-0737 - Requirements for Emergency Response Capability (Generic Letter 82-33) ", Item 5.2. This document, and the appendices thereto, are part of a dynamic process and may require changes as refinements are deemed necessary. The version in use at the time of performing each task will Le documented and maintained as part of the Control Room Design Review effort.

Execution of the Control Room Design Review is proceeding in accordance with the schedule discussed in Section 5.0 of the Program Plan.

Should you have any questions concerning the Program Plan, please let us know.

Very truly yours, 8408030167 840731 DR ADOCK 05000 hh j Vice Presid nt- uclear Power

Enclosure:

Point Beach Nuclear Plant Control Room Design Review Program Plan g{6p i

L