- ML19225B519 + (Forwards Reactor Bldg Containment Integrated Leak Rate Test Performed 790313-16)
- ML19225B520 + (Forwards Reactor Bldg Containment Integrated Leak Rate Test Performed 790313-16)
- ML20004A971 + (Forwards Reactor Bldg Containment Integrated Leak Rate Test, Conducted 810214-15)
- ML20004A972 + (Forwards Reactor Bldg Containment Integrated Leak Rate Test, Conducted 810214-15)
- ML19323E427 + (Forwards Reactor Bldg Containment Integrated Leak Rate Test, Conducted 800220-23)
- ML18025A878 + (Forwards Reactor Bldg Containment Integrated Leak Rate Test, Conducted 800220-23)
- ML18032A716 + (Forwards Reactor Bldg Containment Leak Rate Test 90-day Rept,Per Tech Spec 6.7.3.C.1.a.Secondary Containment for All Three Reactor Zones & Common Refuel Zone Tested on 871026)
- ML18032A718 + (Forwards Reactor Bldg Containment Leak Rate Test 90-day Rept,Per Tech Spec 6.7.3.C.1.a.Secondary Containment for All Three Reactor Zones & Common Refuel Zone Tested on 871026)
- ML19309A107 + (Forwards Reactor Bldg Entry Program & Requests Approval to Proceed W/Entry as Soon as Possible to Gather Data for Completion of Cleanup)
- ML20126J862 + (Forwards Reactor Bldg Integrated Leak Rate Test (Type a) Final Technical Rept, for Facility Startup)
- ML19322B548 + (Forwards Reactor Bldg Post-Tension Sys End Anchorage Surveillance Rept. W/O Encl)
- ML19317F509 + (Forwards Reactor Bldg Post-Tensioning Sys End Anchorage Surveillance Rept. W/O Encl)
- ML19340A168 + (Forwards Reactor Bldg Post-Tensioning Sys Initial Surveillance)
- ML19312C924 + (Forwards Reactor Bldg Post-Tensioning Sys Initial Surveillance Rept)
- ML19312C925 + (Forwards Reactor Bldg Post-Tensioning Sys Initial Surveillance Rept.)
- ML20196A310 + (Forwards Reactor Check List for License XSNM-2144 & End Use Statement & Reactor Check List for License XSNM-2359)
- ML20148A076 + (Forwards Reactor Checklist Re Export Lic Appl to Export 75kg Uranium to Belgium)
- ML19295A620 + (Forwards Reactor Checklist Re Request from Germany for Highly Enriched U,For NRC Records on License Applications from Transnuclear,Inc)
- ML20137A608 + (Forwards Reactor Checklist for Export License Application, for Consideration in Conjunction W/Original Application Forwarded on 850628)
- ML20126C466 + (Forwards Reactor Checklist for Export of 218 Kg Highly Enriched U to West Germany)
- ML19289C941 + (Forwards Reactor Checklist for Inclusion Into 781208 Export License Application.W/Encl)
- ML19281A430 + (Forwards Reactor Checklist for Transnuclear,Inc Export License XSNM-1429)
- ML20155G407 + (Forwards Reactor Checklist from Mcmaster Univ Research Reactor.Checklist Should Be Considered in Conjunction W/Original Application for Export License Sent on 880912)
- ML20126C443 + (Forwards Reactor Checklist in Conjunction W/Application for License to Export 218.545 Kg Highly Enriched U (93.3%))
- ML20028H588 + (Forwards Reactor Checklist in Support of Application for License XSNM-2553)
- ML19281A436 + (Forwards Reactor Checklist to Include 781208 Export License Application)
- ML20210T208 + (Forwards Reactor Checklist to Support 870128 Application)
- ST-HL-AE-1489, Forwards Reactor Containment Bldg Design Rept, Per Commitment Made at Structural Engineering Branch Design Audit During Wk of 850107.Util Does Not Intend to Prepare Similar Repts for Remaining Category I Structures + (Forwards Reactor Containment Bldg Design Rept, Per Commitment Made at Structural Engineering Branch Design Audit During Wk of 850107.Util Does Not Intend to Prepare Similar Repts for Remaining Category I Structures)
- ML18089A420 + (Forwards Reactor Containment Bldg First Inservice Integrated Leak Rate Test & Type B & C Surveillance Test, Performed During First Refueling Outage on 830523.Summary of Local Leak Prior to First Inservice Type a Test Also Encl)
- ML18089A421 + (Forwards Reactor Containment Bldg First Inservice Integrated Leak Rate Test & Type B & C Surveillance Test, Performed During First Refueling Outage on 830523.Summary of Local Leak Prior to First Inservice Type a Test Also Encl)
- ML18038B118 + (Forwards Reactor Containment Bldg ILRT Browns Ferry Nuclear Plant Unit 2 Conducted 941105-07. Requests NRC Approval of BFN Subsequent Cilrt (Type a Test) Schedule,Since as-found Primary Containment Total Leak Rate Exceeded TS Limit)
- ML18038B119 + (Forwards Reactor Containment Bldg ILRT Browns Ferry Nuclear Plant Unit 2 Conducted 941105-07. Requests NRC Approval of BFN Subsequent Cilrt (Type a Test) Schedule,Since as-found Primary Containment Total Leak Rate Exceeded TS Limit)
- ML20097E975 + (Forwards Reactor Containment Bldg ILRT Browns Ferry Nuclear Plant Unit 3 Conducted 951106-07)
- ML17349A684 + (Forwards Reactor Containment Bldg ILRT Rept,1992 Turkey Point Unit 3 Ilrt. Test Completed on 921114)
- ML17349A685 + (Forwards Reactor Containment Bldg ILRT Rept,1992 Turkey Point Unit 3 Ilrt. Test Completed on 921114)
- ML20058P000 + (Forwards Reactor Containment Bldg ILRT Rept, Addressing ILRT Conducted at Beginning of Cycle 10 Refueling (10R) Outage During Period from 930914-16.Results Demonstrate Reactor Bldg Leakage to Be within Acceptance Criteria)
- NG-93-5095, Forwards Reactor Containment Bldg ILRT Types A,B & C Periodic Test Rept for 1993 Refueling Outage,Including Apps Consisting of Results & Analysis of Type B & Type C Tests Performed Prior to & During Refueling Outage + (Forwards Reactor Containment Bldg ILRT Types A,B & C Periodic Test Rept for 1993 Refueling Outage,Including Apps Consisting of Results & Analysis of Type B & Type C Tests Performed Prior to & During Refueling Outage)
- ML20056F748 + (Forwards Reactor Containment Bldg Ilrt,Beaver Valley Power Station,Unit 1,May 1993 Rept,Providing Summary of ILRT Conducted During Ninth Refueling Outage & Summary of Results for Local Leakage Rate Tests Performed Since Previous ILRT)
- ML20211K814 + (Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met)
- ML20128F677 + (Forwards Reactor Containment Bldg Ilrt,Unit 2 - Fourth Periodic Summary Rept)
- HL-3133, Forwards Reactor Containment Bldg Ilrt,Unit 2 - Fourth Periodic Summary Rept + (Forwards Reactor Containment Bldg Ilrt,Unit 2 - Fourth Periodic Summary Rept)
- ML20046B574 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Quad-Cities Nuclear Power Station Unit 2, for Period 930517-19)
- ML20099H042 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Quad-Cities Nuclear Power Station Unit II for Period 920401-06. Next Type a Test for Quad-Cities Unit II Scheduled for Spring 1993)
- 3F0388-16, Forwards Reactor Containment Bldg Integrated Leak Rate Test (Ilrt). Rept Provides Info Re Aborted ILRT Attempt Which Occurred Prior to Completion of Successful Test.Info Re Reason for Aborted Test & Corrective Action in App H + (Forwards Reactor Containment Bldg Integrated Leak Rate Test (Ilrt). Rept Provides Info Re Aborted ILRT Attempt Which Occurred Prior to Completion of Successful Test.Info Re Reason for Aborted Test & Corrective Action in App H)
- ML17348B359 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test (ILRT) - 1991 Turkey Point,Unit 4,ILRT - Date of Test Completion:911020.)
- ML18139B580 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Type A,B & C Surveillance Test.)
- L-86-262, Forwards Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test,Turkey Point Plant Unit 4 + (Forwards Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test,Turkey Point Plant Unit 4)
- U-600611, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept,Per 10CFR50,App J.Schematic Arrangement of Leakage Rate Measurement Sys Included in Rept + (Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept,Per 10CFR50,App J.Schematic Arrangement of Leakage Rate Measurement Sys Included in Rept)
- RBG-37750, Forwards Reactor Containment Bldg Integrated Leak Rate Test Summary Technical Rept + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Summary Technical Rept)
- ML17300A278 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Summary Technical Rept)
- ML17298A292 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Summary Technical Rept)