Forwards Reactor Containment Bldg ILRT Rept,1992 Turkey Point Unit 3 Ilrt. Test Completed on 921114
ML17349A684
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 02/18/1993
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17349A685 List:
References
L-93-45, NUDOCS 9302230378
Download: ML17349A684 (4)


Text

acczj.mm x OOCmmx.r orson mrOX Svsmrvr

~'a REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)

CESSION NBR:9302230378 DOC.DATE: 93/02/18 NOTARIZED: NO 'OCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Reactor Containment Bldg ILRT Rept,1992 Turkey Point Unit 3 ILRT." Test completed on 921114.

DISTRIBUTION CODE:

A017D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:

Append J Containment Leak Rate Testing NQTEs: 5 8N @~pQ D

RECIPIENT ID CODE/NAME PD2-2 LA RAGHAVANgL INTERNAL: NRR/DST/SPLB 8D OGC/HDS3 RES/DE/SEB EXTERNAL: NRC PDR COPIES LTTR ENCL 1

0 2

2 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD O~CLFMB EG F

01 S/DSIR/SAIB NSIC COPIES LTTR ENCL 1

1 1

0 1

1 1

1 1

1 A

NOTE TO ALL"RIDS" RECII'IENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT TIIE DOCUMENT CONTI<OL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FIEOM DISTRIBUTION LISTS FOR DOCUMEN!'S YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL 10

i I

r I

tg l~i'~

I

~

P.O. Box 029100, Miami, FL, 33102-9100

FEB 18 1993 L-93-45 10 CFR 50 Appendix J U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D. C.

20555 Gentlemen:

Re:

Turkey Point Unit 3 Docket No. 50-250 Reactor Containment Building Inte rated Leak Rate Test Enclosed please find the summary technical report of the Reactor Containment Building Integrated Leak Rate Test for Turkey Point Unit 3, as required by 10 CFR 50, Appendix J.

Should there be any questions, please contact us.

Very truly yours,

/. 7 luNl(EW lg T ~ F. Plunkett Vice President Turkey Point Nuclear TFP/CLM/cm enclosure cc: