Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Proposed Revisions to SPS & NAPS Emergency Plans". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML18153B467  + (Forwards Proposed Revisions to SPS & NAPS Emergency Plans)
  • ML20003H953  + (Forwards Proposed Revisions to Security Plan.Revisions Withheld (Ref 10CFR2.790))
  • ML19343C551  + (Forwards Proposed Revisions to Tech Specs 3.1.3.1,3.1.3.4 & Last Paragraph of Page 3.1-7.Format Request for Amend Will Be Made After Safety Committee Approval Received)
  • ML19343C552  + (Forwards Proposed Revisions to Tech Specs 3.1.3.1,3.1.3.4 & Last Paragraph of Page 3.1-7.Format Request for Amend Will Be Made After Safety Committee Approval Received)
  • ML20071Q684  + (Forwards Proposed Revisions to Tech Specs Re Organization, Review & audit-administrative Controls.Clarifications of Submittals,Ltrs & Discussions Provided)
  • ML19338D553  + (Forwards Proposed Revisions to Tech Specs,Implementing Changes Requested by NRC 800702 Ltr Re TMI Lessons Learned Requirements.Proposed License Conditions Encl)
  • ML19338D552  + (Forwards Proposed Revisions to Tech Specs,Implementing Changes Requested by NRC Re TMI Lessons Learned Requirements.Proposed License Conditions Encl)
  • ML20064J283  + (Forwards Proposed Revisions to Tech Specs to Amend Operating License)
  • ST-HL-AE-4211, Forwards Proposed Revisions to Updated FSAR to Reallocate Margin to Address Large Break LOCA Analysis for Initial Containment Temp Assumptions  + (Forwards Proposed Revisions to Updated FSAR to Reallocate Margin to Address Large Break LOCA Analysis for Initial Containment Temp Assumptions)
  • ML20095B472  + (Forwards Proposed Revs 1G & 2E to BVPS Units 1 & 2 IST Program for Pumps & Valves,Respectively for NRC Approval. Proposed Revs Include Requests for Relief in Accordance W/ Section 5.5.1 of NUREG-1482,issued as Suppl 1 to GL 89-04)
  • ML20215H425  + (Forwards Proposed Revs to 10CFR30,40 & 70,extending Region IV Authority to Include Us Air Force Licensing Activities. Similar Delegation of Authority Anticipated for Us Navy Program in 1987.Rule Effective on 861001)
  • ML20128F313  + (Forwards Proposed Revs to 10CFR50,52 & 100 Re Reactor Site Criteria Including Seismic & Earthquake Engineering Criteria for NPPs & Proposed Denial of PRM from Free Environ,Inc)
  • ML20133J181  + (Forwards Proposed Revs to 10CFR73.71 Re Notification Requirements for Safeguards Events,For Review.Concurrence in Exemption of Amend from Formal CRGR Review Requested)
  • ML20214G420  + (Forwards Proposed Revs to ASME Code Section Iii,App Xvii Re Decohesion Cracking of Underweld Base Matl in Weld Operations as Functional Guidance Only in Region V Development of Review of Util Proposed Repair Program)
  • ML20202C871  + (Forwards Proposed Revs to Codes & Stds rule,10CFR50.55a.Subj Package Contains Listed Info)
  • ML20127B403  + (Forwards Proposed Revs to Des & Answers to Comments in Util .Results Emphasize Uncertainty W/Calculations of Seismic Hazard Used in Severe Accident Risk Assessment)
  • ML20237K963  + (Forwards Proposed Revs to Emergency Plan,Reflecting Reorganization of Facility Mgt.Reactor Operators Are Not Required to Be in Line of Succession for Emergency Director)
  • ML20062L669  + (Forwards Proposed Revs to Emergency Preparedness Plan. Proposed Revs Reflect Changes as Consequence of Biennia Review & Licensee Attempt to Conform to New 10CFR20 Regulations)
  • PY-CEI-NRR-0313, Forwards Proposed Revs to FSAR Re Fracture Toughness of RCPB Matls to Resolve SER Confirmatory Issue 17,per NRC Request.Changes Will Be Incorporated in Future FSAR Amend  + (Forwards Proposed Revs to FSAR Re Fracture Toughness of RCPB Matls to Resolve SER Confirmatory Issue 17,per NRC Request.Changes Will Be Incorporated in Future FSAR Amend)
  • ML20238C370  + (Forwards Proposed Revs to FSAR Re Spent Fuel Racks to Be Added to West Pool & Summary Rept on Rack Design & Layout & Seismic & Criticality Analyses for NRC Review.Installation Will Begin in Apr 1988)
  • ML20071E574  + (Forwards Proposed Revs to FSAR Requested During 830304 Discussions W/Nrc.Changes Consistent W/Previous Util Ltrs & Guidance Provided in NRC .Proposed Revs Will Be Incorporated Into Future FSAR Amend)
  • NPL-95-0169, Forwards Proposed Revs to FSAR Section 1.8, QA Program. Section 1.8 of FSAR Describes Current Nuclear QA Program Implemented for Plant  + (Forwards Proposed Revs to FSAR Section 1.8, QA Program. Section 1.8 of FSAR Describes Current Nuclear QA Program Implemented for Plant)
  • NPL-94-0105, Forwards Proposed Revs to FSAR Section 1.8, QA Program. Section 1.8 of FSAR Describes Current QA Program Implemented for Plant  + (Forwards Proposed Revs to FSAR Section 1.8, QA Program. Section 1.8 of FSAR Describes Current QA Program Implemented for Plant)
  • ML20151S969  + (Forwards Proposed Revs to FSAR Section 9.1.3 Re Addl Heat Loads & Results of Analysis to Demonstrate Ability of Spent Fuel Pool Coolong Sys to Maintain Unit 2 Spent Fuel Pool Temp within SRP Guidelines)
  • RBG-19-576, Forwards Proposed Revs to FSAR Sections 1.8,8.3.1 & 14.2. Revs Establish Qualified Load for Each Diesel Generator, Provide Positions on Reg Guides 1.9 & 1.108 & Address HPCS Independence  + (Forwards Proposed Revs to FSAR Sections 1.8,8.3.1 & 14.2. Revs Establish Qualified Load for Each Diesel Generator, Provide Positions on Reg Guides 1.9 & 1.108 & Address HPCS Independence)
  • ML20206L399  + (Forwards Proposed Revs to Final Draft of Combined Tech Specs Resulting from NRC 881114-15 Meetings W/Licensee.Meeting Summary Also Encl.Completion of Action 28 Re Action Statement for Tech Spec 3.7.6 Among NRC Concerns)