Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17312A719 + (Forwards COLR PVNGS Unit 2 Cycle 7, Rev 0)
- ML17312A721 + (Forwards COLR PVNGS Unit 2 Cycle 7, Rev 0)
- ML17310B308 + (Forwards COLR PVNGS Unit 3 Cycle 5, Rev 1,signifying Rev 1 on Cover Page,Revising History Page,Changing Document Content & Changing Figure 9,page 17 to Reflect Unit 3 Cycle 5 Specific DNBR Margin Operating Limit)
- ML17310B309 + (Forwards COLR PVNGS Unit 3 Cycle 5, Rev 1,signifying Rev 1 on Cover Page,Revising History Page,Changing Document Content & Changing Figure 9,page 17 to Reflect Unit 3 Cycle 5 Specific DNBR Margin Operating Limit)
- ML17312B110 + (Forwards COLR Palo Verde Nuclear Generating Station Unit 1, Rev 0)
- ML17312B111 + (Forwards COLR Palo Verde Nuclear Generating Station Unit 1, Rev 0)
- ML20115A296 + (Forwards COLR Seabrook Station Unit 1,Cycle 3)
- ML17354A678 + (Forwards COLR Unit 4 Cycle 17, for Turkey Point IAW TS 6.9.1.7)
- L-97-238, Forwards COLR Unit 4 Cycle 17, for Turkey Point IAW TS 6.9.1.7 + (Forwards COLR Unit 4 Cycle 17, for Turkey Point IAW TS 6.9.1.7)
- ML18038B829 + (Forwards COLR for BFN Unit 3 Cycle 8 Operation IAW Requirements of TS 6.9.1.7)
- ML18038B830 + (Forwards COLR for BFN Unit 3 Cycle 8 Operation IAW Requirements of TS 6.9.1.7)
- ML20206U894 + (Forwards COLR for Braidwood Unit 1 Cycle 8 & Unit 2 Cycle 7, Per GL 88-16 & Ts.Cores Were Designed to Operate within Approved Fuel Design Bases,Ts & Related Bases)
- ML20210P468 + (Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met)
- ML20115H280 + (Forwards COLR for Cycle 18,Rev 2 to Provide Corrected Power Dependent Minimum CPR Limits,Figure 3 of COLR)
- ML20084K739 + (Forwards COLR for Cycle 6 Operations)
- B17837, Forwards COLR for Cycle 7, for Millstone Unit 3,IAW TS 6.9.1.6.Explanation of Changes to COLR Also Encl + (Forwards COLR for Cycle 7, for Millstone Unit 3,IAW TS 6.9.1.6.Explanation of Changes to COLR Also Encl)
- ML20198K389 + (Forwards COLR for Farley Nuclear Plant Unit 1 Cycle 16,per TS 6.9.1.11)
- ML20100K351 + (Forwards COLR for LGS Unit 1,Reload 6,Cycle 7)
- ML20129F844 + (Forwards COLR for North Anna 2 Cycle 12 Pattern Cv, Rev 0)
- ML20129F849 + (Forwards COLR for North Anna 2 Cycle 12 Pattern Cv, Rev 0)
- ML20058C341 + (Forwards COLR for Peach Bottom Atomic Power Station Unit 3 Reload 9,Cycle 10)
- PY-CEI-NRR-1495, Forwards COLR for Perry Nuclear Plant,Unit 1,Reload 2, Cycle 4 & Rev 0 to 23A7147, Supplemental Reload Licensing Rept for Perry Nuclear Power Plant Unit 1,Reload 3,Cycle 4. Rev 0 to 23A7147AA Withheld (Ref 10CFR2.790) + (Forwards COLR for Perry Nuclear Plant,Unit 1,Reload 2, Cycle 4 & Rev 0 to 23A7147, Supplemental Reload Licensing Rept for Perry Nuclear Power Plant Unit 1,Reload 3,Cycle 4. Rev 0 to 23A7147AA Withheld (Ref 10CFR2.790))
- ML20113C473 + (Forwards COLR for Plant Unit 2 Cycle 11 Per TS 6.9.1.9)
- ML17311A859 + (Forwards COLR for Pvngs,Unit 1 Cycle 6, Rev 0)
- ML17311A860 + (Forwards COLR for Pvngs,Unit 1 Cycle 6, Rev 0)
- L-95-249, Forwards COLR for Turkey Point Unit 3 + (Forwards COLR for Turkey Point Unit 3)
- ML17354B158 + (Forwards COLR for Turkey Point Unit 3 Cycle 17, Per TS 6.9.1.7)
- L-98-260, Forwards COLR for Turkey Point Unit 3 Cycle 17, Per TS 6.9.1.7 + (Forwards COLR for Turkey Point Unit 3 Cycle 17, Per TS 6.9.1.7)
- ML17352A529 + (Forwards COLR for Turkey Point Unit 3, Per TS 6.9.1.7. Curve Applicable for Upcoming Operating Cycle of Unit 3 Cycle 14.Unit 3 Scheduled to Begin Refueling Outage on 940404)
- L-94-076, Forwards COLR for Turkey Point Unit 3, Per TS 6.9.1.7. Curve Applicable for Upcoming Operating Cycle of Unit 3 Cycle 14.Unit 3 Scheduled to Begin Refueling Outage on 940404 + (Forwards COLR for Turkey Point Unit 3, Per TS 6.9.1.7. Curve Applicable for Upcoming Operating Cycle of Unit 3 Cycle 14.Unit 3 Scheduled to Begin Refueling Outage on 940404)
- ML17353A357 + (Forwards COLR for Turkey Point Unit 3.)
- L-96-050, Forwards COLR for Turkey Point Unit 4 + (Forwards COLR for Turkey Point Unit 4)
- ML17355A287 + (Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7)
- ML17353A588 + (Forwards COLR for Turkey Point Unit 4.)
- L-94-268, Forwards COLR for Turkey Point Units 3 & 4 + (Forwards COLR for Turkey Point Units 3 & 4)
- L-93-318, Forwards COLR for Turkey Point Units 3 & 4 + (Forwards COLR for Turkey Point Units 3 & 4)
- ML17352A847 + (Forwards COLR for Turkey Point Units 3 & 4.)
- ML17352A361 + (Forwards COLR for Turkey Point Units 3 & 4.)
- ML17333A847 + (Forwards COLR for Unit 1,Cycle 16,IAW Cook Nuclear Plant TS 6.9.1.9.4)
- ML17333A848 + (Forwards COLR for Unit 1,Cycle 16,IAW Cook Nuclear Plant TS 6.9.1.9.4)
- ML20217E795 + (Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5)
- ML17312B380 + (Forwards COLR for Unit 3,Cycle 7,Revs 0 & 1)
- ML17312B381 + (Forwards COLR for Unit 3,Cycle 7,Revs 0 & 1)
- ML20129E542 + (Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4)
- BVY-96-129, Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4 + (Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4)
- ML20076L591 + (Forwards COLR for Vogtle Electric Generating Plant (VEGP) Unit 1 Cycle 6 & Rev 2 to COLR for VEGP Unit 2 Cycle 4)
- ML17312A826 + (Forwards COLRs Unit 1 Cycle 6,Rev 2,Unit 2 Cycle 7,Rev 1, Unit 3 Cycle 6,Rev 3)
- ML17312A827 + (Forwards COLRs Unit 1 Cycle 6,Rev 2,Unit 2 Cycle 7,Rev 1, Unit 3 Cycle 6,Rev 3)
- ML20037A790 + (Forwards CP & OL Application & Notice of Receipt of Application & Discusses Future Fl/Aec Coordination.W/O Encl)
- ML20037A792 + (Forwards CP & OL Application & Related Fr Notice.W/O Encl)
- ML20087B803 + (Forwards CP Amend Request Authorizing Extension of Const Completion Date from 910601 to 010601)
- ML19329C637 + (Forwards CP Application for Antitrust Advice.W/O Encl)