ML18038B829

From kanterella
Jump to navigation Jump to search
Forwards COLR for BFN Unit 3 Cycle 8 Operation IAW Requirements of TS 6.9.1.7
ML18038B829
Person / Time
Site: Browns Ferry 
Issue date: 03/11/1997
From: Abney T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18038B830 List:
References
NUDOCS 9703190016
Download: ML18038B829 (8)


Text

CATEGORY j.

REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9703190016 DOC.DATE: 97/03/11 NOTARIZED: NO DOCKET I FACI- "58=296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.h1AME;'UTHOR AFFILIATION ABNEY,T.E.

Tennessee Valley Authority RECIP.NAME'ECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards COLR for BFN Unit 3 Cycle 8 operation IAW requirements of TS 6.9.1.7.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT ID CODE/NAME PD2-3 WILLIAMS,J.

INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

0 1

1 RECIPIENT ID CODE/NAME PD2-3-PD 1

NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL

.13

4k f"

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 March 11, 1997 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of Tennessee Valley Authority Docket No. 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 3 -

CORE OPERATING LIMITS REPORT FOR. UNIT 3 CYCLE 8 OPERATION In accordance with the requirements of Technical Specification 6.9.1.7, TVA is submitting in the enclosure the Core Operating Limits Report for BFN Unit 3 Cycle 8

operation.

There are no new commitments contained in this letter.

If you have any questions, please contact me at (205) 729-2636.

Si cerely, T. E. Abney Manager of.Lic nsin and Industry fai s Enclosure cc:

See page 2

9703190016 9703ii PDR ADQCK 05000296 p

PDR

~

W.

I

fJ.Q. Nuclear Regulatory Commission Page 2

March ll, 1997 Enclosure cc (Enclosure):

Mr..Mark S. Lesser,,

Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900

Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road
Athens, Alabama 35611 Mr. J,.

F. Williams, Project Manager U.S. Nuclear Regul'atory Commission One White Flint, North 11555 Rockville Pike

'Rockville, Maryland 20852

0

~I C

I~P

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNIT 3 CORE OPERATING LIMITS REPORT FOR CYCLE 8 OPERATION (SEE ATTACHED)

4 0

~,

'I JP C