L-95-249, Forwards COLR for Turkey Point Unit 3
| ML17353A356 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/08/1995 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17353A357 | List: |
| References | |
| L-95-249, NUDOCS 9509190037 | |
| Download: ML17353A356 (4) | |
Text
PRIORITY 1 t (ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9509190037 DOC.DATE: 95/09/08 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit3, Florida Power and Light C 05000250 AUTH.NAME AUTHOR AFFXLIATION PLUNKETT,T.F.
Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards
."COLR for Turkey Point Unit 3."
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL TITLE: OR Submittal:
General Distribution
,NOTES:
SIZE: /~
XNTERNA RECIPIENT ID CODE/NAME PD2-1 LA CROTEAU,R E
C NTE
/ORCH/HICB NRR/DSSA/SRXB OGC/HDS3 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
0 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT COPIES LTTR ENCL 1
1 1
1 1
1 1
1 EXTERNAL: NOAC 1
1 NRC PDR 1
1 NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
- DESK, ROOM OWFN 5D8 (415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL 11
t
SEP08 t995 L-95-249 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Re:
Turkey Point Unit 3 Docket No. 50-250 Core 0 eratin Limits Re ort By letter dated October 12, 1994, the NRC issued Amendment 167 to Facility Operating License No.
DPR-31 for Turkey Point Unit 3.
The amendment consisted of changes to the Technical Specifications to relocate certain cycle-specific parameter limits from the Technical Specifications to a Core Operating Limits Report (COLR).
In accordance with Technical Specification 6.9.1.7, the enclosed Core Operating Limits Report is provided for Turkey Point Unit 3.
These curves are applicable for Unit 3 Cycle 15.
If you have any questions, please contact us.
Very truly yours, T. F. Plunkett Vice President Turkey Point Plant Attachment cc:
S.
D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Sr. Resident Inspector, USNRC, Turkey Point
~~GO43 an FPL Group company rrr50'rr190037 950'rr08 PDR ADOCK 05000250 PPDR