L-95-249, Forwards COLR for Turkey Point Unit 3

From kanterella
Jump to navigation Jump to search
Forwards COLR for Turkey Point Unit 3
ML17353A356
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 09/08/1995
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17353A357 List:
References
L-95-249, NUDOCS 9509190037
Download: ML17353A356 (4)


Text

PRIORITY 1 t (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9509190037 DOC.DATE: 95/09/08 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit3, Florida Power and Light C 05000250 AUTH.NAME AUTHOR AFFXLIATION PLUNKETT,T.F.

Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards

."COLR for Turkey Point Unit 3."

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL TITLE: OR Submittal:

General Distribution

,NOTES:

SIZE: /~

XNTERNA RECIPIENT ID CODE/NAME PD2-1 LA CROTEAU,R E

C NTE

/ORCH/HICB NRR/DSSA/SRXB OGC/HDS3 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

0 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT COPIES LTTR ENCL 1

1 1

1 1

1 1

1 EXTERNAL: NOAC 1

1 NRC PDR 1

1 NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL

DESK, ROOM OWFN 5D8 (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL 11

t

SEP08 t995 L-95-249 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Re:

Turkey Point Unit 3 Docket No. 50-250 Core 0 eratin Limits Re ort By letter dated October 12, 1994, the NRC issued Amendment 167 to Facility Operating License No.

DPR-31 for Turkey Point Unit 3.

The amendment consisted of changes to the Technical Specifications to relocate certain cycle-specific parameter limits from the Technical Specifications to a Core Operating Limits Report (COLR).

In accordance with Technical Specification 6.9.1.7, the enclosed Core Operating Limits Report is provided for Turkey Point Unit 3.

These curves are applicable for Unit 3 Cycle 15.

If you have any questions, please contact us.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant Attachment cc:

S.

D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Sr. Resident Inspector, USNRC, Turkey Point

~~GO43 an FPL Group company rrr50'rr190037 950'rr08 PDR ADOCK 05000250 PPDR