Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Fonsi with Associated Environmental Assessment". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20071Q258  + (Followup to Final Deficiency Rept Re Svc Water Sys Mods.Due to Delay at Vendor Facility,Pump Will Not Be Returned to Site Until 830331)
  • ML20080B285  + (Followup to Final Deficiency Rept on Item M-53 Re Defective Torque Switches in Limitorque Operators.Completion of Corrective Action Contingent Upon Relaxation of NRC 821112 Order Suspending Const of Facility)
  • ML16342C346  + (Followup to Gulf States Utils Part 21 Rept Re Wound Rotor Pole in Generator Unit of Standby Diesel Generator.Generator Mfg by NEI Peebles - Electric Products,Inc & Supplied to Util by Imo Delaval,Inc.Failure Analysis Being Conducted)
  • L-PI-16-098, Followup to Interim Report Submitted Under 10 CFR 21.21(a)(2) Regarding a Failed Bench Test of a Clark Relay Model 4U3-130  + (Followup to Interim Report Submitted Under 10 CFR 21.21(a)(2) Regarding a Failed Bench Test of a Clark Relay Model 4U3-130)
  • ML042790480  + (Followup to Meeting on Defense in Depth and Diversity Assessment Associated with the Digital Upgrade of Oconees Reactor Protective System and Engineered Safeguards Protective System)
  • ML18033A230  + (Followup to NPDES Noncompliance Notification Re Repair of Sedimentation Pond.Repair Started 871221 & Concluded on 880210.Seepage Observed on 880321 So Pond Not Placed Back in Svc Until Further Repairs Undertaken)
  • ML20046D224  + (Followup to NPDES Noncompliance Notification:On 930721, Notified of Failure of Chronic Toxicity Test on Combined Samples Collected from Waste Water Collection Basin,Outfall 005 on 930713 & 19.Unwatering Process Initiated on 930717)
  • ML20101L205  + (Followup to Part 21 Rept Re Failures of gould-shawmut Fuses. Initial Investigation Into Issue Revealed Certain Percentage of Fuses Developed Cracks in Fuse Elements)
  • ML20081H480  + (Followup to Part 21 Rept Re Potential Failure of Westinghouse Type SA-1 Relays (IE Info Notice 83-63).Addl Potential Problems Discussed in Encl Ltr Re Tantalum Capacitor Leaking Electrolyte.Not Reportable Per Part 21)
  • ML20116L431  + (Followup to Part 21 Rept from Consolidating Power Supply, Inc Re Purchase & Procurement of 24-inch Flange at Facility Which Failed to Meet ASME Code Class III Requirements.Flange Purchased by Conex Pipe Sys,Inc.Investigation Underway)
  • ML19268C174  + (Followup to RO 79-152/01T-0:on 791118,Westinghouse Notified Util of Potential Reduction in Conservatism Re Error Allowances Assumed in Analysis for Power Range Neutron Flux High Negative Rate.Setpoints Will Be Changed)
  • ML19273B350  + (Followup to RO 79-2 on 790305: Electric Power to Facility Momentarily Interrupted,Causing Shutdown in Form of Silent Reactor Scram.No Corrective Action Feasible)
  • ML19319D813  + (Followup to RO-77-16:on 771129,dry Fluid Accumulator Discovered on Safety Sys Hydraulic Snubber Caused by Failing O-ring.Original Polyurethene Seals Were Replaced w/ethylene- Propylene & One Unit Apparently Was Overlooked.Ler Encl)
  • ML19319D846  + (Followup to RO-78-03:on 780418,low Fluid Accumulator Level Discovered on Safety Sys Hydraulic snubber.780505 Insp Showed Fluid Level Decrease.Caused by Deteriorated O-rings in Snubber Valve.Rings Replaced w/ethylene-propylene Seals)
  • ML19319D843  + (Followup to RO-78-04:on 780614,util Reported That Small Break Analysis Not Based on Worst Break Location.B&W Submitted Analysis Rept on 780618.Tech Spec Change 588 Requested 780713.Full Power Authorization Received 780720)
  • ML19206A648  + (Followup to Re 10CFR50.55(e) Occurrence Involving Small Bore Cast Stainless Steel Socket Weld End Globe & Check Valves.Valve Testing Procedures Adequate)
  • ML19312E936  + (Followup to Responses to Anti-Nuclear Group Representing York Interrogatories.Includes Info Re PEMA Rept on Mass Core Capacity.Affidavit & Certificate of Svc Encl.Related Correspondence)
  • ML20071C164  + (Followup to Significant Deficiency Rept SD 414/83-02 Re Linear Indications in Base Metal of Welds Mfg by Custom Alloy,Inc.Results of Full Investigation Will Be Provided by 830311)
  • ML20151G892  + (Followup to Telcon Re EPA Negotiated Rulemaking Project & Low Level Waste (LLW) Rule.Informs That EPA Decided to Negotiate Alternative Rule Because Rule Selection Criterion Not Met & Will Set LLW Std Using Traditional Process)
  • ML19323F955  + (Followup to Third Set of Interrogatories Directed to State of PA Re PA Responses to Interrogatory 2,a,b & C.Includes Question Re Average Exposure as Opposed to Actual Exposure. W/Certificate of Svc.Related Correspondence)
  • ML17325A648  + (Followups Re Potential Shifts in Limiting Size Small Break LOCA Due to Closure of Safety Injection Sys cross-tie Valves for Unit 1.Background Info & Summary of Evaluations & Westinghouse Response,For Unit 2,encl)
  • ML20209G957  + (Followups Telcons Re Foreign Liaison Contract.Fee for First Modal Test Conducted in Japan Under Negotiation.Work for Agbabian Phase 1 Data Processing Not Yet Begun for Listed Reasons.Invoices & Financial Proposal Encl)
  • ML20149D893  + (Followups on Commitment in 870123 Application for Amend to License DPR-50 Re Heat Sink Protection Sys Operational (Hsps) Bypass Capability.Operational Bypass of Hsps Low once-through Steam Generator Not Needed for Future Cycles)
  • ML20236S380  + (Followups to 870624 Notification of Loss of Static Eliminators.Survey of Garden Grove Plant Will Be Conducted by Using Eberline Radiation Monitor to Verify That No Source Present)
  • ML082620120  + (Folsom Intake, Helo Pad, South Scrap Yard Combined Survey, Survey Unit F8000011)
  • ML20266A085  + (Folw Diagram of Waste Gas System (Wg), as-built)