Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20071Q258 + (Followup to Final Deficiency Rept Re Svc Water Sys Mods.Due to Delay at Vendor Facility,Pump Will Not Be Returned to Site Until 830331)
- ML20080B285 + (Followup to Final Deficiency Rept on Item M-53 Re Defective Torque Switches in Limitorque Operators.Completion of Corrective Action Contingent Upon Relaxation of NRC 821112 Order Suspending Const of Facility)
- ML16342C346 + (Followup to Gulf States Utils Part 21 Rept Re Wound Rotor Pole in Generator Unit of Standby Diesel Generator.Generator Mfg by NEI Peebles - Electric Products,Inc & Supplied to Util by Imo Delaval,Inc.Failure Analysis Being Conducted)
- L-PI-16-098, Followup to Interim Report Submitted Under 10 CFR 21.21(a)(2) Regarding a Failed Bench Test of a Clark Relay Model 4U3-130 + (Followup to Interim Report Submitted Under 10 CFR 21.21(a)(2) Regarding a Failed Bench Test of a Clark Relay Model 4U3-130)
- ML042790480 + (Followup to Meeting on Defense in Depth and Diversity Assessment Associated with the Digital Upgrade of Oconees Reactor Protective System and Engineered Safeguards Protective System)
- ML18033A230 + (Followup to NPDES Noncompliance Notification Re Repair of Sedimentation Pond.Repair Started 871221 & Concluded on 880210.Seepage Observed on 880321 So Pond Not Placed Back in Svc Until Further Repairs Undertaken)
- ML20046D224 + (Followup to NPDES Noncompliance Notification:On 930721, Notified of Failure of Chronic Toxicity Test on Combined Samples Collected from Waste Water Collection Basin,Outfall 005 on 930713 & 19.Unwatering Process Initiated on 930717)
- ML20101L205 + (Followup to Part 21 Rept Re Failures of gould-shawmut Fuses. Initial Investigation Into Issue Revealed Certain Percentage of Fuses Developed Cracks in Fuse Elements)
- ML20081H480 + (Followup to Part 21 Rept Re Potential Failure of Westinghouse Type SA-1 Relays (IE Info Notice 83-63).Addl Potential Problems Discussed in Encl Ltr Re Tantalum Capacitor Leaking Electrolyte.Not Reportable Per Part 21)
- ML20116L431 + (Followup to Part 21 Rept from Consolidating Power Supply, Inc Re Purchase & Procurement of 24-inch Flange at Facility Which Failed to Meet ASME Code Class III Requirements.Flange Purchased by Conex Pipe Sys,Inc.Investigation Underway)
- ML19268C174 + (Followup to RO 79-152/01T-0:on 791118,Westinghouse Notified Util of Potential Reduction in Conservatism Re Error Allowances Assumed in Analysis for Power Range Neutron Flux High Negative Rate.Setpoints Will Be Changed)
- ML19273B350 + (Followup to RO 79-2 on 790305: Electric Power to Facility Momentarily Interrupted,Causing Shutdown in Form of Silent Reactor Scram.No Corrective Action Feasible)
- ML19319D813 + (Followup to RO-77-16:on 771129,dry Fluid Accumulator Discovered on Safety Sys Hydraulic Snubber Caused by Failing O-ring.Original Polyurethene Seals Were Replaced w/ethylene- Propylene & One Unit Apparently Was Overlooked.Ler Encl)
- ML19319D846 + (Followup to RO-78-03:on 780418,low Fluid Accumulator Level Discovered on Safety Sys Hydraulic snubber.780505 Insp Showed Fluid Level Decrease.Caused by Deteriorated O-rings in Snubber Valve.Rings Replaced w/ethylene-propylene Seals)
- ML19319D843 + (Followup to RO-78-04:on 780614,util Reported That Small Break Analysis Not Based on Worst Break Location.B&W Submitted Analysis Rept on 780618.Tech Spec Change 588 Requested 780713.Full Power Authorization Received 780720)
- ML19206A648 + (Followup to Re 10CFR50.55(e) Occurrence Involving Small Bore Cast Stainless Steel Socket Weld End Globe & Check Valves.Valve Testing Procedures Adequate)
- ML19312E936 + (Followup to Responses to Anti-Nuclear Group Representing York Interrogatories.Includes Info Re PEMA Rept on Mass Core Capacity.Affidavit & Certificate of Svc Encl.Related Correspondence)
- ML20071C164 + (Followup to Significant Deficiency Rept SD 414/83-02 Re Linear Indications in Base Metal of Welds Mfg by Custom Alloy,Inc.Results of Full Investigation Will Be Provided by 830311)
- ML20151G892 + (Followup to Telcon Re EPA Negotiated Rulemaking Project & Low Level Waste (LLW) Rule.Informs That EPA Decided to Negotiate Alternative Rule Because Rule Selection Criterion Not Met & Will Set LLW Std Using Traditional Process)
- ML19323F955 + (Followup to Third Set of Interrogatories Directed to State of PA Re PA Responses to Interrogatory 2,a,b & C.Includes Question Re Average Exposure as Opposed to Actual Exposure. W/Certificate of Svc.Related Correspondence)
- ML17325A648 + (Followups Re Potential Shifts in Limiting Size Small Break LOCA Due to Closure of Safety Injection Sys cross-tie Valves for Unit 1.Background Info & Summary of Evaluations & Westinghouse Response,For Unit 2,encl)
- ML20209G957 + (Followups Telcons Re Foreign Liaison Contract.Fee for First Modal Test Conducted in Japan Under Negotiation.Work for Agbabian Phase 1 Data Processing Not Yet Begun for Listed Reasons.Invoices & Financial Proposal Encl)
- ML20149D893 + (Followups on Commitment in 870123 Application for Amend to License DPR-50 Re Heat Sink Protection Sys Operational (Hsps) Bypass Capability.Operational Bypass of Hsps Low once-through Steam Generator Not Needed for Future Cycles)
- ML20236S380 + (Followups to 870624 Notification of Loss of Static Eliminators.Survey of Garden Grove Plant Will Be Conducted by Using Eberline Radiation Monitor to Verify That No Source Present)
- ML082620120 + (Folsom Intake, Helo Pad, South Scrap Yard Combined Survey, Survey Unit F8000011)
- ML20266A085 + (Folw Diagram of Waste Gas System (Wg), as-built)
- ML22126A054 + (Fonsi with Associated Environmental Assessment)
- EPID:L-2021-LLE-0030 + (Fonsi with Associated Environmental Assessment)
- ML20202B243 + (Fonsi,Proposed Remedial Action for Falls City U Mill Tailing Site Fall City,Tx)
- ML20196K037 + (Foorwards Draft Minutes of Mgt Review Board 981013 Meeting, for Review & Concurrence)
- ML20154R516 + (Foorwards May Status Rept Re Current Review Milestones for Std Plants (Epri,Advanced Bwr,Resar SP/90 & C-E Sys 80+))
- ML083530209 + (For 10 CFR 2.206 Petition Dated 9/28/08 on the Vermont Yankee EDG)
- ML090290119 + (For 4th 10-Year ISI and Grand Gulf, Unit 1, River Bend, and Waterford, Unit 3 for 3rd 10-Year ISI - Request for Alternative CEP-PT-002, Visual Examination of Vent, Drain, and Branch Leakage Tests (TAC Nos. MD8819 to MD8822))
- ML16062A016 + (For ACRS on 03-22-2016)
- 05000443/LER-2004-001, For Accident Monitoring Instruments Inoperable Due to Inadequate Indicating Range + (For Accident Monitoring Instruments Inoperable Due to Inadequate Indicating Range)
- ML20141K694 + (For Agreement:Executed Amend 15 to Indemnity Agreement E20,changing Item 2)
- ML13308B548 + (For All Future Correspondence W/Sce Re Subj Facils,Re Woodbury Is to Be Deleted from Svc List & Replaced by CR Kocher)
- 05000313/LER-2009-002, For Arkansas Nuclear One, Regarding Manual Reactor Trip from Power in Response to a Fire at the Main Generator Hydrogen Addition Station Caused by a Personnel Error + (For Arkansas Nuclear One, Regarding Manual Reactor Trip from Power in Response to a Fire at the Main Generator Hydrogen Addition Station Caused by a Personnel Error)
- 05000313/LER-2002-003, For Arkansas Unit 1 Reactor Coolant System Pressure Boundary Leakage from a Crack in a Control Rod Drive Mechanism Nozzle Reactor Vessel Head Penetration Weld Due to Previous Weld Repair Method + (For Arkansas Unit 1 Reactor Coolant System Pressure Boundary Leakage from a Crack in a Control Rod Drive Mechanism Nozzle Reactor Vessel Head Penetration Weld Due to Previous Weld Repair Method)
- 05000334/LER-2010-003, For Beaver Valley Power Station, Unit 1, Regarding Premature Lifting of ECCS Relief Valve Results in Post-Accident Outside-Containment Leakage Limits to Be Exceeded + (For Beaver Valley Power Station, Unit 1, Regarding Premature Lifting of ECCS Relief Valve Results in Post-Accident Outside-Containment Leakage Limits to Be Exceeded)
- 05000412/LER-2011-003, For Beaver Valley Power Station, Unit 2 Regarding Automatic Actuation of Standby Service Water Pumps Following Unexpected Service Water Pump Trip + (For Beaver Valley Power Station, Unit 2 Regarding Automatic Actuation of Standby Service Water Pumps Following Unexpected Service Water Pump Trip)
- 05000412/LER-1917-001, For Beaver Valley Power Station, Unit No. 2 Surveillance Testing Rendered Service Water System Inoperable Due to the Coupling of Seismic Category L Piping to Not Seismic Category 1 Piping + (For Beaver Valley Power Station, Unit No. 2 Surveillance Testing Rendered Service Water System Inoperable Due to the Coupling of Seismic Category L Piping to Not Seismic Category 1 Piping)
- 05000412/LER-2011-001, For Beaver Valley, Unit 2, Regarding Defective Fuel Injection Pump Supply Lines Provided by the Diesel Engine Manufacturer Results in an Emergency Diesel Generator Being Inoperable + (For Beaver Valley, Unit 2, Regarding Defective Fuel Injection Pump Supply Lines Provided by the Diesel Engine Manufacturer Results in an Emergency Diesel Generator Being Inoperable)
- 05000412/LER-2011-004, For Beaver Valley, Unit 2, Regarding Lead Time Constant for Steam Line Pressure Channel Found Out of Tolerance + (For Beaver Valley, Unit 2, Regarding Lead Time Constant for Steam Line Pressure Channel Found Out of Tolerance)
- 05000456/LER-2010-006, For Braidwood Station, Unit 1 Regarding Technical Specifications Allowed Outage Time Extension Request for Component Cooling System Contained Inaccurate Design Information That Significantly Impacted the Technical Justification + (For Braidwood Station, Unit 1 Regarding Technical Specifications Allowed Outage Time Extension Request for Component Cooling System Contained Inaccurate Design Information That Significantly Impacted the Technical Justification)
- 05000456/LER-2009-001, For Braidwood Station, Unit 1, Steam Generator Tube Exceeding Plugging Criteria Remained in Service During Previous Cycle + (For Braidwood Station, Unit 1, Steam Generator Tube Exceeding Plugging Criteria Remained in Service During Previous Cycle)
- 05000457/LER-2011-001, For Braidwood Station, Unit 2, Regarding Asiatic Clam Shells in Essential Service Water Supply Piping to the 2A Auxiliary Feedwater Pump Resulted in Auxiliary Feedwater Inoperability + (For Braidwood Station, Unit 2, Regarding Asiatic Clam Shells in Essential Service Water Supply Piping to the 2A Auxiliary Feedwater Pump Resulted in Auxiliary Feedwater Inoperability)
- 05000456/LER-2008-002, For Braidwood, Unit 1, Regarding Unit 1 Containment Isolation Valve 1PS229B De-energized Open Instead of Closed Per Technical Specification 3.6.3 + (For Braidwood, Unit 1, Regarding Unit 1 Containment Isolation Valve 1PS229B De-energized Open Instead of Closed Per Technical Specification 3.6.3)
- 05000457/LER-2009-003, For Braidwood, Unit 2, Regarding Drain Procedure for ECCS Suction Line Creates an Unanalyzed Condition Due to Inadequate Configuration Requirements + (For Braidwood, Unit 2, Regarding Drain Procedure for ECCS Suction Line Creates an Unanalyzed Condition Due to Inadequate Configuration Requirements)
- 05000259/LER-2012-006, For Browns Ferry Nuclear Plan, Unit 1, Regarding High Pressure Coolant Injection System Turbine Failed to Trip Using the Manual Trip Pushbutton + (For Browns Ferry Nuclear Plan, Unit 1, Regarding High Pressure Coolant Injection System Turbine Failed to Trip Using the Manual Trip Pushbutton)
- 05000259/LER-2010-004, For Browns Ferry Nuclear Plant Unit 1, Residual Heat Removal Low Pressure, Injection System Pump Motor Failure + (For Browns Ferry Nuclear Plant Unit 1, Residual Heat Removal Low Pressure, Injection System Pump Motor Failure)
- ML18283A852 + (For Browns Ferry Nuclear Plant, Unit 1, Reservoir Water Temperature Exceeding Maximum Temperature Rise of 5 Degrees F on 02/03/1977)