Followup to Significant Deficiency Rept SD 414/83-02 Re Linear Indications in Base Metal of Welds Mfg by Custom Alloy,Inc.Results of Full Investigation Will Be Provided by 830311
ML20071C164
Person / Time
Site: Catawba 
Issue date: 02/17/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, SD-414-83-02, SD-414-83-2, NUDOCS 8303010531
Download: ML20071C164 (1)


Text

-

e DUKE Rp,1(MS COMIMN M*Y' M T,4 C O. 'N O CIIAHl.OTTE, N.C. 28242 HAL B. TUCKER TER.EPIIONE (704) ON531 veom runsament Fe M 81% 1 l

" ~ ~

Mr. 'ames P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station Unit 2 Docket No. 50-414

Dear Mr. O'Reilly:

In accordance with 10 CFR 50.55e Significant Deficiency Report SD 414/83-02 concerning linear indications in the base metal of certain welds manufactured by Custom Alloy, Inc. was to be submitted by this date. During the course of the investigation additional information needed to file an adequate response was identified. A full evaluation will be provided by March 11, 1983.

Very truly yours, l'

-M Hal B. Tucker RWO/php cc: Director Mr. Robert Guild, Esq.

Office of Inspection & Enforcement Attorney-at-Law j

U. S. Nuclear Regulatory Commission P. O. Box 12097 l

Washington, D. C. 20555 Charleston, South Carolina 29412 Mr. P. K. Van Doorn Palmetto Alliance NRC Resident Inspector 2135 Devine Street Catawba Nuclear Station Columbia, South Carolina 29205 I

i l

l f.16FFICint COPY 8303010531 830217 PDR ADOCK 05000414 8